| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.3 L+₹4,864.87 (0.52%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹9.4 L
EMD Value
₹10,000
Closing Date
7 Mar 2023, 3:00 pmClosed
Additional Collector (Dev)
DRDA, VPM
Construction of Two Wheeler Shed at DRDA Building in Viluppuram TNVPM/DRDA/04
2023_RDTN_289579_1
TNVPM/DRDA/04
Open Tender
Civil Works
Works
120 days
Vluppuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
Yes
10 Mar 2025
18 Feb 2023
7 Mar 2023
18 Feb 2023
7 Mar 2023
18 Feb 2023
Amount
Construction of Two Wheeler Shed in DRDA campus
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling in Basement with M. Sand in layers not more than 15 cm thick , well ramed and consolidated complying with standard specification
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supplying and erecting water tight steel shuttering to centering including necessary supports for plane surface in Plinth beams, using suitable mild steel sheets etc., complete.
For Grade Beam
For Column
Supplying, fabricating and placing in position M.S. or R.T.S. reinforcement grill for RCC works as per the design given including cost of steel and binding wire etc., complete complying with standard specification. (The contractor will have to make his own arrangements for the supply of M.S. plain rods / RTS rods and binding wire)
Reinforced Cement Concrete of mix 1:11/2:3 (One cement, one and half sand and three aggregate) with water proofing compound of 2% by weight of cement used and using 20mm size machine crushed granite stone jelly etc., complete.
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 8 3/4 x 4 1/4 x 2 3/4 and M.Sand inc luding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Plastering cm 1;5 -12mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete.
Spl. Plastering cm 1;3 -20mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete.
Supply and fixing colour galvanised sheet roof PUF sheet of 0.47mm thick and riming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers
Supply and fixing in position best approved quality of Cast Iron Pipe of including cost and conveyance and all other labour charges etc
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of Primer paint including cost of all materials and labour charges etc complete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
TAP Jayakeerthi
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .