| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.0 L+₹11,549 (2.98%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S BURHAN ENTERPRISES L2 | M/s ZAHID CONTRACTORS L1 |
|---|---|---|---|---|---|
| 1.00 | Supply , Carriage upto site,installation ,testing & commissioning of 11/0.433kV, 100 KVA , 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficient Level-2, Al. wound , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. | 1 | No. | 2,22,000 ₹2,22,000 Lowest | 2,35,000 ₹2,35,000 |
| 2.00 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 9 Mtr Long (410-SP-33) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 2 | No. | 20,000 ₹40,000 Lowest | 26,500 ₹53,000 |
| 3.00 | Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix, 0.48 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 2 | No. | 3,500 ₹7,000 | 1,000 ₹2,000 Lowest |
| 4.00 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles | 2 | Km | 500 ₹1,000 Lowest | 1,200 ₹2,400 |
| 5.00 | Supply & fixing of GI nuts and bolts of sizes | 20 | Kgs | 140 ₹2,800 Lowest | 160 ₹3,200 |
| 6.00 | Supply , installation ,testing & commissioning of pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm as per REC standard. | 2 | No | 800 ₹1,600 | 500 ₹1,000 Lowest |
| 7.00 | Supply , installation ,testing & commissioning of Iron GI Channel/Angle/Flat of sizes including clamps for Transformer Pad/G.I Channel Bedding ,L.A Set/G.O Set/Horn Gapas per specification enclosed in Drawing.( Refer Drawing) | 260 | Kgs | 150 ₹39,000 Lowest | 170 ₹44,200 |
| 8.00 | Supply , installation ,testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type as per REC standard | 1 | set | 8,000 ₹8,000 Lowest | 11,000 ₹11,000 |
| 9.00 | Supply , installation ,testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A confirming to ISI specification | 1 | set | 12,000 ₹12,000 | 8,000 ₹8,000 Lowest |
| 10.00 | Supply , installation ,testing & commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 1 | set | 9,000 ₹9,000 | 6,000 ₹6,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,800
Closing Date
3 Nov 2025, 4:00 pmClosed
Executive Engineer ED Handwara
Office of Executive Engineer ED Handwara
Providing and fixing of (installtion of ) 100KVA Transformer near Hospital, Tehsil Office, BDO Office and other Offices at Tarathpora (Pool Work) under Distrcict Capex Budget (PRI) 2025-26 of ED Handwara
2025_PDD_292013_1
e-NIT 56 of 2025-26
Open Tender
Electrical Works
Turn-key
90 days
Office of Executive Engineer ED Handwara
Refer to SBD
2 documents required · 2 mandatory
₹500
Office of Executive Engineer ED Handwara
₹7,800
13 Nov 2025
14 Oct 2025
4 Nov 2025
16 Oct 2025
3 Nov 2025
16 Oct 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tendernotice_2.pdf
PDF • 1.00 MB
BOQ_941118.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .