Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical As per TCR | |
| 3 | Rejected-Technical | - | Rejected-Technical As per TCR |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
23 Feb 2023, 5:00 pmClosed
Area Egnineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Routine cleaning, dry inspection and repair, hydraulic test and fitting of Vertical Boiler No. WBL/10149 and WBL/9658 of South Samla Unit.
2023_ECL_270909_1
GM-PND/EandM/22-23/68/2387 dated 09/02/2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
South Samla Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,400
18 Mar 2023
13 Feb 2023
24 Feb 2023
13 Feb 2023
23 Feb 2023
13 Feb 2023
13 Feb 2023 - 20 Feb 2023
Amount
Routine cleaning, dry inspection and repair, hydraulic test and fitting of Vertical Boiler No. WBL/10149 and WBL/9658 of South Samla Unit. (Inclusive of CMPF/EPF)
Cleaning of ash from the bottom of the boiler
Cleaning of all the scale & rust from the boiler shell plate at fire side & washing of the same
Cleaning of scale from the boiler shell plate, scrapping, removing of all the foreign materials, washing of the same at water side
Dismantling of all the valves, fire bar & all the inspection door, cleaning & deposit the same at colliery work hop
Conducting the dry inspection of the boiler by the Dy Director of Boiler's Durgapur
To build up the pited portion of boiler shell crown by arc welding & grind smooth as mark out during inspection.
To build up the uptake tube of the boiler by electric arc welding & dressing to be done by grinding to regine its original contour
Changing the defective burn out fuse plug thread making of bore hole of shell crown plate etc.
Overhauling lapping & necessary repair of all the valves with supply & fitting of 2 set bush for gauge column cock
a) To build up the mudhole cross tube door & grind smooth to make spie got clearance b) Changing of all the stud of mudhole door by gas cutting & fitting new H.T. stud by arc welding c) Cost of new H.T. stud (3/4" x 6") long with washer
Supply & Fitting of 3/4" gauge glass tube 18" long
Hydraulic test of V/boiler with blanking & water filling & conducting the inspection.
Complete fitting of V/boiler with all fittings.
Fabrication of fire bar with DA/Oxygen & Electrode 30lb Tall five bar
Supply of Nut bolts Tap joint steam joint etc
Commissioning of boiler with all preparation for firing of the boiler & 48 hrs. observation
Total impact of GST for the purpose of CTC
GT ENTERPRISE
GHOSH ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .