Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.8 LAccepted-Finance | ₹11.8 L | 1 | Accepted-Finance Accepted |
| 2 | 2₹12.2 LAccepted-Finance | ₹12.2 L | 2 | Accepted-Finance Accepted |
| 3 | 3₹13.2 LAccepted-Finance | ₹13.2 L | 3 | Accepted-Finance Accepted |
Tender Value
₹14.8 L
EMD Value
₹14,800
Closing Date
28 May 2026, 5:00 pmClosed
BDO DIGAPAHANDI
BDO PANCHAYAT SAMITI DIGAPAHANDI
Construction of Addl Class room at Karapada Nodal H.S of Karapada GP
2026_PRBDP_128998_3
DIGPS-01/2026-27
Open Tender
Civil Works - Others
Percentage
180 days
KARAPADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
BLOCK DEVELOPMENT OFFICER DIGAPAHANDI
₹14,800
Yes
30 May 2026
12 May 2026
30 May 2026
12 May 2026
28 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Laying and Jointing PVC Pipe. Heading | - | - | - | - |
| 2 | Earth work in Hard Soil withen 50m, intial lead and 1.50m, intial lift including rough dressing and breaking the clouds to maximum 5cm to 7cm laying the layers not exceeding 0.30m, in depth etc complete as per the direction of Engineer-in-Charge. | 47.84 | Cum. | 276.89 | ₹13,246.42 |
| 3 | Providing and filling clean dry sand of approved quality from approved quarry in foundation and plinth in 6" thick layer well watered and rammed including the cost, conveyance, royalties and taxes of all material and labour etc. complete as per the direction of Engineer-in-Charge. | 51.89 | Cum. | 660.96 | ₹34,297.21 |
| 4 | Cement Concrete (1:3:6) using 40 mm size HG metal of approved quality from approved quarry including hoisting, compacting curing, finishing the exposed surface smooth, dewatering, shorting, if nessery at the time of laying concrete with cost, coveyance, royalty & taxed of all material, cost of labour and T & P etc all complete as per the direction of the Engineer-in-Charge. | 13.4 | Cum. | 6,091.01 | ₹81,619.53 |
| 5 | R.C.C. work of M-20 grade with 20 mm and down grade HGCB stone chipes including hosting and laying concrete in layers not exceeding 15cm thick, compacting by means of vibrator, curing, finishing the exposed surface smooth, dewatering, shorting, if nessery at the time of laying concrete with cost, coveyance, royalty & taxed of all material, cost of labour and T & P etc all complete as per the direction of the Engineer-in-Charge. | 34.11 | Cum. | 6,170.98 | ₹2,10,492.13 |
| 6 | Supply, Cutting straighting coiled or bent up un coated HYSD bar reinforcement for RCC work including bending, binding & tying the grild and placeing in proper position with cost, conveyayance of binding wire 18 to 20 gauge and HYSD bar, cost of all material and labour and T & P etc complete as per the direction of Engineer-in-Charge. | 35.82 | Qntl. | 9,290.38 | ₹3,32,781.41 |
| 7 | Rigid smooth centering shuttring for R.C.C works including false work and dismantling then after casting with cost of all materials etc complete as per the direction of Engineer-in-Charge. | - | - | - | - |
| 8 | a) C.C foundation & Plinth bend | 61.12 | Sqm. | 248.67 | ₹15,198.71 |
| 9 | b) R.C.C Lintel | 10.9 | Sqm. | 574.03 | ₹6,256.93 |
| 10 | c) Beam and Column. | 74.77 | Sqm. | 1,205.74 | ₹90,153.18 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.43 MB
DTCN202627.pdf
Tender Documents • 3.41 MB
BOQ_590272.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].