Loading…
Loading…
Tender Value
₹1.3 L
EMD Value
₹2,600
Closing Date
29 Jul 2026, 6:55 pm3d left
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
CONSTRUCTION OF BATHROOM NEAR DARASGAH BRANPATHRI NAGBAL TRAL
2026_RDPR_316932_28
e- NIT No. 57/2026-27 Dated 20-07-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹2,600
20 Jul 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter from
cutting edge | 9.08 | cum | - | - |
| 2 | Providing and Laying of precast PCC rings for soakage pit incl fixing cost carriage etc complete | - | Nos | - | - |
| 3 | Providing and Laying of precast PCC LID for soakage pit incl fixing cost carriage etc complete | - | Nos | - | - |
| 4 | Providing and laying of stone soling incl carriage by MT for 5kms complete job | 1.04 | cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) | 2.29 | cum | - | - |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : 1:4 cement mortar mix | 5.08 | cum | - | - |
| 7 | Extra for brick work with common burnt clay bricks/cement concrete bricks in
superstructure above plinth level upto floor five level | 5.08 | cum | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level in 1:2:4mix | 1.06 | cum | - | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 96 | kgs | 1 | ₹95.9 |
| 10 | Providing and fixing of pre-cast steel doors complete job | 1 | No | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_1036351.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].