| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAccepted-AOC | L1 | Accepted-AOC Quoted lowest rate | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹39.7 L
EMD Value
₹79,360
Closing Date
22 Nov 2022, 2:00 pmClosed
EE, PWRD, Dhemaji TRD
EE, PWRD, Dhemaji TRD
Repair and restoration of Flood damages of culvert No.4/1 at Sankarpur LP School to Chenaichuk Ch. 6830.00m under SDRF for the year 2021-22.
2022_PWD_27790_1
DMJ/ TRD/SDRF-01/2021-22/1881-86 Date 16.11.2022
Open Tender
Civil Works
Works
120 days
Dhemaji
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,190
₹79,360
Yes
16 Mar 2023
17 Nov 2022
25 Nov 2022
17 Nov 2022
22 Nov 2022
18 Nov 2022
17 Nov 2022 - 22 Nov 2022
Amount
Dismantling Dismantling of existing existing structures structures like culverts culverts, bridges bridges, retaining retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.c) Reinforced Cement Concrete.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I Ordinary soil,A Manual Means,(I) Without dewatering,(i)upto 3 m depth
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.(N) Without plasticiser, A PCC Grade M-15
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.(N) Without plasticiser, A PCC Grade M-20
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.(N) Without plasticiser, C RCC Grade M-20
Supplying, fitting and placing TMT bar reinforcement in open foundation complete as per drawing and technical specifications clause 1000 and 1202
Plain/Reinforced cement concrete, in sub-structure complete as per drawing and technical specification including steel shuttering formwork.(N) Without plasticiser, A PCC Grade M-15
Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and technical specifications clauses 1002,1005,1010 &1202.
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) Without plasticiser, E RCC Grade M-20, a) Height upto 5 m,Case-I
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Cl. 800 and 1206.3,B. Natural gravel
Providing Pressure relief pipes 100 mm dia. In bottom slab of box cell on a filter media base of 500x 500 mm as per drawing and technical specfication clause 1205.5.7
Providing and Laying Curtain wall complete as per drawing and Technical specification clause 1304, B) Cement Concrete Grade M-15
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall.
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification , 'II -Sandy material
Providing weep holes in brick/stone masonry abutment and return wall complete
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .