Tender Value
₹7.4 Cr
EMD Value
₹5.2 L
Closing Date
5 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
WORKS
18 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
With the submission of the certificate/affidavit as mentioned, the practice of verification of tenderer's documents by the Railway dispensed with. Instruction for bidders, in this regards are:
Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification of lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway thereunder.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest Money Deposit (EMD),Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 5 (five) years.
With such a system of self-certification of credentials, tender finalization should also be speeded up. The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90days) from the date of closing of the Tender.
143 conditions · 1 needing a document upload
Any payment required for E-Tendering is accepted through Net Banking or Payment Gateway only.
Credentials in support of fulfillment of eligibility criteria ( Without these documents the offer is liable to be rejected) as per details stipulated in Tender documents. Each and every pages of the supporting documents should be signed with proper seal and date.
Details of technical personnel with qualification and experience employed by the firm.
Details of special equipments , tools and plants, machinery etc available with the firm for execution of contract works.
If working through contract labour , the contractor must resgister with Labour Commissioner and necessary license to be submitted with tender or to be produced before signing of contract agreement.
Partnership deed, if any, constitution of the firm and copies of power of attorney and other connected legal documents to be submitted.
Submission of requisite information for Financial Eligibility criteria as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
All required documents duly attested as per Para 14.0 of IRGCC must be submitted.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Execution of Signaling & Telecommunication work in connection with: (1) Provision of Dual MSDAC on Rusty Rail of DC Track Circuits at RSD, RSA, GDZ, LBO, BXA, & BMY Central stations of Raipur Division, (2) Creation of Trip maintenance/Advance Inspection Centre for Inspection & Maintenance of Electric Locomotive at Durg.
SNT-R-2025-24~SECR
SNT-R-2025-24
Open
Works - General
12 Months
Raipur, Chhattisgarh
₹0
₹5.2 L
5 Jan 2026
11 Dec 2025
22 Dec 2025
75 items across 3 schedules · ₹7,42,69,713.94 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Excavation of trench Depth 1.0 Mtr. & width 0.3 Mtr and clearing of roots of trees, bushes, ballast and reconditioning etc., including bailing out water and disposal of extra soil in all soils including soft rocky area. | Kilometre 8.00 | — | 76,590 | 6,12,720 |
| 2 | Excavation of trench in all kinds of soils including softrockyarea and clearing of roots of trees, bushes, rocks,ballastetc., to a depth of 1 Mtr. & width 0.3M for track/puccaroad/Platform crossing/ level crossing and any other placeasadvised by the Engineer-incharge includingsupply,transportation and laying of RCC pipe with collars(forjointing pipe) 150mm nominal dia to Spec.No:IS-458intrench and drawing of Signalling/ Power/ Quadcablesthrough pipe including back filling and ramming aftercablelaying as specified in Technical Circular No.2 of1988issued by CSTE/S.E.Rly. This includes repairingandplastering of platform/pucca road after cable laying.RCCpipe shall be inspected by the Rep.of Sr. DSTE /Rbeforelaying. NOTE:- Power cable,signalling cable, Quadcable asmentioned above,where required shall be laid in thesame trench as signalling cable but in a separate pipe. | Metre 450.00 | — | 1,008.8 | 4,53,960 |
| 3 | Laying and Fixing of galvanised iron pipe (GI Pipe) withthreadedcollars (for jointing pipe) of 80 mm nominal diaSpec.No.IS-1239medium grade, on bridges, culverts, drainsincluding supply andtransportation of GI pipes and all othermaterials required forfixing the pipe to Drg.No.Con/SK/T/2and drawing ofSignal/Power/Quad cables inside the pipewith masonary worksover the entire length of the bridge andat entry and exit of theculvert and curing for 72 hrs, drillingof holes on the pipe at 10 cmapart to be clamped 2 Mtrsapart on culvert, for the Signalling,quad, power cable. | Metre 350.00 | — | 761 | 2,66,350 |
| 4 | Excavation of trench and clearing of roots of trees, bushes,ballastand reconditioning etc., including bailing out waterand disposal ofextra soil in Hard rocky area includingconcreting. Chase cuttingand smoothening of inside surfaceof sizes 0.08 m deep and 0.17m width at platform andcemented floor area. | Metre 180.00 | — | 115 | 20,700 |
| 5 | Excavation of trenches including clearing of roots oftreesetc. in hard rocky soil by chiseling up to a depth of0.5m to0.8 Mtr. At the bottom, supply and placing half roundRCCpipe on sieved soil of 30 mm over cable andconcretingthroughout the lenght upto a layerof 75 mmapproximately(1:2:4) , as advised by the site engineer &Guide lines onSignalling cable Laying issued by SignalDirectorateResearch,Design & Standards organisationMinistry ofRailways Manak Nagar Lucknow- 226011,Version-1.0,Effective from dt 31.10.2011 . Thendigging and backfillingthe trench by digging and carryingearth from a lead ofmaximum 30Mtrs and then ramming thesoil after cablelaying. This includes supply of half round RCCpipe. | Metre 1700.00 | — | 372 | 6,32,400 |
| 6 | Excavation of trench and clearing of roots of trees, bushes,ballastand reconditioning etc., including bailing out waterand disposal ofextra soil. Track crossing, Road Crossing bypushing method(HDD method) at culverts/ track / puccaroad crossing at a depthnot less than 1 meter with referenceto bottom of rail/road surfaceincluding supply of GI pipe with76 mm dia, Spec. No. - 1239medium grade (for the length ofpushing more than 05 meters). | Metre 1270.00 | — | 2,246 | 28,52,420 |
| 7 | Fixing of concrete cable route marker at 30-40 meter andatdiversion point including supply & transportation ofcableroute marker at site. Detail size & fixing of cableroute marker should be followed as per drawing no.SDO/Cablelaying/020. | Numbers 50.00 | — | 415 | 20,750 |
| 8 | Laying of Signalling Cable/Power/Quad cable / PIJF cableinthe excavated trench toDrg.No:CON/SK/T/5.Transportation,supply of 'U' clampsand anchoring of cable at every 10 Mtrswith 'U' clamp toDrg.No:CSTE/C/Cable/81 including backfilling withexcavated earth and ramming of trenches aftercablelaying. Note: The contractor has to conduct detailedsitesurvey of the cable route, prepare a plan to get approvalofthe Railway, putting white lime powder markingbeforeexcavation of earth under supervision ofrailways authorised representative. | Kilometre 77.00 | — | 16,740 | 12,88,980 |
| 9 | The excavation of pit, casting of concrete foundationincludingsurrounding earthwork along the foundation,erection, installationand wiring of steel appartus case, fixingof terninals, fuse blocks,signal transformer, currenttransformer, filament switching unit,track battery chargers,adjustable/fixed resistances, choke coils,Fuses, Relays, Etype locks , termination of cables, cableinsertion, wiring todraw 110V AC therefore in the new apparatuscase asrequired, testing, commissioning includingsubsequentalterations (if required), bunching of cables,earthing of cable,armours etc. Painting of the apparatuscase inside and outsideafter clearing the surface thoroughlyand first coating of anti - corrosive paint and subsequent twocoatings of Alluminium paintoutside and Red Oxide insideand lettering. 18 mm Hylum sheetfor location box shelf and12 mm for cable termination in locationbox.Steel appartus case (Large) to Drg.No. CON/SK/T/8 with 4Nos. of foundation bolts 20mm x 460mm to Drg.No. SA- 112 A/M or latest. | Numbers 45.00 | — | 17,067 | 7,68,015 |
| 10 | Alteration/ Modifications in the existing location boxes, fixingofequipments, cable insertion, termination, wiring, testing&commissioning, two coat painting, lettering to suit thecircuits asper approved wiring diagrams. This includes fillingwith sand and plastering the same. | Numbers 34.00 | — | 2,548 | 86,632 |
| 11 | Transportation & Execution of following kinds of joints on Quad Cable using thermoshrink jointing kit. This also includes excavation of cable joint pit of size 1.2m x 1.2m x 1.0m in all types of soil for jointing of copper cables, back filling and ramming after jointing. (b) straight through joint on Quad cable/10-20-50 pairs PIJF Cable. | Numbers 115.00 | — | 1,385 | 1,59,275 |
| 12 | Installation, testing and commissioning of Permanent andMaintenance Free Earth pits.Installation charges : Earthpit(1 Set) It includes: (1) Civil works related to earth pitdigging, PMF earth pit installation,,backfilling and chamber making, (2) Materials for chamber including Chamber Cover. | Numbers 18.00 | — | 5,882 | 1,05,876 |
| 13 | Excavation of earth pit, transportation, placing and fixing ofearth electrode with construction of cement encloser toDrg.No.CON/SK/T/9 and CON/SK/T/9A and drawal of GIwire wrapped on MS strip (35 x 6 mm) from earth electrodeto all signalling equipments, including fixing and soldering oflugs at both end of the wire. | Each 50.00 | — | 1,941 | 97,050 |
| 14 | Installation, cable termination, testing and commissioning of 10/20/50 Pair CT Boxes. | Numbers 2.00 | — | 786 | 1,572 |
| 15 | Alteration of existing Q-series/Composite Relay Racks and cable termination racks. | Numbers 33.00 | — | 19,785 | 6,52,905 |
| 16 | Execution to be made by the contractor in Autocad as perfollowing :-1. SECRailwayPractice in conformity with GR,SR& SEM. 2 . As per latest typicalcircuit diagram andguidelinesof SEC railway. Design &Preparation ofCircuits and drawingsDesign,Preparation & checking of documents and Circuit diagram and drawings(a) Design and development of Circuit Diagram in size B(A3) as per SEM sheet including contact analysis. | Sheet 240.00 | — | 1,004 | 2,40,960 |
| 17 | Design & Preparation of SWR & GWR in English & Hindi for execution to be made by the contractor as per SECRly practice in conformity with GR, SR & SEM provisions and in accordance with CSTE/OL/GRC's circular No.3 of 1984 with the latest alterations & amendments based on IP (tentative/approved) (to be supplied by the Rlys). | Numbers 6.00 | — | 8,197.6 | 49,185.6 |
| 18 | Cement Concrete of proportion 1:3:6 with graded aggregate of size 25mm. and below. | cum 21.00 | — | 2,943 | 61,803 |
| 19 | Deployment of Prokline/ Hydra operation at site forexposingthe burried cables or relocation the Location Box/SignalPost with foundation or shifting of heavy materials as per the advice of Railway site engineer. | Hour 10.00 | — | 603 | 6,030 |
| 20 | Physical tracing and opening/locating of existing workingcables by precession digging for diversion of cables inconnection with cable clearance for engineering earth workwithout interfering the circuits as per the advice of Railwaysite engineer. | Metre 150.00 | — | 241 | 36,150 |
| 21 | Design, Preparation & checking of documents and Circuit diagram and drawings - Design & development of cable corage plan in size U(A3) as per SEM. | Station 1.00 | — | 2,511 | 2,511 |
| 22 | Design, Preparation & checking of documents and Circuit diagram and drawings - Design & development of cable route plan in size U(A3) as per SEM. | Station 1.00 | — | 1,256 | 1,256 |
| 23 | Splicing/Dropping/Termination of each fiber/pigtail in LIU/IO BOX/TERMINAL JOINTS through fusion splicing for termination of OFC cables. The Fibers terminated shall be tested and test report (Hard copy and Soft copy ) shall be submitted to the Railways site Incharge for records. Each fiber shall be properly marked with necessary ferrules/tags. | Numbers 48.00 | — | 193 | 9,264 |
| 24 | Transportation, installation of optical fibre joint closure and splicing of Optical fibre cable (2 x 24 fibres) and testing, Optical fibre cable splicing shall be done in the presence of Railway's representative. Only joint closure shall issued by the Railway. All other tools/test equipments required shall be arranged by the Contractor. This also includes excavation of earth for construction of masonary pit of bricks (inside complete plastered), the inner size of pit 1.2m x 1.2m (depth 0.75m) in all types of soils for keeping cable coils at the location of OFC joints, filling the pit with sand after jointing of cables, ramming and covering with RCC slab as per Drg. and instructions of site incharge of Railway. | Numbers 2.00 | — | 19,019 | 38,038 |
| 25 | Transportation including loading/unloading of HDPE pipe from the stores of railway to the work site, laying of the same in excavated trench/already laid GI/RCC pipes/tubes, jointing, levelling and end sealing the pipes. | Kilometre 1.00 | — | 7,762 | 7,762 |
| 26 | Transportation, loading/unloading of OFC from the stores of railway to the work site with care, pushing/pulling OFC through the HDPE pipes, sealing of the duct by sealling /caps plugs. The cable is to be laid by mechanised means. At inaccessible places where mechanised laying is not possible, the cable is to be laid manually. This also includes testing of cable drums in the store premises before transportation and submissions of results thereof. Empty cable drums to be returned by the contractor. The cable drums with unused cable at site to be returned by the contractor to the stores depot of Consignee. | Kilometre 1.00 | — | 18,672 | 18,672 |
| 27 | Dismantling of Steel apparatus case with fittings and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers 6.00 | — | 232 | 1,392 |
| 28 | Transportation, installation, fixing &commissioning of MS Flat on existing conventional earth. This includes cutting, making holes, welding etc. of MS flat as per site requirement. This also includes supply of SS nut& bolt as per requirement. Note: Unit Numbers stands for per earth. | Numbers 15.00 | — | 1,217.7 | 18,265.5 |
| 29 | Dismantling of Location Foundation(By hydraulic breaker). | Numbers 6.00 | — | 1,087 | 6,522 |
| 30 | Shifting of existing location boxes to facilitate earthwork of Engg./Con. This includes filling with sand and plastering inside location boxes. | Numbers 5.00 | — | 3,580 | 17,900 |
| 31 | Transportation, installation of Optical Fibre termination box and splicing of Optic Fibre Cable (24 fibre) inside the termination box with provision of taking out fibre of OFC as required. This includes supply of installation accesories (as required) as detailed in technical specification and advised by Railway's Engineer-at-site.This also includes End to End testing of all fibres of the optical fibre cable terminated between cable hut to cable hut of each station. | Numbers 6.00 | — | 21,705 | 1,30,230 |
| 32 | Fixing of PVC pipes on wall, FOB, platforms etc complete with U clamps & other necessary fixture, screw etc. This includes supply & fixing of t and other bends flexible PVC pipes -25mm etc as required. | Metre 1500.00 | — | 3.79 | 5,685 |
| 33 | Laying/Drawl of data cable/communication cable/power cable/OFC /other cable through PVC pipe /casing &capping asper site requirement and instructions of site incharge. | Metre 1000.00 | — | 6.48 | 6,480 |
| 34 | Installation, Testing &Commissioning of 19" 6U Rack .All the accessories and fixing materials required for this installation are to be supplied by contractor within the same cost. | Numbers 2.00 | — | 71.9 | 143.8 |
| 35 | Supply and fixing of PVC casing caping25mm x 25mm size for indoor wiring.This includes drawal of wires in the casing caping and termination of wire at end point. The work should be carried out as per the instruction of Railway site Engineer. | Metre 200.00 | — | 43 | 8,600 |
| 36 | Concealed wiring of cat-6cable/telephone cable/ OFC cable in thePVC pipe/PVC channel by making groove in the wall,fixing the PVC pipe with clamps, nails and plastering and distempering to make it as it was earlier as per instructions of engineer-in-charge. This includes laying and fixing of all the PVC pipes as per colour in systematic way as per instruction of Rly.Engg. at site. required for laying of all types of cables for railnet, telephone connection etc., All the sundry items for the work has to be supplied by the contractor. Railways will supply telephone cables/Cat- 6cables and PVCpipe/channels. All the telecom cables willbedrawn from the specified location ,approved drawing. The payment would be made as per layout of grove made in the wall, irrespective of how many pipe(maximum three pipes)are laid and how many cables drawn through these pipes. | Metre 100.00 | — | 63.72 | 6,372 |
| 37 | Q-series/Composite Relay Racks and cabletermination racks (New).NOTE: Payment can bereleased in a part for the above said work aftercompletion of- (i) Erection- 15%,(ii) Wiring,testing, painting, earthing & writings etc - 75% ,(iii)Commissioning of Relay rack/Compositerack/CTR- 10% of Schedule rate. | Numbers 7.00 | — | 48,363 | 3,38,541 |
| Schedule total | ₹90,31,367.9 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .