| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance CHANDIRJHAR ALIPURDUAR | L1 | Accepted-Finance 1ST LOWEST | |
| 2 | L2₹3.2 L+₹321.15 (0.10%)Accepted-Finance CHENGPARA ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 735204 | L2 | Accepted-Finance 2ND LOWEST | |
| 3 | L3₹3.2 L+₹642.31 (0.20%)Accepted-Finance SOVAGANJ ALIPURDUAR | L3 | Accepted-Finance 3RD LOWEST |
Tender Value
₹3.2 L
EMD Value
₹6,500
Closing Date
19 Feb 2026, 2:00 pmClosed
PRADHAN CHAPARERPAR NO-I GP
VILLAND POST CHENGPARA, CHAPARERPAR DIST ALIPURDUAR
INSTALLATION OF DEEP TUBWELL ALONG WITH SOAK PIT AND PLAT FORM NEAR THE HOUSE OF SWAPAN DEBNATH, BINAY PANDIT, SATYABAN BROJOBASI, SUMON PANDIT AND MANINDRA DEBNATH AT CHANDIRJHAR, PART NO. - 12-260 UNDER CHAPARERPAR I G.P. FOR THE YEAR 2025-26
2026_ZPHD_1003923_3
19/15th FC/CHAP-I/2025-2026
Open Tender
CIVIL WORKS
Percentage
30 days
CHANDIRJHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
PRADHAN CHAPARERPAR NO-I GP
₹6,500
Yes
12 Mar 2026
11 Feb 2026
21 Feb 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
SECTION - A (VI), ITEM NO. - 1, PAGE NO. - 49 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore.
SECTION - A (II), ITEM NO. - 19(II), PAGE NO. - 13 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017 Supplying, fitting and fixing PVC pipes for underground work of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted including cost of all materials ,jointing materials, cutting pipes, making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.)
SECTION - A (VI), ITEM NO. - 5, PAGE NO. - 52 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017Supplying high density polythene strainer of approved make with adapter conforming to I.S. specifications.
SECTION - C (II), ITEM NO. - 5, PAGE NO. - 104 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017 Supply of G.I. reducing socket with I.S.I. mark.
SECTION - C (II), ITEM NO. - 5, PAGE NO. - 104 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017 Supply of G.I. plug
SECTION - C (II), ITEM NO. - 9, PAGE NO. - 107 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II)WITH EFFECT FROM 01.11.2017 Supply of pendent tee with I.S.I. mark.
SECTION (C),(C) - (II),ITEM NO. - 13,PAGE NO. - 109 SCHEDULE OF RATES, P.W.D.(W.B.) SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017 Supply of G.I. union.
SECTION (C),(C) - (II),ITEM NO. - 15,PAGE NO. - 110 SCHEDULE OF RATES, P.W.D.(W.B.) SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017 Supply of G.I. short piece of TATA make (Above 50mm & upto150 mm long)
SECTION - A (II), ITEM NO. - 35, PAGE NO. - 22 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017 Labour for fitting and fixing G.I. specials including cost of jointing materials
SECTION - A (II), ITEM NO. - 2, PAGE NO. - 3 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017 Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials, jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paintcomplete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately)
SECTION - A (VI), ITEM NO. - 24, PAGE NO. - 55 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II)WITH EFFECT FROM 01.11.2017 Packing the annular space between the outside of the tube well pipes & strainers and the bore with pea size washed gravel of approved quality having size from 2 mm to 5 mm or the size approved by the Engineer-incharge including cost of all materials labour and equipment complete
SECTION - A (VI), ITEM NO. - 20, PAGE NO. - 55 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017 Washing and developing tube well with air compressor pump and engine for 8 (eight) hours continuous pumping per day with necessary arrangements for testing the yield in gallons per hour with 'V' notch including hire and labour charges for all tools and plants and scaffolding as required.
ECTION - A (VI), ITEM NO. - 14, PAGE NO. - 54 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II)WITH EFFECT FROM 01.11.2017 Supplying, fitting and fixing popular Maya pump no-6 or similar.
SECTION - A (VI), ITEM NO. - 14, PAGE NO. - 54 SCHEDULE OF RATES, P.W.D.(W.B.) FOR SANITARY & PLUMBING WORKS (VOLUME. - II) WITH EFFECT FROM 01.11.2017 Collecting sample of water for bacteriological and chemical test from any depth at any time during execution of work including hire and labour charges for tools and plants and sterilising the equipments, paying all charges and fees, testing etc. complete in all respect as per direction.
SECTION - 1 (A), ITEM NO. - 2, PAGE NO. - 1 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I)WITH EFFECT FROM 01.11.2017 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete.
SECTION - 1(C), ITEM NO. - 1,PAGE NO. - 1 3RD CORRIGENDA & ADDENDA PUBLISHED ON 04.06.2018 OVER SECTION - 1(C), ITEM NO. - 14,PAGE NO. - 1 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I)WITH EFFECT FROM 01.11.2017 Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
SECTION - 1 (C), ITEM NO - 27, PAGE NO. - 10 3RD CORRIGENDA & ADDENDA PUBLISHED ON 04.06.2018 OVER SECTION - 1 (C), ITEM NO. - 4,PAGE NO. - 24 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I) WITH EFFECT FROM 01.11.2017 Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
SECTION - 1 (C), ITEM NO - 36, PAGE NO. - 42 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I)WITH EFFECT FROM 01.11.2017 Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness withrequired bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
SECTION - 1 (C), ITEM NO - 38, PAGE NO. - 43 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I)WITH EFFECT FROM 01.11.2017 Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect.(only the area in contact with concrete to be measured)
SECTION - 1 (C), ITEM. NO. - 1, PAGE NO. - 1 10TH CORRIGENDA & ADDENDA PUBLISHED ON 22.01.2020 OVER SECTION - 1 (C), ITEM. NO. - 40, PAGE NO. - 43 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I) WITH EFFECT FROM 01.11.2017 Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (ifnecessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16gauge black annealed wire at every intersection, complete as per drawing and direction.
SECTION - 1 (C), ITEM. NO. - 3, PAGE NO. - 1 3RD ADDENDA & CORRIGENDA, DATE OF PUBLISHING: 04.06.2018 OVER SECTION - 1 (C), ITEM. NO. - 7,PAGE NO. - 15 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I) Brick work with 1st class bricks in cement mortar (1:4)
SECTION - 1 (S), ITEM. NO. - 1,PAGE NO. - 61 3RD. ADDENDA & CORRIGENDA, DATE OF PUBLISHING: 04.06.2018 OVER SECTION - 1 (S), ITEM NO - 1, PAGE NO. - 251 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I)WITH EFFECT FROM 01.11.2017 Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand (including cost of sand) on completion of steining works.
SECTION - 1 (S), ITEM. NO. - 2, PAGE NO. - 71 3RD. ADDENDA & CORRIGENDA, DATE OF PUBLISHING: 04.06.2018 OVER SECTION - 1 (S), ITEM NO - 2, PAGE NO. - 256 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I) WITH EFFECT FROM 01.11.2017 R.C.C. well ring made with cement concrete 1:1.5:3 with stone chips and 0.80% reinforcement (including the cost of shuttering and reinforcement) cast at site fitted and fixed in position after proper curing true to plumb in the well including jointing with cement mortar 1:2 complete as per direction.
SECTION - 1(D), ITEM NO. - 4,PAGE NO. - 22 3RD CORRIGENDA & ADDENDA PUBLISHED ON 04.06.2018 OVER SECTION - 1(D), ITEM NO. - 6,PAGE NO. - 48 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, MATERIALS & LABOUR (VOLUME. - III)WITH EFFECT FROM 30.08.2018 Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75kg/sq.m all complete including all materials and labour.In ground floor. 3 mm. thick topping (High polishing grinding on this item isnot permitted with ordinary cement).Using grey cement
SECTION - 1 (I), ITEM. NO. - 1,PAGE NO. - 49 3RD ADDENDA & CORRIGENDA, DATE OF PUBLISHING: 04.06.2018 OVER SECTION - 1 (I), ITEM. NO. - 1, PAGE NO. - 189 SCHEDULE OF RATES, P.W.D.(W.B.) FOR BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I)WITH EFFECT FROM 01.11.2017 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course,scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface
SECTION - I, ITEM NO. - 15, PAGE NO. - 192 SCHEDULE OF RATES, P.W.D.(W.B.) BUILDING WORKS, LABOURS AND MATERIALS (VOLUME. - I)WITH EFFECT FROM 01.11.2017 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m
CHAPTER - 8, ITEM NO. - 8.07,PAGE NO. - 270 SCHEDULE OF RATES, P.W.D.(W.B.)ROAD & BRIDGE WORKS (VOLUME. - III)WITH EFFECT FROM 30.08.2018 Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65m. of which top 750 mm. is of section 100 x 13 mm.and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
AD LABOUR CESS 1%
AD SGST 9%
AD CGST 9%
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_2461501.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .