Tender Value
₹42.8 L
EMD Value
₹85,580
Closing Date
27 Dec 2019, 4:00 pmClosed
EXECUTIVE ENGINEER
O/o Executive Engineer, MMJHS Jammu
Emergency stabilization, Consolidation and Face lifting work at Various Building locations at Mubarak Mandi complex, Jammu.
2019_Tourm_88434_1
E-NIT/MMJHS/19 OF 2019-20 Dt. 17-12-2019
Open Tender
Civil Works
90 days
JAMMU
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
Mubarak Mandi Jammu Heritage Society
₹85,580
Yes
13 Feb 2020
17 Dec 2019
28 Dec 2019
17 Dec 2019
27 Dec 2019
18 Dec 2019
Amount
Removal of jungle grass / creepers from the terrace and other parts of the monument / abbuting monumnet, including uprooting of rank vegetation, grass, bush wood, and saplings and removal of rubbish upto a lead of 100 mts. Without damaging the monument/ its historic fabric.
De vegetation from the monuments by chemical injection of Round Up (arsenic base) compound and subsequently uprooting of all girth and any height by physical means without damaging the historic fabric and structure of the building under strict supervision of conservation architect/site incharge, removal of rubbish up to a distance of 50 m outside the periphery of the area cleared, complete.
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Careful demolition of moduler/ lakhori/traditional (of any brick size) brick work manually in lime /cement mortar including stacking of serviceable material and disposal of unserviceable material within any lead as per direction of Engineer-in-charge at all heights inclusive of all leads/ lifts required to undertake the work without damaging the historic fabric of the building .
Careful Demolition of R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 100 metres lead as per direction of Engineer - incharge.
Careful demolition lime concrete manually and disposal of material within any lead as per direction of Engineer in-charge /Consultants .Item includes cost of safety measure /use of specified equipment for workers of building required to complete the work .
Careful removal of woodwork in frames, trusses, purlins (Karis) and rafters upto 10m span and 6 mtr height including stacking of the material, all heights and section sizes, as directed by Engineer incharge/ Architect, and including all leads, lifts and carriage. All complete.
Careful removal of wooden planks used in roofing & flooring (traditional roofing planks fixed above beam) upto 10m span including stacking of the material, all heights and section sizes, as directed by Engineer incharge/ conservation architect, and including all leads, lifts, scaffolding /support system required to complete the work and carriage. All complete.
Stitching the cracks in brick masonry using brick and lime mortar matching the traditional lime mortar and bricks as existing in the historic structure after raking, cleaning and washing the cracks, as directed by Engineer incharge/ Architect, and including all leads, lifts and carriage. All complete.
Stitching of Traditional brickwork by inserting red sand stone of size 600 X 300 X 100 MM at identified locations by engineer in charge / architect and grouting the area with lime mortar 1:1 (1 lime: 1 Surkhi) including preparing like cutting out brickwork, teething, cleaning, grouting etc.For all heights and stacking of malba within 100 mtr lead.cleaning and washing the cracks, as directed by Engineer incharge/ Architect, and including all leads, lifts and carriage. All complete.
Traditional brick masonry with special brick size in lime mortar in propotion similar to the existing traditional lime mortar (lime putty -surkhi 1:2) after removing the damaged and out of plumb masonry from the historic structure, as directed by Engineer incharge/ Architect, and including all leads, lifts and carriage. All complete.or superstructure for all heights
Providing and laying of 150 to 200 mm thick lime dhar on roofing/walls / open portion of walls etc as per traditional practice in 1:2:2:2 (1 lime: 2 sand: 2 old lime powder: 2 brick aggregate 12mm to 40 mm nominal size) using methi, gur, hemp, belgiri etc. including beating and temping as per specification. as directed by Engineer incharge/ Consultants , and including all leads, lifts and carriage. All complete.
Underpinning brickwork in matching / best lime mortar(1:1) with the brick courses of the historic structure in traditional brick masonry with special brick for superstructures by joining old brickwork with new brickwork. Grooves shall be cut 5cm deep in alternate course of old brickwork, as directed by Engineer incharge/ Architect, and including all leads, lifts and carriage. All complete.
Providing and fixing polithin sheet / polyproplene sheet on exsiting damaged glass /wooden window panes/pannel as directed by Engineer incharge/ Architect
Lime plaster 15 to 40 MM thickness on flat wall/vertical surfaces Providing and application of Lime – surkhi Plaster 1:1 (1 slaked Lime: 1 surkhi) on wall surfaces of thickness between 15 to 40 MM including organic additives like sugarcane molasses, extracts of beil,maithi, etc. as per traditional practices. The preparation of mortar is to be done following traditional practice includes using chakki/garat (wet grinding of lime and sand by heavy stone mill / chakki/garat), application of mortar in 3 layers with last layer of 6 MM thick, with a gap of minimum 3 days and not more than 10 days from previous layer. The item rate includes application of Loi, tampering, beating, reworking of plaster till the shrinkage cracks disappear and desired finish achieved and curing for 10 days. Item also includes all lead and lift, establishing work yard / chakki, scaffolding, formwork tools and implements etc.
Providing new decorative Stucco work in lime, sand, Surkhi mortar, (1:2:1) 20 mm - 40mm thick as per existing design work/ traditional practices by skilled craftsman, the stucco work should be done as per restoration nature, the mortar should be prepared by grinding mill adding gur, methi & gugal. Sample of the design and details of the decorative stucco work to be shown to the consultants for necessary approvals before finalizing and finishing the same in Lime and Sand plaster in proportions 1:2 with the same, not more than 10 mm in thickness and a final coat of 5 mm Thick lime putty. Item to be paid only for the part of the design made in new plaster and not the entire panel. Item to include curing for 21 days using water pumps or any other necessary methods to avoid any surface cracks. In case of development of surface cracks, the same to be redone as part of rectification works to achieve the necessary level of finish as directed by Consultants or Engineer-in-charge. Item to include all necessary tools, scaffold if required etc. complete
Providing & applying Lime kara 1:2 (1lime cream : 2 Zikki powder) grinding mortar with grinding mill/manually on lime base,on all flat surface in two coats.First coat applying 3mm to 4mm thick and curing properly at least 7 days,second finishing coat done after 7days of previous coat as per traditional practice.(thickness not more than 6 mm.)
Providing lime kara on decorative/ornamental surfaces/stucco or embellishments as per decorative /ornamental designs as per old existing carving on surface highly precise
Repairing of existing jharokha as per old design intact ,including replacement of damaged wooden member with deodar wood /masonry work werever required and finish with wooden polish as per prescribed process and specification and polishing of fixture .Item includes cost of shuttering /scaffolding /safety measure /use of specified equipment for workers of building required to complete the work .
Providing and laying APP modified pree fabricated 7 layers 3 mm thick water proofing membrane ,black finished reinforced with non woven polyster matt consisting of a coat of bitumin primer for botumen membrane @.4 ltr /sq mtr by the same membrane manufacture of density at 25 degree centigrade ,0.87-0.89 kg/lt and viscosity of 70-160 cps .the laying of membrane shall be got done through authorised applicator of the manufacturer of membrane including laying of geo textile cloth of 70 mils thickness over the APP layer all inclusive and complete.
Lime plaster 20 mm thick 1:1 (1 slaked Lime: 1 surkhi) on over the stone/ wooden slab/terrace of desired level of app sheet including organic additives like sugarcane molasses, extracts of beil,maithi, etc. as per traditional practices.Item includes cost of shuttering /scaffolding /safety measure /use of specified equipment for workers required to complete the work.
M/S ravindra kumar
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid