| # | Company | Amount |
|---|---|---|
| 1 | ₹17.2 L |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
14 Jul 2025, 11:00 amClosed
EKTA TIBREWAL
RHQ-C&M, NR-III, Lucknow
Repairing cum renovation of Transit Camp at 400/220 kV Mainpuri Substation
NR3/NT/W-CIVIL/DOM/K00/25/07492
Limited
Civil Works – General
Fixed-rate
400/220KV MAINPURI SUB-STATION
₹33,000
4 Sept 2025
27 Jun 2025
16 Jul 2025
27 Jun 2025
14 Jul 2025
27 Jun 2025
Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete.
Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete.
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge. (Cost of aluminium snap beading shall be paid in basic item): With float glass panes of 5 mm thickness (weight not less than 12.50 kg/sqm)
Providing and fixing double action hydraulic floor spring of approved brand and manufacture conforming to IS : 6315, having brand logo embossed on the body / plate with double spring mechanism and door weight upto 125 kg, for doors, including cost of cutting floors, embedding in floors as required and making good the same matching to the existing floor finishing and cover plates with brass pivot and single piece M.S. sheet outer box with slide plate etc. complete as per the direction of Engineer-in-charge. With stainless steel cover plate minimum 1.25 mm thickness
Providing and fixing stainless steel fancy handle of approved make fixed with SS screws etc. complete as per direction of Engineer-in-charge. 200 mm
metre
metre
Description
Name Surmane
Title
DD-MMM-YYYY
India
Udyam Certificate No.
Dessignation:
Ref. of page, Clause & Name of Documents
Date of Retirement/ Resignation from POWERGRID
Designation:
Yes /No
Partial offloading under a Contrct and/or Facilitation beyond 10% of the Contract Price shall also be treated as Termination. For the said purpose, the Contract price means the Contract Price of the Facilities notwithstanding the Construction of the Contract
In case POWERGRID has issued a letter in this regard wherein the firm has been put on hold from award of further contract(s) for a specified period and this specified period of hold is yet to expire, the bidder shall indicate “Yes” against this event.
For the purpose of working out 50% of the Contract, following shall be taken into account suitably:
Main aspect of the QR
50% of the total supply of Conductor/ Insulator under the Contract
50% of the total Transmission Line construction under the Contract
50% of the total bays construction under the Contract
50% of the total supply of Transformer/ Reactor under the Contract
50% of the total supply of GIS bays under the Contract
Regarding Sr. No. 6, in case of ‘Yes’, following information shall be submitted additionally:
Designation:
Designation:
Designation:
Designation:
Saving Account
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Annexure-I Instructions to Bidders.docx
docx • 0.08 MB
Annexure-II Conditions of Contract.docx
docx • 0.09 MB
Annexure-III Drawing.pdf
pdf • 0.11 MB
Annexure-III Indicative BOQ.xlsx
xlsx • 0.10 MB
Annexure-III SFQP.pdf
pdf • 3.46 MB
Annexure-III TS.pdf
pdf • 1.18 MB
Appendix-I to Conditions of Contract.docx
docx • 0.03 MB
Attachment 4 (Affidavit for self-certificataion).DOCX
docx • 0.02 MB
Bid Form.xlsx
xlsx • 0.06 MB
Bid Security Format.docx
docx • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .