| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹43,704.76 (0.39%)Admitted-Finance | ₹1.1 Cr+₹43,704.76 (0.39%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | AWAJ INFRA ENGINEERING SOLUTIONS L1 | M/S ALJAN ENGINEERS AND CO L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work excavation of foundation pits including all Labour, T&P, leads & lifts, stockpiling, making of working space, carriage, disposal of excaveted soil, backfilling including cost of borrowed good earth & dressing of surplus excavated earth and dewatering during excavation | 1,115.09 | Cum | 180 ₹2,00,716.2 | 65 ₹72,480.85 Lowest |
| 2.00Close timbering in trenches including strutting and shoring complete. Only forPartially Submerged and Fully Submerged Foundations | |||||
| 3.00 | Depth exceeding 1.5m but not exceeding 3m | 398.88 | Sq.M | 5 ₹1,994.4 Lowest | 65 ₹25,927.2 |
| 4.00Reinforcement for R.C.C. work including straightning, cutting,bending, placing in position and binding all complete bars (TMT) including all carriages(manual and mechanical) | |||||
| 5.00 | Thermo-MechanicallyT reated bars of grade Fe-500D or more. | 6,328 | Kg | 85 ₹5,37,880 | 70 ₹4,42,960 Lowest |
| 6.00 | Supply Of Stubs and cleats(as per drawing) | 2,174.62 | Kg | 140 ₹3,04,446.8 Lowest | 163 ₹3,54,463.06 |
| 7.00 | Stub setting including transportation, carriage of Stubs & Templates. | 3 | Set | 11,000 ₹33,000 Lowest | 15,000 ₹45,000 |
| 8.00Providing and laying in position cement concrete of specified grade including curing ,Carriage of materials Mechanical & Mannual but excluding th cost of centring and shuttering.All workupto plinth level with: | |||||
| 9.00 | 1:3:6 (1cement:3coarse sand:6 graded stone aggregate 40mm nominal size) | 19.22 | Cum | 4,500 ₹86,490 | 4,300 ₹82,646 Lowest |
| 10.00 | Providing and laying in position specified grade of reinforced cement concrete includingcuring Carriage of materials Mechanical & Mannual but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks uptoplinthlevel (M25) including all carriages and dewatering | 128.75 | Cum | 9,700 ₹12,48,875 | 5,500 ₹7,08,125 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
30 Aug 2024, 4:00 pmClosed
Executive Engineer TLMD-IIPampore
Office of the Ex. Engineer TLMD-II Pampore
Increasing the ground clearance of 132kV (D/C) Bemina-Rawalpora transmission line between Tower Location No. 24 to 26 necessitated due to construction of flyover at Sanathnagar Chowk Srinagar
2024_PDD_252860_1
TLMD-II/02 of 2024-25
Open Tender
Electrical Works
Turn-key
120 days
Sanatnagar Srinagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,600
Executive Engineer TLMD-II Pampore
₹2.5 L
Yes
18 Oct 2024
12 Jul 2024
31 Aug 2024
12 Jul 2024
30 Aug 2024
12 Jul 2024
12 Jul 2024 - 16 Jul 2024
Amount
Earth Work excavation of foundation pits including all Labour, T&P, leads & lifts, stockpiling, making of working space, carriage, disposal of excaveted soil, backfilling including cost of borrowed good earth & dressing of surplus excavated earth and dewatering during excavation
Close timbering in trenches including strutting and shoring complete. Only forPartially Submerged and Fully Submerged Foundations
Depth exceeding 1.5m but not exceeding 3m
Reinforcement for R.C.C. work including straightning, cutting,bending, placing in position and binding all complete bars (TMT) including all carriages(manual and mechanical)
Thermo-MechanicallyT reated bars of grade Fe-500D or more.
Supply Of Stubs and cleats(as per drawing)
Stub setting including transportation, carriage of Stubs & Templates.
Providing and laying in position cement concrete of specified grade including curing ,Carriage of materials Mechanical & Mannual but excluding th cost of centring and shuttering.All workupto plinth level with:
1:3:6 (1cement:3coarse sand:6 graded stone aggregate 40mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete includingcuring Carriage of materials Mechanical & Mannual but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks uptoplinthlevel (M25) including all carriages and dewatering
Centering and shuttering including strutting, propping etc.and removal of form work for:
Foundations,footings,bases for columns
Providing and fixing of earthing including earth resistivity including counterpoise whereever required.
MATERIAL PART
Fabrication, Galvanisation and Supply of Lattice Type Steel Tower Structures
Galvanised Nuts & Bolts with Washers
Tower Accessories
Danger Plates
Number Plates
Circuit Plates
Phase Plate (06 No. per tower)
Anti Climbing Devices
Bird Guard
Supply Of Line Material & Accessories
ACSR Panther
Conductor Accosseries For PANTHER
Mid Span Compression Joint
Vibration Dampers
Repair Sleeves
Aluminium Tap
Earthwire Accessories
Mid Span Compression Joint
Vibration Dampers
Hardware Fittings Suitable For 0.2 ASCR ( PANTHER)
Single Suspension Fittings
Single Tension Fittings
Double Tension Fittings
Clamps for OPGW
Insulators
90KN EM Strength Porcelain Disc Insulators
ERECTION PART
Erection of 02 No. D+9, 220KV towers complete with Nuts & Bolts including, transportation to site, tag welding and application of Zinc Rich Paint including Pipe earthing complete
Erection of 01 No. C+3, 132 KV tower complete with Nuts & Bolts including, transportation to site, tag welding and application of Zinc Rich Paint including pipe earthing complete (Available at site after dismantling)
Erection of Tower Accessories
Danger Plates
Number Plates
Circuit Plates
Phase Plate
Anti Climbing Devices
Bird Guards
Laying & Stringing of ACSR PANTHER conductor /Earth wire including installation of insulator strings, hardware fittings, arching horns, vibration dampers, jumpring, compression joints (if required) and other accessories including transportation to site and temporary anchoring of towers.(Including 1.5% sag) 4.06 Kms to be reused after dissmantling at site
Laying & Stringing of Earth Wire including installation of hardware clamps, vibration dampers, jumpring, compression joints (if required) and other accessories including transportation to site and temporary anchoring of towers..(Including 1.5% sag)
Dismentalling og A.C.S.R 0.2
Dismentalling of 02 No.Tower Super structure (01 No.C+3 to be re-erected at site & 01 No.AN to be returned to Divisional Stores Awantipora
Testing & Commissioning of Transmission Line
Dismantling of existing store shed
Dismantelling of CGI roofing and partition walls of shed including stacking of material upto 50 mtr
Dismantelling of steel truss work in builtup sections in angles,tees,flat channel etc including stacking within 50 mtr
Dismantelling of concrete block in floor & plinth
Shifting of store items from existing shed to new shed including stacking properly viz steel junk ,conductor ,post insulators etc including mechanical carriage of old dismantelled material of shed to Divisional stores Pampore
Dismantling of washroom
Dismantelling of RCC Slab
Dismantelling of brick walls in cement mortar
Dismantelling of wooden frames ,chowkhats including stacking upto 50 mtrs
Dismantling of existing staff room
Dismantelling of RCC Slab
Dismantelling of brick walls including disposal upto 50 mtrs
Dismantelling of wooden frames ,chowkhats including stacking upto 50 mtrs
Re-erection of store shed
Earth work excavation in trenches foundations
Providing and laying of cement concrete lean pad (1:3:6) mix
Providing and laying of cement concrete block (1:2:4) mix excluding shuttering
Providing and laying of shuttering including removal after work
Providing and fixing of steel work welded in built up sections in truss partitions including door shutter with locking fecility
Providing and fixing of G S Sheets roofing including vertical partitions fixed with J or L hooks 0.63 mm thich with zinc coating
Providing and laying of stone soling along floor of shed
Cement concrete flooring in 1:2:4 mix finished with a floating coat of neat cement 50 mm thick
Re-construction of staff room with washroom facility
Earthwork excavation in trenches & foundation ( All kind of soil)
Providing and laying of mud mat concrete 1:3:6 mix under walls
Providing and laying of cement concrete block in M20 1:1.5:3 excluding shuttering
Brick work with common burnt clay bricks in foundation & plith in 1:6 mix
Extra on brickwork Above plinth level
Providing and fixing of steel structural work in frames nof door and windows weilded in built up section (tubular, hollow sections)
12mm plastering of walls and ceiling in 1:4 mix (inner faces only)
6mm plaster on ceiling in 1:3 mix
Providing and applying of POP 2mm thick over plastered surfaces
Providing and Fixing first quality ceramic glazed tiles on walls
Providing and fixing of ceramic glazed floor tiles in shade except white to pantry and washroom
Distempering of interior walls of specified shade
Providing and fixing of panelled and glazed shutters to doors and windows 35mm thick first class kail wood
Painting of wood work with delux paint (inner and outer)
Providing and fixing of indian type white vitreous china squating pan (Orissa Pattern) with cistern etc
Providing and fixing of white vitreous China Wash basin with 15mm dia single hole basin mixer
Providing and fixing of steel kitchen sink with CI Bracket
Providing and fixing of sanitary items viz PVC 15mm water pipes, 100mm PVC water pipes, floor traps, CP Sink Mixer,wall mixer etc
Providing and fixing of accessories to doors and window shutters
Providing and fixing of electric wiring on minimum requirement including 16A receptor Fan Regulator, switches and sockets, complete job.
Providing and fixing of water heater 35litres of reputed make
Providing and fixing of Cement Concrete Floring 1:2:4 mix 50mm thick.
Providing and Fixing of mud mat under concrete floring (1:3:6 mix) 3 inch thickness
Providing and fixing of 3.5mm plain glass to windows including beading
Providing and fixing of wire gauge shutters first class kailwood
Construction of deep drain
Earth work in excavation by mechanical means for foundation of drain etc
Providing and laying of cement concrete of specified grade (1:3:6) including curing etc
Providing and laying of stone soling
Providing and laying of cement concrete in walls upto plinth level excluding shuttering (1:2:4)
Providing and laying of shuttering including its removal after work
Providing of steel work welded in builtup section /framed in gratings, ladders,, stair case etc ( As covering to drain)
M/S ALJAN ENGINEERS AND CO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 0.42 MB
BOQ_734927.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .