| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC | ₹5.4 Cr | L1 | Accepted-AOC AOC LATTER |
| 2 | L2₹5.4 Cr+₹6.5 L (1.21%)Rejected-Finance | ₹5.4 Cr+₹6.5 L (1.21%) | L2 | Rejected-Finance REJECTED TO DUE TO L1 |
Tender Value
Refer Docs
EMD Value
₹10.7 L
Closing Date
16 Feb 2021, 12:00 pmClosed
SE Lucknow Circle PWD Lucknow
SE Lucknow Circle PWD Lucknow
CONSTRUCTION OF HARDASPUR BRIDGE OF RAEBARELI MAHARAJGANJ ROAD TO GUNAWER BRIDGE OF HARCHANDPUR MAHARAJGANJ ON SARDA NAHAR PATARI IN DISTT RAEBARELI
2021_CEUCZ_542627_1
7538/401C-LKOCIR/2020-21 DATED 21.12.2020
Open Tender
Civil Works
Item Rate
180 days
RAEBARELI
CONSTRUCTION OF HARDASPUR BRIDGE OF RAEBARELI MAHARAJGANJ ROAD TO GUNAWER BRIDGE OF HARCHANDPUR MAHARAJGANJ ON SARDA NAHAR PATARI IN DISTT RAEBARELI
2 documents required · 2 mandatory
₹2,360
₹10.7 L
Yes
SE Lucknow Circle PWD Lucknow
22 Mar 2021
2 Jan 2021
17 Feb 2021
2 Jan 2021
16 Feb 2021
2 Jan 2021
8 Jan 2021
Amount
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m,Transporting to site,spreading,grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5.
Providing, laying and spreading approved stone aggregate,[53-9.5 mm@50%,9.5-2.36 @ 20% & 2.36 mm and below @28%] on a prepared sub grade,adding Cement(OPC)@ 2% by weight to the spread material manually mixing in place with rotavator and compacting with road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Sub-base.
Providing, laying and spreading approved stone agreegate,[45-22.4 mm@30%,22.4-2.36 @ 40% & 2.36-75micron@26%] on a prepared sub base,adding Cement(OPC)@ 4% by weight to the spread material manually mixing in place with rotavator and compacting with road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Base.
Construction of shoulder with approved material obtained from borrow pits with a lift upto 1.5 m,Transporting to site,spreading,grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5.
Providing and applying tack coat with Bitumen V.G._10 using Bitumin pressure distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom .
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm @ 1.80 cum/100 Sqm and 11.2mm @ 0.90cum/100 sqm Stone aggregates using bitumen VG-10 @ 1.46 kg/sqm required line ,grade and level on a previously prepared base including mixing in a departmental H.M.p Located on Bachhrawan-Maharajganj road km-5 in Distt. raebareli,laying and rolling with a three wheel 8-10 Tonne capacity finished to Surface , cost of labour at H.M.P & site and stone grit but excluding cost of bitumen, hire and fuel of H.M.P 7 allied machinary required for proper completion of work (Material for premix will be collected at Dept. H.M.P) As per MORD Technical Specification Clause 508.( Rate excluding cost of Bitumen )
Providing and laying seal coat Type 'C' with 6.70 mm grit @ 0.90 Cum/ 100 Sqm. sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall including cleaning existing painted surface, cost of all material, labour at site & plant and T&P etc. but excluding cost of bitumen, roller & machinery etc. required for the proper completion of the work.(material will be dumped at H.M.P, Thulendi) ( Rate excluding cost of Bitumen )
SHAKUNTALA SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .