Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-Finance | ₹8.7 L | L1 | Accepted-Finance All documents Uploaded |
| 2 | L2₹8.7 L+₹7,706.73 (0.89%)Accepted-Finance | ₹8.7 L+₹7,706.73 (0.89%) | L2 | Accepted-Finance All documents Uploaded |
| 3 | L3₹8.8 L+₹13,075.47 (1.51%)Accepted-Finance | ₹8.8 L+₹13,075.47 (1.51%) | L3 | Accepted-Finance All documents Uploaded |
Tender Value
₹8.7 L
EMD Value
₹17,319
Closing Date
18 Jul 2026, 5:30 pmClosed
EXECUTIVE ENGINEER, PWD, DARJEELING DIVISION
OFFICE OF THE EXECUTIVE ENGINEER, PUBLIC WORKS DIRECTORATE, DARJEELING DIVISION, 8, Hooker Road, Post Box No. 59, Darjeeling 7 34 101.
Water harvesting at South Field College, Darjeeling under P.W.D Darjeeling Division .
2026_WBPWD_5016475_1
WBPWD/EE/DJ/eNIT 07 /2026-2027
Open Tender
CIVIL WORKS
Percentage
30 days
DARJEELING
Please Refer Tender Document
4 documents required · 4 mandatory
₹17,319
6 Aug 2026
11 Jul 2026
21 Jul 2026
11 Jul 2026
18 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SurfaceDressingof the ground inany kind of soil
including removing vegetation inequalities not
exceeding15cmdepthanddisposal of the rubbish
within a lead upto 75 m as directed. | - | SQM | 10 | - |
| 2 | Earthwork inexcavationof foundation trenches or
drains, inall sorts of soil (includingmixed soil but
excluding lateriteor sandstone) including removing,
spreadingorstackingthespoilswithinaleadof75m.
asdirected.Theitemincludesnecessarytrimmingthe
sidesof trenches, levelling,dressingandrammingthe
bottom, bailing out water as required complete.
a) Depth of excavation not exceeding 1,500 mm. | - | cum | 119.27 | - |
| 3 | b)Depthof excavation foradditional depthbeyond
1,500mm. and upto 3,000mm. but not requiring
shoring. | - | cum | 192.38 | - |
| 4 | Earthwork infillinginfoundationtrenchesorplinth
with good earth, in layers not exceeding 150mm.
includingwateringand rammingetc. layer by layer
complete. (Payment to be made on the basis of
measurement of finished quantity of work)
a) With earth obtained from excavation of foundation. | - | sqm | 77.54 | - |
| 5 | (A)Filling in foundationorplinthby silver sand in
layers not exceeding 150 mm as directed and
consolidating the same by thorough saturationwith
water, rammingcompleteincludingthecostofsupply
of sand. (payment to bemade onmeasurement of
finished quantity)
B) Do - by fine sand | 1 | cum | 2,117.68 | ₹2,115.56 |
| 6 | Labour for laying150mmto200mmboulder soling includingrough
dressinghandpackingandrammingdownsmallpieces intheinterstics
includingrolling andpreparingthebedtoproperlevelandfillingupall
joints with sandy clay or earth. | 1 | sqm | 251.35 | ₹251.1 |
| 7 | Removal of rubbish,earth etc. from theworking
site and disposal of the same beyond the
compound, in conformity with theMunicipal /
CorporationRulesforsuchdisposal, loadinginto
truckandcleaning the site inall respect asper
direction of Engineer in charge | 1 | cum | 606.7 | ₹606.09 |
| 8 | OrdinaryCement concrete (mix 1:2:4) with graded stone chips (20mm
nominal size)excludingshutteringandreinforcement,ifany, ingroundfloor
as per relevant IS codes.
(b) River bazree | - | cum | 6,370.8 | - |
| 9 | ControlledCement concrete withwell gradedstonechips (20mmnominal
size) excluding shuttering and reinforcement with complete design of concrete
asper IS : 456and relevant special publications, submission of jobmix
formulaafterpreliminarymixdesignafter testingof concretecubesasper
directionofEngineer-incharge.Consumptionofcementwillnotbelessthan
300Kg of cement with Super plasticiser per cubicmeter of controlled
concrete but actual consumption will be determined on the basis of
preliminarytestandjobmixfoumula. Ingroundfloorandfoundation.[using
concrete mixture]
M 25 Grade
(i) Pakur Variety | - | cum | 8,877.08 | - |
| 10 | Reinforcement for reinforced concrete work in all sorts of structures
including distribution bars, stirrups, binders etc initial straightening and
removalof looserust (ifnecessary),cuttingtorequisitelength,hookingand
bending tocorrect shape, placing inproperpositionandbindingwith16
gaugeblackannealedwireat every intersection, completeasperdrawing
and direction. | 1 | MT | 73,061.87 | ₹72,988.81 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
5784_notification.pdf
Additional Documents • 0.61 MB
BOQ_5085999.xls
BOQ • 0.41 MB
2911ii.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .