Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹94,789.40Accepted-AOC MAIN ROAD AMBADA POST AMBADA DISTRICT CHHINDWARA M P | AMBADA | CHHINDWARA | MADHYA PRADESH | L-1 | Accepted-AOC Successful Bidder |
Tender Value
₹2.0 L
EMD Value
₹2,500
Closing Date
29 Aug 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Civil) KA
Office of the Area General Manager, Dungariya, Kanhan Area
Providing forest Munara under Ambara Sub Area
2022_WCL_252805_4
ka3450-civ-s-e028 of 2022-23
Open Tender
Civil Works - Others
Item Rate
30 days
Ambara Sub Area
-----N.A.-----
4 documents required · 4 mandatory
₹2,500
3 Oct 2022
17 Aug 2022
30 Aug 2022
17 Aug 2022
29 Aug 2022
17 Aug 2022
17 Aug 2022 - 24 Aug 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars
White washing with lime to give an even shade : New work (three or more coats)
Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement 12 mm cement plaster
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
techsummary_262144.pdf
PDF • 0.18 MB
finsummary_262144.pdf
PDF • 0.18 MB
AL-28-4-22-23.pdf
PDF • 0.18 MB
finance_262144.pdf
PDF • 0.18 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .