| 1.001.) Construction of Retaining Wall From Pudhu Colony Road Thangavel Kadu to Muthukumar Kadu H/O Kurichi | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B | 89.69 | cum | 190 ₹17,041.10 | 210 ₹18,834.90 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete | 22.42 | cum | 5,168.25 ₹1.2 L | 5,250 ₹1.2 L |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical | 597.9 | cum | 516.5 ₹3.1 L | 525 ₹3.1 L |
| 5.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. | 261.58 | cum | 5,490.09 ₹14.4 L | 5,490.09 ₹14.4 L |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,38,009 ₹3.4 L | 3,39,576 ₹3.4 L |
Tender Value
₹22.4 L
EMD Value
₹22,500
Closing Date
21 May 2025, 3:00 pmClosed
BDO(BP)
BDO, Valapadi
Construction of Retaining Wall From Pudhu Colony Road Thangavel Kadu to Muthukumar Kadu H/O Kurichi Panchayat Valapady Block at Salem District -NNT -2025-2026
2025_RDTN_555283_1
Roc.No.1053/2025/A2
Open Tender
Civil Works
90 days
BDO, Valapadi
As per tender document
3 documents required · 3 mandatory
₹0
₹22,500
9 Jan 2026
8 May 2025
21 May 2025
8 May 2025
21 May 2025
8 May 2025
Amount
1.) Construction of Retaining Wall From Pudhu Colony Road Thangavel Kadu to Muthukumar Kadu H/O Kurichi
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.S.MURUGESAN (BID ID -1343901)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid