| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | L1 | Accepted-AOC Approved by Accepting officer | |
| 2 | L2₹7.8 L+₹56,590 (7.82%)Rejected-Finance NEAR SVN UNIVERSITY NARSINGHPUR ROAD SIRONJA SAUGOR MP 470228 | SAUGOR | SAGAR | MP | 470228 | L2 | Rejected-Finance Not Lowest Bidder | |
| 3 | L3₹8.3 L+₹1.0 L (14.0%)Rejected-Finance ANAND NAGAR ROAD NO 4 RAJAKHEDI MAKRONIA SAUGOR MP | SAUGOR | SAUGOR | MP | L3 | Rejected-Finance Not Lowest Bidder |
| Sl No | Description | Qty | Unit | M/S Sai supplier L1 | M/S JAINENDRA KUMAR JAIN L2 | Pandey Construction and Engrs L3 |
|---|---|---|---|---|---|---|
| 1.00 | Taking down existing water proofing treatment of any description incl PCC padding,/ or cement plastering work any thickness from roof surfaces, cleaning of roof and prepairing it for further treatment incl make good necessary dubbing out wherever required and removing rubbish from site complete all as specified and directed. | 640 | Sqm | 15 ₹9,600 | 15 ₹9,600 | 10 ₹6,400 Lowest |
| 2.00 | Material and Labour for Brushing neat cement slurry with 3.0 kg of cement per sq. metre complete all as specified and as directed. | 640 | Sqm | 5 ₹3,200 Lowest | 70 ₹44,800 | 80 ₹51,200 |
| 3.00 | Matrial and Labour for Cement Concrete 1:2:4 Type B-0 (12.50 mm Graded Stone aggregate in padding, finishing surface concrete topping even and fair (without using extra cement) of average thickness 40 mm in slope as required over roof complete all as specified and as directed. | 640 | Sqm | 200 ₹1,28,000 | 190 ₹1,21,600 Lowest | 200 ₹1,28,000 |
| 4.00 | Material and Labour for 10 mm thick Plastering in CM 1:4 on concrete roof surfaces using water proofing compound @ 3% by weight of cement and finishing the surface even and fair complete all as specified and directed.
WPC will be measured separately. | 640 | Sqm | 140 ₹89,600 Lowest | 140 ₹89,600 Lowest | 150 ₹96,000 |
| 5.00 | Supply only liquid waterproofing compound ISI Marked all as specified and as directed. | 150 | Kg | 30 ₹4,500 Lowest | 80 ₹12,000 | 50 ₹7,500 |
| 6.00 | Material and Labour for Applying evenly two coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m incl cleaning surface complete all as specified and as directed. | 640 | Sqm | 150 ₹96,000 | 70 ₹44,800 Lowest | 100 ₹64,000 |
| 7.00 | Material and Labour for APP based polymeric membrane( plain /gravel ) minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) land on primed surface by forced application ,The overlaps while torching shall be 100 mm in both directions(longititudinal and transverse directions). All overlap joints shall be sealed throughly by thermofusing both the membrene layers and sealing it with the help of hot trowel. The overlap joints shall be made as monolithic layer. complete all as specified. | 640 | Sqm | 380 ₹2,43,200 Lowest | 480 ₹3,07,200 | 425 ₹2,72,000 |
| 8.00 | Material and labour for one coat of aluminium paint at the rate of 100 gm/Sqm as per manufacturer's instructions over bituminous layer, complete all as specified & directed at site. | 640 | Sqm | 20 ₹12,800 Lowest | 20 ₹12,800 Lowest | 40 ₹25,600 |
| 9.00 | Taking up or down 15mm bore steel tubing and connections, including cleaning for refixing or removal out side MD land all as directed by Engr-in-Charge. | 100 | RM | 20 ₹2,000 | 20 ₹2,000 | 5 ₹500 Lowest |
| 10.00 | Taking up or down 20mm bore steel tubing and connections, including cleaning for refixing or removal out side MD land all as directed by Engr-in-Charge. | 100 | RM | 20 ₹2,000 | 30 ₹3,000 | 5 ₹500 Lowest |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
23 May 2026, 6:00 pmClosed
Madan Lal Beniwal, IDSE, AEE Civil
AGE I DHANA PIN 470228, DIST SAGAR, MP
REPAIR TO ROOF LEAKAGE/SEEPAGE AND SUNKEN TREATMENT AND ALLIED WORKS IN OTM ACCN OF NCO ACADEMY AT MIL STN DHANA
2026_MES_763072_1
8300/DH/14/E8
Open Tender
Civil Works
Item Rate
180 days
AGE (I) DHANA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Assistant Garrison Engineer (I) Dhana
₹20,000
Yes
18 Jul 2026
2 May 2026
25 May 2026
2 May 2026
23 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down existing water proofing treatment of any description incl PCC padding,/ or cement plastering work any thickness from roof surfaces, cleaning of roof and prepairing it for further treatment incl make good necessary dubbing out wherever required and removing rubbish from site complete all as specified and directed. | 640 | Sqm | - | - |
| 2 | Material and Labour for Brushing neat cement slurry with 3.0 kg of cement per sq. metre complete all as specified and as directed. | 640 | Sqm | - | - |
| 3 | Matrial and Labour for Cement Concrete 1:2:4 Type B-0 (12.50 mm Graded Stone aggregate in padding, finishing surface concrete topping even and fair (without using extra cement) of average thickness 40 mm in slope as required over roof complete all as specified and as directed. | 640 | Sqm | - | - |
| 4 | Material and Labour for 10 mm thick Plastering in CM 1:4 on concrete roof surfaces using water proofing compound @ 3% by weight of cement and finishing the surface even and fair complete all as specified and directed.
WPC will be measured separately. | 640 | Sqm | - | - |
| 5 | Supply only liquid waterproofing compound ISI Marked all as specified and as directed. | 150 | Kg | - | - |
| 6 | Material and Labour for Applying evenly two coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m incl cleaning surface complete all as specified and as directed. | 640 | Sqm | - | - |
| 7 | Material and Labour for APP based polymeric membrane( plain /gravel ) minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) land on primed surface by forced application ,The overlaps while torching shall be 100 mm in both directions(longititudinal and transverse directions). All overlap joints shall be sealed throughly by thermofusing both the membrene layers and sealing it with the help of hot trowel. The overlap joints shall be made as monolithic layer. complete all as specified. | 640 | Sqm | - | - |
| 8 | Material and labour for one coat of aluminium paint at the rate of 100 gm/Sqm as per manufacturer's instructions over bituminous layer, complete all as specified & directed at site. | 640 | Sqm | - | - |
| 9 | Taking up or down 15mm bore steel tubing and connections, including cleaning for refixing or removal out side MD land all as directed by Engr-in-Charge. | 100 | RM | - | - |
| 10 | Taking up or down 20mm bore steel tubing and connections, including cleaning for refixing or removal out side MD land all as directed by Engr-in-Charge. | 100 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
14TENDERPAGES.pdf
Tender Documents • 2.63 MB
14SoC.pdf
Additional Documents • 0.55 MB
BOQ_854882.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .