Loading…
Loading…
Tender Value
₹2.4 Cr
EMD Value
₹2.7 L
Closing Date
18 Feb 2026, 11:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
LKO, BSB
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-I, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar Nature of work for this tender: Any Civil Engineering work.
37 conditions · 5 needing a document upload
Tenderers are compulsorily required to upload Certificate as per Annexure M as stipulated in Clause 2.2.6 of Special Tender Conditions and instruction to tenderers without which the offer will be considered incomplete and will be summarily rejected.
The tenderers must necessarily upload/submit the legal documents, pertaining to the constitution of their Concern as applicable, along with the tender, as enumerate in clause 2.4 of special tender condition and instruction to tenderers of tender document.
Tender must compulsorily upload ANNEXURE-Q regarding Employment/Partnership etc. of Retired Railway Employees without which tender will be summarily rejected.
Submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code as per Annexure-J (Real Time Gross Saving (RTGS)/National Electronic Fund Transfer (NEFT) (Model Mandate Form)) of tender document.
The tenders confirms the option of taking payment through LC arrangement. The tenderer affirms having read over and agreed to the terms and conditions of the LC option
Tenderer shall certify that they are not black listed or debarred by Railways or any other Ministry/ Department/PSU (Public Sector undertaking) of the Govt. of India/State Govt. from participation in tenders/contract on the date of opening of bids either in their individual capacity or as a member of the JV firm in which they were/are members
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer may please note that offers received without requisite/mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
The tenderer shall visit the site of work and acquaint himself/themselves with the conditions of work viz. approach roads and accessibility, nature of soil/rock, availability of materials, electric power, water for work and drinking purposes, site for labour camps, stores, godowns, extent of lead/lift in work, availability of skilled and unskilled labour etc. that may be encountered in the course of execution of work. In short, he/they should familiarize himself/themselves fully with the conditions obtaining at site and FURNISH A CERTIFICATE TO THIS EFFECT, in the Proforma appended as Annexure-C of Tender Document.
Tenderers are compulsorily required to fill up/submit requisite details in prescribed Performa of Annexure C to G,I,J and Annexure-L as per tender document without which the offer may be considered as incomplete and be liable to be rejected.
The tenderer's may note that the Railway reserves its right to either accept or reject any Bid/s without assigning any reasons whatsoever and tenderer s shall have no claim s on this account.
The time, date and venue of opening of Financial Bids shall be notified to the successful tenderer s after evaluation of Technical cum Commercial Bids. The same shall be opened on due date in the presence of tenderers / their representatives as may wish to attend the same.
The tenderers shall quote the rates of one single % age "Above/Below/At par" on the total amount comprising basic value of entire Schedule of Chapters of USSOR-2021 plus escalation (Schedule "C") and one single % age "Above / Below / At par" over entire schedule of Non schedule Items (Schedule "A" & "B") in the attached Schedule of Items, Rates and Quantities (Packet-II, Financial Bid). Every possible fluctuation, in the rate of labour, material and general commodities, and other possibilities of each and every kind which may affect the rates, should be considered and kept in view before quoting the rates and no claim on this account shall be entertained by the Railway under any circumstances except the price escalation payable as per price variation clause, if any, provided separately in the tender documents.
As per Income Tax Act, Tax will be deducted for sums paid for carrying out the work under this contract. In case of supply contract for ballast, deduction of 2% (Two percent) Income tax will be made for the sums paid for labour portion only (i.e., loading, unloading, stacking, measurement and laying etc.). 1% labour cess shall be deducted from each RA bill to be deposited with concerned labour Commissioner/State Govt.
TAXES: The contractor shall be governed by the Taxes applicable at the place of actual execution of work as per clause 23.0 of Special Tender Conditions and instruction to tenderers
Only Technical cum Commercial bid will be opened first. Thereafter all Technical cum Commercial offers will be evaluated for eligibility on the basis of the documents submitted by the tenderers regarding constitution of firm, technical and financial eligibility. The shortlisted firms will thereafter be informed of the date, time and venue of the opening of their Financial bids. Financial bids of these shortlisted tenderers will be opened as scheduled and evaluated accordingly.
If on verification of credentials, at the evaluation stage, it is found that the tenderer has submitted forged/fake documents in support of his offer, his Bid Security shall be forfeited besides banning of business for a period of upto five year.
IF THE TENDERER S DELIBERATELY GIVES WRONG INFORMATION/ CREDENTIALS/DOCUMENTS IN HIS/THEIR TENDERS AND THEREBY CREATE S CIRCUMSTANCES FOR ACCEPTANCE OF HIS/THEIR TENDER, RAILWAY RESERVES THE RIGHT TO TERMINATE THE CONTRACT AT ANY STAGE, BESIDES, BANNING OF BUSINESS FOR A PERIOD OF UPTO FIVE YEAR
The contractors operations and proceedings in connection with the works shall at all times be conducted during the continuance of contract in accordance with the laws, ordinance, rules and regulations for the time being in force and the contractor shall further observe and comply with t h e bye-laws and regulations of the Govt. of India, State Govt. and of Municipal other authorities having jurisdiction in connection with the works or site over operations such as these are carried out by the contractor/s and shall give all notice required by such bye-laws and regulations. The Hospital and medical regulations in force for the time being shall also be complied with by the contractor/s and his workmen.
The contractor shall be responsible for the observance of the rules and regulations under the mines act and mineral rules and Indian Metallurgical rules and regulations of State/Central Govt. concerned as amended from time to time.
The contractor shall be responsible for the observance of the rules and regulations under the mines act and mineral rules and Indian Metallurgical rules and regulations of State/Central Govt. concerned as amended from time to time.
Contractor shall at all times keep the railway administration indemnified against all penalties that may be imposed by the Govt. of India or State Govt. for infringements or any of the clauses of the mines act and rules made there under in respect of quarries from which the ballast for these works is procured
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/Integrated Goods and Services Tax Act, 2017(IGST)/Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt & as amended from time to time and applicable taxes before bidding. Tenderer's will ensure that full benefit of Input Tax Credit (ITC)likely to be availed by them is duly considered while quoting rates
The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
I/We hereby confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussion, if quoted by us anywhere else including attached document shall not be considered for deciding inter-se ranking
I/We have read the various conditions to tender attached here to and hereby agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for a period of 60/90 days from the date fixed for opening the same and in default thereof I/We will be liable for forfeiture of My/Our Bid Security. I/We offer to do the subject work (as per tender notice/ tender document) for Northern Railway at the rates quoted in the attached schedule and hereby bind myself / ourselves to complete the work in all respects within time stipulated in tender notice/ relevant clause of the tender document from the date of issue of letter of acceptance of tender
Civil work for provision of 17 nos Lifts at Jaunpur, Pratapgarh, Rae-Bareli, Sultanpur, Unnao & other stations under 'Amrit Bharat Station Scheme' in Lucknow Division of Northern Railway.
06-DyCE-GSU-NR-LKO-25-26
06-DyCE-GSU-NR-LKO-25-26
Open
Works - General
8 Months
Lucknow, Uttar Pradesh
₹0
₹2.7 L
18 Feb 2026
23 Jan 2026
4 Feb 2026
21 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,40,69,886.17 | ||
| — | Item Breakup | for details. | — | ||
| All items of Chapter-02 "Earth Work" of DSR-2021 | — | — | — | 51,083.88 | |
| — | Item Breakup | for details. | — | ||
| All items of Chapter-04 "Concrete Work" of DSR-2021 | — | — | — | 1,11,919.59 | |
| — | Item Breakup | for details. | — | ||
| All items of Chapter-05 "Reinforced Cement Concrete Work" of DSR-2021 | — | — | — | 1,11,80,166.38 | |
| — | Item Breakup | for details. | — | ||
| All items of Chapter-06 "Masonry Work" of DSR-2021 | — | — | — | 7,04,960.08 | |
| — | Item Breakup | for details. | — | ||
| All items of Chapter-08 "Cladding Work" of DSR-2021 | — | — | — | 21,84,071.21 | |
| — | Item Breakup | for details. | — | ||
| All items of Chapter-10 "Steel Work" of DSR-2021 | — | — | — | 70,94,534.02 | |
| — | Item Breakup | for details. | — | ||
| All items of Chapter-11 "Flooring Work" of DSR-2021 | — | — | — | 22,82,098.16 | |
| — | Item Breakup | for details. | — | ||
| All items of Chapter-12 "Roofing Work" of DSR-2021 | — | — | — | 2,82,170.59 | |
| — | Item Breakup | for details. | — | ||
| All items of Chapter-13 "Finishing Work" of DSR-2021 | — | — | — | 1,48,813.38 | |
| — | Item Breakup | for details. | — | ||
| All items of Chapter-15 "Dismantling & Delmolishing Work" of DSR-2021 | — | — | — | 30,068.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tendernoticeno6.pdf
ATTACHMENT
Tenderdocument06tender.pdf TENDER DOCUMENT
ATTACHMENT
Tenderdocument06tender.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .