Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹35.8 LAccepted-AOC SOUTH WEST DELHI 110046 INDIA UDYAM DL 10 0017623 | NEW DELHI | DELHI | 110046 | ₹35.8 L | 1 | Accepted-AOC Contract Awarded to L1 Bidder Ms Sheetal Dotline Communication Systems Pvt. Ltd. |
| 2 | 2₹36.0 LRejected-AOC | ₹36.0 L | 2 | Rejected-AOC L2 Bidder |
| 3 | 3₹39.6 LRejected-AOC | ₹39.6 L | 3 | Rejected-AOC L3 Bidder |
| 4 | 4₹43.9 LRejected-AOC | ₹43.9 L | 4 | Rejected-AOC L4 Bidder |
| 5 | 5₹1.2 CrRejected-AOC | ₹1.2 Cr | 5 | Rejected-AOC L5 Bidder |
| Sl No | Description | Qty | Unit | Sheetal Dotline Communication Systems PVT LTD | ABDUL RASHID MIR | manvi traders | M/S RANJIT KUMAR DASH | ALHADIN CONSTRUCTION |
|---|---|---|---|---|---|---|---|---|
| 1.00E-Tender for SLA based comprehensive maintenance of Optical Fiber Cable and associated works in Leh BA of J&K Circle. | ||||||||
| 1.01 | UG OFC based route maintenance work (SLA) including route-patrolling, jointing of all the fibres of interrupted cable, if required inserting additional cable between two ends (preferably by doing underground and in extreme case by overhead). End to end optical power budget has to be kept within limit, for the same, if required, damaged/lossy section of OF cable has to be replaced by new cable.
All material (except BSNL Supply i.e. PLB, OFC, SJC/BJC) and labour should be supplied by the bidder including operating tools/instruments. Transportation of these materials and laying ofOF cable is the responsibility of the bidder. | 381.26 | Kms | 33,55,088 ₹39.6 L | 36,98,222 ₹43.6 L | 34,31,340 ₹40.5 L | 40,98,545 ₹48.4 L | 1,14,37,800 ₹1.3 Cr |
| 1.02 | ADSS/OH OFC based route maintenance work (SLA) including route-patrolling, jointing of all the fibres of interrupted cable, if required inserting additional cable between two ends, Straightening of Poles/tightening of stay rods if required. End to end optical power budget has to be kept within limit, for the same, if required, damaged/lossy section of OF cable has to be replaced by new cable.
All material (except BSNL Supply i.e. PLB, OFC, SJC/BJC) and labour should be supplied by the bidder including operating tools/instruments and. Transportation of these materials and laying of OF cable is the responsibility of the bidder. | 91.5 | Kms | 2,28,750 ₹2.7 L | 2,66,265 ₹3.1 L | 1,64,700 ₹1.9 L | 2,95,087.5 ₹3.5 L | 9,15,000 ₹10.8 L |
Tender Value
₹40.9 L
EMD Value
₹1.0 L
Closing Date
14 Aug 2025, 5:30 pmClosed
CGMT BSNL JK Circle
BSNL Bhawan Trikuta Nagar Jammu
SLA Based Comprehensive Maintenance of Optical Fiber cable and its associated work in Leh BA of J andK Telecom Circle
2025_BSNL_242412_1
JTMM/OFC SLA/2025/Leh BA
Open Tender
OFC Laying Works
365 days
Leh BA
As per Tender Document
2 documents required · 2 mandatory
₹590
Yes
AO Cash O/o CGMT BSNL J and K Circle
₹1.0 L
Yes
26 Feb 2026
25 Jul 2025
18 Aug 2025
25 Jul 2025
14 Aug 2025
25 Jul 2025
25 Jul 2025 - 31 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid