| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹62.7 L+₹35,577.77 (0.57%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹64.7 L+₹2.4 L (3.78%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹74.0 L+₹11.7 L (18.7%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹77.5 L+₹15.2 L (24.3%)Rejected-Finance 819 1 GALI NO 10 PHOOLBAG COLONY MEERUT UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S SUDHIR KUMAR CONTRACTOR L6 | M/S PUSHPENDER KUMAR SHARMA L4 | M/S R.K. GUPTA AND SONS HUF L3 | kapil kumar contractor L1 | M/S VIPIN KUMAR CONTRACTOR L7 | SINGHWAL INDUSTRIES L5 | BHAI JI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in clearance of internal section of canal in all type of soil, with all lift & lead ,the earth from clearance to be disposed in strengthening of canal banks & Dowla with its proper compaction, ramming & dressing complete i/c all cost of labour ,T&P etc. as per directed by engineer-in-charge. | 6,791.81 | cum | 30 ₹2,03,754.3 | 20 ₹1,35,836.2 Lowest | 33.35 ₹2,26,506.86 | 32.13 ₹2,18,227.65 | 25 ₹1,69,795.25 | 45 ₹3,05,631.45 | 32.32 ₹2,19,477.34 |
| 2.00 | Bricks on edge soling with straight over brunt bricks on canal service road i/c joints filled with local sand, preparation of base to proper slope , ramming , dressing and i/c supply of bricks and all material , labour , T&P etc. required for proper completion of work . | 16,345 | sqm | 421 ₹68,81,245 | 400 ₹65,38,000 | 333.54 ₹54,51,711.3 | 321.39 ₹52,53,184.93 Lowest | 435 ₹71,10,075 | 412 ₹67,34,140 | 323.23 ₹52,83,194.35 |
| 3.00 | Scrapping Internal section of canal i.e. Bed & Slope & Bank Top with silt upto 5 cm. i/c all cost of all labour, T&P etc complete. as directed by engineer-in-charge. | 27,745 | sqm | 4.5 ₹1,24,852.5 | 0.5 ₹13,872.5 Lowest | 3.26 ₹90,448.7 | 3.14 ₹87,202.54 | 2 ₹55,490 | 4 ₹1,10,980 | 3.16 ₹87,708.88 |
| 4.00 | Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete | 64.13 | cum | 100 ₹6,413 | 50 ₹3,206.5 Lowest | 72.49 ₹4,648.78 | 69.85 ₹4,479.48 | 75 ₹4,809.75 | 180 ₹11,543.4 | 70.25 ₹4,505.13 |
| 5.00 | Providing and Laying cement concrete A20,M10 (1 Cement : 3 Coarse sand: 6 graded stone aggregate) in foundation or flooring including all cost of material, labour, T&P etc complete as required for proper completion of work. | 11.25 | cum | 5,101 ₹57,386.25 | 4,500 ₹50,625 | 3,697.9 ₹41,601.38 | 3,563.22 ₹40,086.26 Lowest | 4,100 ₹46,125 | 4,000 ₹45,000 | 3,583.63 ₹40,315.84 |
| 6.00 | Providing and Fixing steel reinforcement Fe-550 (TATA/ SAIL/ RINL/ JINDAL) including all cost of steel, binding wire, chairs, spacers etc for R.C.C. including bending, binding and placing in position with all cost of labour, T&P etc complete. As per specifications and direction of E/I. | 0.9 | MT | 72,464 ₹65,217.6 | 65,000 ₹58,500 | 52,529.15 ₹47,276.24 | 50,616.1 ₹45,554.49 Lowest | 65,000 ₹58,500 | 70,000 ₹63,000 | 50,905.96 ₹45,815.36 |
| 7.00 | Providing Centering & Shuttering for R.C.C. work with all cost of material, labour & T.& P. etc. complete. | 360 | sqm | 500 ₹1,80,000 | 175 ₹63,000 Lowest | 416.82 ₹1,50,054.3 | 401.64 ₹1,44,589.68 | 280 ₹1,00,800 | 200 ₹72,000 | 403.94 ₹1,45,417.5 |
| 8.00 | Providing and Laying RCC A20,M20 (1 Cement : 1.5 Coarse sand: 3 graded stone aggregate) in foundation or slab or column or beam or wall including all cost of material, labour, T&P etc complete as required for proper completion of work. | 85.5 | cum | 4,000 ₹3,42,000 Lowest | 6,000 ₹5,13,000 | 5,005.43 ₹4,27,964.27 | 4,823.7 ₹4,12,426.44 | 5,700 ₹4,87,350 | 4,500 ₹3,84,750 | 4,850.76 ₹4,14,739.98 |
| 9.00 | Painting with synthetic enamel paint of approved brand & manufacture of required colour to give an even shade in two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. | 232.5 | sqm | 162 ₹37,665 | 100 ₹23,250 | 120.54 ₹28,025.55 | 116.15 ₹27,005.81 | 118 ₹27,435 | 95 ₹22,087.5 Lowest | 116.82 ₹27,160.65 |
Tender Value
₹89.2 L
EMD Value
₹1.8 L
Closing Date
29 Aug 2026, 3:00 pmClosed
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1176035_3
08/SE-1/2026-27
Open Tender
Civil Works
Piece-work
120 days
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.8 L
Office of SE 1st IWC Meerut
28 Sept 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in clearance of internal section of canal in all type of soil, with all lift & lead ,the earth from clearance to be disposed in strengthening of canal banks & Dowla with its proper compaction, ramming & dressing complete i/c all cost of labour ,T&P etc. as per directed by engineer-in-charge. | 6,791.81 | cum | - | - |
| 2 | Bricks on edge soling with straight over brunt bricks on canal service road i/c joints filled with local sand, preparation of base to proper slope , ramming , dressing and i/c supply of bricks and all material , labour , T&P etc. required for proper completion of work . | 16,345 | sqm | - | - |
| 3 | Scrapping Internal section of canal i.e. Bed & Slope & Bank Top with silt upto 5 cm. i/c all cost of all labour, T&P etc complete. as directed by engineer-in-charge. | 27,745 | sqm | - | - |
| 4 | Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete | 64.13 | cum | - | - |
| 5 | Providing and Laying cement concrete A20,M10 (1 Cement : 3 Coarse sand: 6 graded stone aggregate) in foundation or flooring including all cost of material, labour, T&P etc complete as required for proper completion of work. | 11.25 | cum | - | - |
| 6 | Providing and Fixing steel reinforcement Fe-550 (TATA/ SAIL/ RINL/ JINDAL) including all cost of steel, binding wire, chairs, spacers etc for R.C.C. including bending, binding and placing in position with all cost of labour, T&P etc complete. As per specifications and direction of E/I. | 0.9 | MT | - | - |
| 7 | Providing Centering & Shuttering for R.C.C. work with all cost of material, labour & T.& P. etc. complete. | 360 | sqm | - | - |
| 8 | Providing and Laying RCC A20,M20 (1 Cement : 1.5 Coarse sand: 3 graded stone aggregate) in foundation or slab or column or beam or wall including all cost of material, labour, T&P etc complete as required for proper completion of work. | 85.5 | cum | - | - |
| 9 | Painting with synthetic enamel paint of approved brand & manufacture of required colour to give an even shade in two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. | 232.5 | sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.32 MB
BOQ_2215994.xls
BOQ • 0.25 MB
TDUpload.pdf
Tender Documents • 6.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .