Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹9,000
Closing Date
30 Jul 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PROJECT DIRECTOR DRDA MADURAI
DRDA MADURAI -20
RENOVATION OF CLASS ROOM BUILDINGS,TOILET, IN MELUR BLOCK IN MADURAI DISTRICT. PACKAGE NO 02
2021_RDTN_205841_1
D4/2141/2020/RCSID/MELP02
Open Tender
Civil Works
Item Rate
60 days
MELUR
REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
₹9,000
Yes
15 Jun 2022
19 Jul 2021
30 Jul 2021
20 Jul 2021
30 Jul 2021
21 Jul 2021
90 days
Amount
REPAIRS TO THE PT. UNION MIDDLE SCHOOL BUILDING (TILED ) BUILDING ATA.VALLALAPATTI VILLAGE AND PANCHAYAT
Dismantling Mangalore tiled roof with out roof timbers (Sch No.23)
Dismantling the Plastering
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Removing and Repairs Mangalore tiles Roofing with new tiles 50% tiles and 50% New tiles including all labour charges etc., complete
New Mangalore tiles Roofing with new tiles 50% tiles and 50% New tiles including all labour charges etc., complete
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Emulsion painting of of two coats including charges etc., complete
Painting old iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
Painting two coats with approved black oxide for old Black board over the cement platered surface
REPAIRS TO THE PT. UNION MIDDLE SCHOOL BUILDING (RCC SOUTH ) BUILDING AT KALLAMPATTI VILLAGE AND PANCHAYAT
Dismantling of damaged Pressed tiles etc. complete
Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete.
Dismantling of existing damaged Granaolithic floor finish
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Dismantiling of existing damaged Ceiling and wall Plastering including all labour cahrges etc.complete
Ceiling Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Emulsion painting of of two coats including charges etc., complete
Painting old iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
Painting two coats with approved black oxide for old Black board over the cement platered surface
REPAIRS TO THE PT. UNION PRIMARY SCHOOL BUILDING (TILED) BUILDING AT KEELAIYUR VILLAGE AND PANCHAYAT
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
One course of Pressed tile roof finish in cement morter (Sch No.38 C)
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Emulsion painting of of two coats including charges etc., complete
Painting old iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
Painting two coats with approved black oxide for old Black board over the cement platered surface
Provision for New Wooden Window Size 0.90x0.90m
REPAIRS TO THE PT. UNION ELE. SCHOOL BUILDING (RCC) BUILDING AT THIRUVATHAVUR VILLAGE AND PANCHAYAT
Pressed tiles & Weathering course (Sch No.38 B)
Terrace flooring with one coarse of new machine ( including cost of tiles ) pressed tiles of size 23x23x2 cm using Cm 1:3
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Emulsion painting of of two coats including charges etc., complete
Painting old iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
Painting two coats with approved black oxide for old Black board over the cement platered surface
REPAIRS TO THE PT. UNION MIDDLE KITCHEN SHED BUILDING AT KOOLIPATTI VILLAGE KURUCHIPATTI PANCHAYAT
Weathering course with Pointing with two coats including cost and conveyane etc., complete
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and including cost and conveyane etc., complet
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Emulsion painting of of two coats including charges etc., complete
Painting old wood works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
REPAIRS TO THE TOILET BUILDING (BOYS) PT. UNION PRIMARY SCHOOL AT UCHARICHANPATTI VILLAGE IN KURUCHIPATTI PT.
Dismantling RCC (Sch No.38)
Provision for new Steel Door size 0.75x1.80m
R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
REPAIRS TO THE TOILET BUILDING PT. UNION PRIMARY SCHOOL AT VADAKKUVALAYAPATTI VILLAGE IN SARUGUVALAYAPATTI PT.
Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x43/8"x23/4" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Plastering with Cement Morter 1:5 mix 12 mm ceiling by through Scrapping of old plastered surface over priming coat etc
Plastering with Cement Morter 1:3 mix 10 mm ceiling by through Scrapping of old plastered surface over priming coat etc
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
REPAIRS TO THE TOILET BUILDING (BOYS) PT. UNION PRIMARY SCHOOL AT T.MANICKAMPATTI VILLAGE IN THIRUVATHAVUR PT.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and including cost and conveyane etc., complet
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
25mm PVC Pipe
20mm PVC Elbow
20mm GI Tap
REPAIRS TO THE TOILET BUILDING (GIRLS) PT. UNION PRIMARY SCHOOL AT T.MANICKAMPATTI VILLAGE IN THIRUVATHAVUR PT.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and including cost and conveyane etc., complet
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
25mm PVC Pipe
20mm PVC Elbow
20mm GI Tap
REPAIRS TO THE PT. UNION PRIMARY SCHOOL BUILDING (TILED SIDE) BUILDING AT URNAGMAPATTI VILLAGE AND PANCHAYAT
Provision for Aligment - Tiled roof
Aligment For Re roofing excluding tiles ( Using Old available tiles )
Aligment For Re roofing excluding tiles For Roofing with new tiles 20%
Dismantling the Floor fininsh ( 1:2:4)
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Emulsion painting of of two coats including charges etc., complete
Painting old wood works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
Painting two coats with approved black oxide for old Black board over the cement platered surface
REPAIRS TO THE TOILET BUILDING PT. UNION PRIMARY SCHOOL AT AYYAMUTHANPATTI VILLAGE IN URANGAMPATTI PT.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Ceramic tiles flooring laying with new ceramic tiles of size 305x305x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
25mm PVC Pipe
20mm PVC Elbow
20mm GI Tap
Provision for New steel door size 0.75mx1.80m
REPAIRS TO THE TOILET BUILDING PT. UNION PRIMARY SCHOOL (AC SHEET ) AT ALAGICHIPATTI VILLAGE IN URANGAMPATTI PT.
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Ceramic tiles flooring laying with new ceramic tiles of size 305x305x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadoing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/m2 including finishing the joint and pointing flush with ties surface
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
REPAIRS TO THE TOILET BUILDING PT. UNION PRIMARY SCHOOL (RCC ) AT SOORATHURPATTI VILLAGE IN URANGAMPATTI PT.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
Provision for New steel door of size 0.75mx 1.80m
REPAIRS TO THE TOILET BUILDING PT. UNION PRIMARY SCHOOL (RCC ) DHARAMASANPATTI VILLAGE IN URANGAMPATTI PT.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
25mm PVC Pipe
20mm PVC Elbow
20mm GI Tap
REPAIRS TO THE TOILET BUILDING PT. UNION PRIMARY SCHOOL (RCC ) AT SOORATHURPATTI VILLAGE IN URANGAMPATTI PT.
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
25mm PVC Pipe
20mm PVC Elbow
20mmGI Tap
Provision for New steel door of size 0.75mx 1.80m
REPAIRS TO THE TOILET BUILDING PT. UNION PRIMARY SCHOOL AT MELAVALASAI VILLAGE IN VELLALORE PT.
Dismantling RCC (Sch No.38)
R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Emulsion painting of of two coats including charges etc., complete
Painting old Iron works with two coats of synthetic enamal cost & conveyance and labour charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M ABDUL MUTHALIF
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .