| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAdmitted-Finance | ₹19.4 L | L1 | Admitted-Finance |
| 2 | L2₹20.0 LAdmitted-Finance | ₹20.0 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical not ok |
| Sl No | Description | Qty | Unit | M/S SURYA ELECTRICALS L2 | M S Enterprises L1 |
|---|---|---|---|---|---|
| 1.00Carriage of fallowings from ESC. Modinagar/Ghaziabad to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60Kms. | |||||
| 1.01 | S.T Pole 13 Mtr long. | 10 | Nos | 1,400 ₹14,000 | 1,500 ₹15,000 |
| 1.02 | P.C.C Pole 11 Mtr long. | 80 | Nos | 1,500 ₹1.2 L | 2,000 ₹1.6 L |
| 1.03 | S.T Pole 11 Mtr long. | 10 | Nos | 1,400 ₹14,000 | 1,500 ₹15,000 |
| 1.04 | P.C.C POLE 8.5 Mtr long. | 100 | Nos | 1,000 ₹1 L | 1,200 ₹1.2 L |
| 2.00 | Carriage of All Centerlized/De-Centralized Material from store Center Gzb to Pit site as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator XLPE Cable etc. | 40 | Qtl. | 900 ₹36,000 | 700 ₹28,000 |
| 3.00Erection of Single Pole support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | |||||
| 3.01 | S.T Pole 13 Mtr long. | 6 | Nos | 2,500 ₹15,000 | 2,000 ₹12,000 |
| 3.02 | P.C.C Pole 11 Mtr long. | 6 | Nos | 2,500 ₹15,000 | 3,500 ₹21,000 |
| 3.03 | S.T Pole 11 Mtr long. | 52 | Nos | 2,500 ₹1.3 L | 2,000 ₹1.0 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
25 Mar 2026, 12:00 pmClosed
Superintending Engineer
A 37 hydel colony Kavinagar Ghaziabad
Work related to maintenance of smooth power supply system and restoration of electrical system/material by attending to the break down in minimum period due to storm/storm (natural disaster) in the area of work of various 33/11 KV sub-stations under
2026_PVVNL_1125068_2
T-32/2025-26/EDC/GZB
Open Tender
Electrical Works
365 days
Superintending Engineer EDC GZB
Please refer tender document
2 documents required · 2 mandatory
₹3,540
Superintending Engineer
₹20,000
30 May 2026
16 Mar 2026
25 Mar 2026
16 Mar 2026
25 Mar 2026
16 Mar 2026
Carriage of fallowings from ESC. Modinagar/Ghaziabad to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60Kms.
S.T Pole 13 Mtr long.
P.C.C Pole 11 Mtr long.
S.T Pole 11 Mtr long.
P.C.C POLE 8.5 Mtr long.
Carriage of All Centerlized/De-Centralized Material from store Center Gzb to Pit site as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator XLPE Cable etc.
Erection of Single Pole support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
S.T Pole 13 Mtr long.
P.C.C Pole 11 Mtr long.
S.T Pole 11 Mtr long.
P.C.C POLE 8.5 Mtr long.
Erection of duble pole/Saction Pole support including complete Lt fittings as per RESPO mannual and as per direction in charge including the cost of Labour, T&P and carrier etc. required for proper completion of work.
S.T Pole 13 Mtr long.
P.C.C Pole 11 Mtr long.
S.T Pole 11 Mtr long.
P.C.C POLE 8.5 Mtr long.
Grouting of Single Pole shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
S.T Pole 13 Mtr long.
P.C.C Pole 11 Mtr long.
S.T Pole 11 Mtr long.
P.C.C POLE 8.5 Mtr long.
Grouting of Double Pole shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
S.T Pole 13 Mtr long.
P.C.C Pole 11 Mtr long.
S.T Pole 11 Mtr long.
P.C.C POLE 8.5 Mtr long.
Re-Installution of distribution Transformer with carriage kachha pacaa road including loding and unloading charges of both ends, required for proper completion of work distance about to 60 Kms.
25/63 KVA T.F
100/160 KVA T.F
250 KVA T.F
400/630 KVA T.F
750/1000 KVA T.F
Laying, sagging. Stringing and binding and jumpering of ACSR 11 K.V XLPE cable, LT ABC Cable etc.newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
ACSR Weasal Conductor
ACSR Rabbit / Dog Conductor
11 K.V XLPE Cable of various Size
LT ABC Cable of Various Size
Resagging of loose and bad sag of L.T./H.T. line/ACSR Weasel/Rabbit/Dog Conductor
Resagging of loose and bad sag of XLPE Cable Various size
Resagging of loose and bad sag of ABC Cable Various size
Fixing of 11 K.V Stay rod with Stay wire in proper way with Nozelling.
Grouting of Stay rods .
Chopping of Tree branches..
Tightening of Stay
Grouting of PCC/STP Pole Old
Change of broken/Damaged/Missing following Items :-
Pin Insulator
Disc Insulator
Bended X-Arm/Angle/Channel
T-off Channel
LT Clamp with insulator, nut and bolt.
Site Bracket with fabrication and supply of MS angle and Channel as per site requirement.
Ailment of PCC/STP Pole
F Clamps
Stay Clamps
Stay Insulator
Re-Installution of guarding of GI Wire.
Welding of the Damaged/Broken ST Pole welded Angle Oron piece with Pole
Dismantling of ST/PCc Poles.
Removal of ST/PCc Poles.
Dismantling of 25/63/100KVA Insulator from damaged double pole.
Removal of accessories on double pole PCC/ST Pole.
Fixing of all old/new accessories on new Double pole PCC/STP.
Mounting of 25/63/100 KVA Transfoner or double pole.
Filling/Making of 11 K.V Cable J/Kit of various Size.
The following material is required to be supplied by the contractor.
Providing & Fixing Stay clamp.
Providing & Fixing Stay insulator.
Providing & Fixing of barbe Wire
Providing 11 K.V Cable jointing Kit of various size.
PRC/Dead End/Suspension Clamp/J-Hook
Providing & fizing of F Bracket
LT Clamp with Insulator, Nut & Bolt
Providing & Fizing of X Arm Holding Clamp
Bolt & nut off size.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
32TenderDocument.pdf
Tender Documents • 0.40 MB
BOQ_2099234.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid