Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.0 LAccepted-AOC GERUA PO BARKHOPA PS TAMULPUR DIST BAKSA ASSAM PIN 781367 | BAKSA | ASSAM | 781367 | L1 | Accepted-AOC Awarded | |
| 2 | L1₹52.0 LRejected-Finance VILL KACHARI SOLMARI P O P S RANGIA DIST KAMRUP R ASSAM | RANGIA | KAMRUP R | ASSAM | L1 | Rejected-Finance Refer Financial Minutes | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Admitted. Refer Technical minutes |
Tender Value
₹54.7 L
EMD Value
₹1.1 L
Closing Date
6 Mar 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM
Soil Erosion Protection Project at Village Kadong
2024_SCD_36421_1
Tender/NIT/Pt/2023-24/9447
Open Tender
Civil Works
Item Rate
90 days
Baksa
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
₹1.1 L
Yes
8 Aug 2024
19 Feb 2024
7 Mar 2024
19 Feb 2024
6 Mar 2024
22 Feb 2024
Amount
Construction of R.C.C. Check Dam (Part-A)
clearing and grubbing road land includinguprooting rankvegeation, grass, bushes, shrubs, samplings and trees grith upto 300 mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed
Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and back filling in trenches with approved material
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40 mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
RCC Works in insubstructure complete as per drawing & technical specification and steel shuttering form work
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications
Plastering with cement mortar (1:3) on R.C.C. works as per technical specifications
Providing and laying of filter media with granular material/stone crush edaggregates satisfying the requirment laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600 mm with small ersize towards the soil and bigger size toward the Head Wall to the full height compact to a firm condition complete as per drawing and specification.
Earth Work in filling in front of the guid bund by head load upto lead of 60 mw approved quality all leads and lifts ramming and compact ng with rammer weighig not less than 10 kg and falling from height of not less than 90 cm and sprinkling with water if necessary i) In front of the structure (1:2 side slope) : ii) Both side of the structure
iii) In Periphery Bund (Both side of the structure) :
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, including preparation of ground, fetching of sods and watering as per Technical Specification.
Providing & laying boulder apronon gully bed in upstream and down stream of RCC structure for protection against scour with stone boulder sweighting not less than 40 kg each complete as per drawing & technical specifications Boulder laid dry without wire crates.
Providing Weep Holes in RCC Head Wall etc. with 100 mm dia AC pipe extending through full width of the structure with slope of IV: 20 H towards drawing face. Complete as per drawing and Technical specification
R.C.C. works for slab and Post with aggregate in size 13 mm to 38 mm of down graded gravel in proportion 1:2:4 including necessary shuttering, curing etc. complete as directed. (Payment of M/S Road will be made Separately ) (E) R.C.C. Grade M 20
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications
Cement plastering works to the exposed Posts, slabs in prop 1:3 including curing etc. complete
Construction of diversion channel to flow the water of the propose site
Earthwork in filling the diversion channel after completion of work
Cost of RCC sign board including painting , writing & fitting fixing at project site, complete.
Construction of R.C.C. Guard wall (Part-B)
clearing and grubbing road land including uprooting rank vegeation, grass, bushes, shrubs, samplings and trees grith upto 300 mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed
Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and back filling intrenches with approved material.
Providing stone/brick soling in earthen shoulder with stone/ best quality jhamma brick, sand packed and laid to true line and level and in panel after preparing the subgrade including earthwork including all labour and materials and and if necessary dewatering etc. complete as per drawing and technical specifications
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications (i) With TATA make TMT CRS (Fe500 grade) rebar
Cement plastering works to the exposed Posts, slabs in prop 1:3 including curing etc. complete
Construction of Boulder Revetment (Part-C)
clearing and grubbing road land including uprooting rank vegeation, grass, bushes, shrubs, samplings and trees grith upto 300 mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed
Earth work in excavation of foundation of structures as per draw-ing and technical specification, (i) Ordinary soil
Providing & laying of boulder apron laid in wire crates made with 4 mm dia G.I. wire conforming to IS :280 & IS 4826 in 100 mm x 100 mm Mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40kg. each.
MD. FAIZUDDIN AHMED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .