Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹40.0 LAccepted-AOC | L-1 | Accepted-AOC ok | |
| 2 | L-2₹41.1 L+₹1.1 L (2.63%)Rejected-AOC | L-2 | Rejected-AOC ok | |
| 3 | L-3₹42.1 L+₹2.1 L (5.13%)Rejected-AOC | L-3 | Rejected-AOC ok | |
| 4 | L-4₹41.1 L+₹1.1 L (2.65%)Rejected-AOC | L-4 | Rejected-AOC ok | |
| 5 | Rejected-Technical A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | - | Rejected-Technical As per technical Evaluation |
Tender Value
₹43.1 L
EMD Value
₹72,200
Closing Date
1 Oct 2020, 9:00 amClosed
Executive Engineer, Una Division, HPPWD, Una
Executive Engineer, Una Division, HPPWD, Una
Job 1 Construction of link road from Una Basoli road to PGI Satellite Center km.0-0 to 0-250 Sub Head P.L Granular Sub base, WMM and bituminous concrete RD.0-0 to 0-250)
2020_PWD_41094_1
Job 1 Construction of link road from Una Basoli ro
Open Tender
Civil Works - Roads
Item Rate
90 days
Una
Please refer to Bidding Documents
13 documents required · 13 mandatory
₹2,000
Executive Engineer, Una Division, HPPWD, Una
₹72,200
23 Nov 2020
25 Sept 2020
1 Oct 2020
25 Sept 2020
1 Oct 2020
25 Sept 2020
Amount
Earth work in excavation for all type of road structure and all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks ( Where blasting is prohibited) such as retaining walls, breast walls, culverts, drains and parapets etcetera as per drawings and technical specification clause 305.1 and as per direction of the Engineer- In – Charge including setting out construction of shoring and bracing , removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty millimetres) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water ) upto any depth and any quantium of water including cleaning of slush which may arrise out during dewatering as per direction of Engineer-in-Charge. including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Construction of embankment with approved materials obtained from borrow pits deposited at site from road way, excavation of other road structures or other sources laid in layers of suitable thickness not exceeding 200mm( two hundred millimeter) and compacted with 80-100 (eighty-hundred)KN.static/ vibratory road roller to meet the requirements of table 300.1 and 300.2 as per technical specifications clause 301.5 to lines,grades,level and cross sections as per drawings or directions of the Engineer-in-charge including preparation of foundation for embankment in all kinds and classification of soils including saturated soil and dewatering/ bailing out of water wherever required including handling of materials for construction of embankment within all leads and lifts.The rate shall include carriage of machineries, equipment, tools and materials and safety measures, as per direction of the Engineer-in-charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Construction of gravel/soil aggregate sub base/base by providing well graded material of nominal maximum size grading 80mm as per table 2.3 of IRC SP 77-2008 spreading in uniform layers of IRC SP 77-2008, spreading in uniform layers with tractor mount appropriate grading arrangements on prepared surface mixing by mix in place method at OMC wth tractor mount approptiate rotavator attachment and compaction with three wheel 80-100(Eight -hundred) KN static roller capacity to achieve the desired density complete as per specifications contained in para 2.2, 3.6 and 3.7 of IRC SP 77-2008 complete as per technical specification caluse 401 for grading -I material including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing , laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (pug mill) carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN (Eighty to hundred kilo newton) capacity to achieve the desired density including lighting barricading and maintenance of diversion etc. as per tables 400.11 & 400.12 and technical specification clause 406.including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and applying evenly a primer coat with bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg (zero point seventy kilogram to one point zero kilogram) per square metre using mechanical means as per technical specification clause 502 and as per direction of Engineer-in-charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying 50mm(fifty millimetre) thick bituminous macadam with(VG-30) and with 40-60 TPH ( forty dash sixty ) batch type HMP producing an average output of 40(forty ) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 3.3%(three point three percent) by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 504 complete in all respects. including carriage of material within all leads and lifts and other incidentials.The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government .
Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.25 to 0.30 kg.per sqm(Zero point twenty five to zero point thirty kilogramme)per square metre.on the prepared granular surfaces treated with primer and cleaned with Hydraulic broom as per technical specification .clause 503 including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying 25 mm (Twenty five millimetre) thick bituminous concrete with (VG-30) 100-120 ( one hundred dash one hundred twenty ) TPH batch type hot mix plant producing an average output of 75(seventy five ) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 to 5.6 (at the rate of five point four to five point six ) of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects including carriage of material within all leads and lifts.The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundation/ for all type structure complete of plain cement concrete grade M-10 (M-Ten) in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803.1202 and 1203 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundations upto all heights for all type structure complete of plain with cement concrete standard concrete design mix of grade M-20 (M-twenty) cement contents not less than 330kg.(three hundred thirty Kilogramme) per cubic metre in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803,1202 and 1203 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Supplying fitting and placing TMT bar reinforcement in foundation complete as per drawing and technical specification clauses—1001 including cutting, bending binding and placing in position complete in all respect including cost of binding wire in all heights including carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.
Construction of sub grade and earthen shoulder with approved materials obtained from borrow pits, with in all lifts and leads ,transporting to site, spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 metre (one thousand metre) as per technical specification clause 303.1 including carriage of materials within all leads and lifts and other incidential . The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.
Lalit Joshi
ganesh
Shivalik Construction Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .