| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹74.1 LAccepted-AOC C O BAUPUR MAJHAULIA DISTT CHAPRA BIHAR | SARAN | BIHAR | 841101 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | L-2₹83.1 L+₹9.0 L (12.2%)Rejected-Finance | L-2 | Rejected-Finance Rejected as L-2 | |
| 3 | L-3₹92.3 L+₹18.3 L (24.7%)Rejected-Finance | L-3 | Rejected-Finance Rejected as L-3 | |
| 4 | L-4₹1.3 Cr+₹55.6 L (75.1%)Rejected-Finance | L-4 | Rejected-Finance Rejected as L-2 |
| Sl No | Description | Qty | Unit | PARMANAND KUMAR | AMARENDRA KUMAR RAI | SURENDRA KUMAR SINGH | MAHENDRA SINGH |
|---|---|---|---|---|---|---|---|
| 1.00PARTICULAR | |||||||
| 1.01 | Dismantling of belt structure along with PVC belt (800/1000mm) including cleaning & stacking the same within a distance of 50m. | 2,628 | M | 1,12,110.48 ₹1,32,290.37 | 1,02,492 ₹1,20,940.56 Lowest | 1,76,076 ₹2,07,769.68 | 1,26,144 ₹1,48,849.92 |
| 1.02 | Dismantling of belt structure along with PVC belt (1200mm) including cleaning & stacking the same within a distance of 50m. | 4,361 | M | 2,32,572.13 ₹2,74,435.11 | 2,09,328 ₹2,47,007.04 Lowest | 3,61,963 ₹4,27,116.34 | 2,61,660 ₹3,08,758.8 |
| 1.03 | Transportation of PVC belt (1000/1200mm) from surface to u/g or one section to another sectionin u/g through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part there of including loading, unloading & stacking the same at destination (6989 X 2=13,978 Mtr.) | 13,978 | M | 7,45,446.74 ₹8,79,627.15 | 6,42,988 ₹7,58,725.84 Lowest | 11,60,174 ₹13,69,005.32 | 8,38,680 ₹9,89,642.4 |
| 1.04 | Transportation of steel structures materials from surface to underground through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. (calculation sheet enclosed). | 637.54 | MT | 1,20,322.92 ₹1,41,981.05 | 1,11,569.5 ₹1,31,652.01 Lowest | 1,92,537.08 ₹2,27,193.75 | 1,40,258.8 ₹1,65,505.38 |
| 1.05 | Installation/erection of complete belt conveyor structure (1000mm/1200mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete. (2628.00+4361.00) = 6989.00mtrs. | 6,989 | M | 22,33,055.39 ₹26,35,005.36 | 20,12,832 ₹23,75,141.76 Lowest | 34,80,522 ₹41,07,015.96 | 24,46,150 ₹28,86,457 |
| 1.06 | Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor. (6989X2=13,978.00 Mtr.) | 13,978 | M | 8,92,635.08 ₹10,53,309.39 | 7,96,746 ₹9,40,160.28 Lowest | 13,97,800 ₹16,49,404 | 10,20,394 ₹12,04,064.92 |
| 1.07 | Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/ transporting from other section through haulages/pushing manually. | 12 | Set | 1,27,161.6 ₹1,50,050.69 | 1,14,780 ₹1,35,440.4 Lowest | 1,99,944 ₹2,35,933.92 | 1,32,000 ₹1,55,760 |
| 1.08 | Shifting of tail end drum of belt conveyor (800/1000 mm with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling, carrying , from one place to other place in same section/district within a lead of 50m. Calculation sheet enclosed. | 113 | Set | 5,98,781.35 ₹7,06,561.99 | 5,22,060 ₹6,16,030.8 Lowest | 9,32,702 ₹11,00,588.36 | 6,78,000 ₹8,00,040 |
| 1.09 | General cleaning/house keeping not exceeding 5cm in depth including disposal of cleaned muck/debris to be stacked up to 50 m. or to be levelled and neatly dressed at site of drive head installations.15.00x6.00x 12 nos. = 1080 Sq.m. | 1,080 | Sqm | 10,108.8 ₹11,928.38 | 7,344 ₹8,665.92 Lowest | 15,120 ₹17,841.6 | 11,880 ₹14,018.4 |
Tender Value
₹1.2 Cr
EMD Value
₹1.5 L
Closing Date
19 Jan 2026, 5:00 pmClosed
STAFF OFFICER (MINING), SOHAGPUR AREA, SECL
Staff Officer (Mining), SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP), Mobile No.-9425533459
Dismantling, transportation, installation and commissioning of panel belts (1000 and 1200 mm) with drive-heads and accessories at Khairaha UG Mine
2026_SECL_350463_1
SECL/SGP/SO(M)/eTender /35/25-26/719
Open Tender
Civil Works - Others
Item Rate
365 days
khairaha UG
As per NIT
10 documents required · 10 mandatory
₹1.5 L
18 Mar 2026
2 Jan 2026
21 Jan 2026
2 Jan 2026
19 Jan 2026
3 Jan 2026
2 Jan 2026 - 12 Jan 2026
Dismantling of belt structure along with PVC belt (800/1000mm) including cleaning & stacking the same within a distance of 50m.
Dismantling of belt structure along with PVC belt (1200mm) including cleaning & stacking the same within a distance of 50m.
Transportation of PVC belt (1000/1200mm) from surface to u/g or one section to another sectionin u/g through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part there of including loading, unloading & stacking the same at destination (6989 X 2=13,978 Mtr.)
Transportation of steel structures materials from surface to underground through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. (calculation sheet enclosed).
Installation/erection of complete belt conveyor structure (1000mm/1200mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete. (2628.00+4361.00) = 6989.00mtrs.
Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor. (6989X2=13,978.00 Mtr.)
Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/ transporting from other section through haulages/pushing manually.
Shifting of tail end drum of belt conveyor (800/1000 mm with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling, carrying , from one place to other place in same section/district within a lead of 50m. Calculation sheet enclosed.
General cleaning/house keeping not exceeding 5cm in depth including disposal of cleaned muck/debris to be stacked up to 50 m. or to be levelled and neatly dressed at site of drive head installations.15.00x6.00x 12 nos. = 1080 Sq.m.
Cutting in soft stone by chisel & hammer for digging of pits of foundation work- a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 12 Set = 48.00m3 b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 12 Set = 07.68 m3 c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 12 Set = 07.68 m3 Total = 63.36 m3
Cement concrete/PCC (1:2:4) in foundation/plinth/ flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 12 Set = 48.00m3 b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 12 Set = 07.68 m3 c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 12 Set = 07.68 m3 Total = 63.36 m3
Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m. (a) Sand + Stone Chips (28.20+56.39)
(b) Cement
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface. (calculation sheet enclosed) (a) Sand + Stone Chips (28.20+56.39)
(b) Cement
Unloading of all kind of building materials from tubs at destination in u/g and stacking the same (a) Sand + Stone Chips (28.20+56.39)
(b) Cement
Dismantling and transporting of 1000mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end.
Installation of 1000 mm drive head (double drive drum) with loop take-up & all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge.
Dismantling & transporting of 1200 mm drive head (double drive drum) with loop take up and all accessories (like as motor, gear box, drive drum, girders, frame, chute & side plate etc) with lead of 100m/up to track end in u/g.
Installation of 1200 mm drive head (double drive drum) with loop take up and all accessories (like as motor, gear box, drive drum, girders, frame, chute & side plate etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge.
PART-B:-Material Cost Cement
Stone Chips
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.33 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_363214.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .