| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAccepted-AOC | ₹4.9 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹5.1 Cr+₹24.7 L (5.05%)Rejected-AOC | ₹5.1 Cr+₹24.7 L (5.05%) | L2 | Rejected-AOC Reject |
Tender Value
₹5.0 Cr
EMD Value
₹5.0 L
Closing Date
30 May 2025, 3:00 pmClosed
The Executive Officer
Town Panchayat Office, Markayankottai, Theni Dist
KNMT SCHEME -2025-2026-REJUVENATION OF WATER BODIES AT SENGULAM TANK, WARD NO.-8 SF NO.953, 954 IN MARKAYANKOTTAI TOWN PANCHAYAT IN THENI DISTRICT
2025_DTP_559402_1
08/2025
Open Tender
Civil Works
Works
180 days
Markayankottai Town Panchayat Office Limit
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5.0 L
Town Panchayat Office, Markayankottai, Theni Dist
27 Jun 2025
19 May 2025
30 May 2025
19 May 2025
30 May 2025
20 May 2025
19 May 2025
Amount
Clearing Light Jungle including cost and conveynce of all materials to site and labour charges .comlete as per standart specification W-0003
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete W-0085
Conveyance of Materials by Road in Plains(Conveyance of Materials on Cart Track,allow 20% extra over the above rate excluding loading and unloading charges) (11.79 X 3 = 35.37 ) C-0047
Add to ralevant T.N.D.S.S No: 20.A, Rates for new tank bunds and clossing breches for extra watering and consolidation. By Power Roller including Hire charges W-0070
Earth work deploying earth moving Machinery for Desiliting channel and forming boundon either side and depositing on earth on banks including Jundgle clearance etc. complete. W-0088 Having upto 3-8m
Earth work Excavation in all classes of soils excepthard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials tools equipments and all incidental charges and sheeting shoring and bracing and their subsquent removal of logs stumps and other deletrious matter and obstrutions trimming of bottom of excavation back filling clearing up the site and disposal of all surplus materials etc, complete as per staandared specification for foundation
Plain Cement Concrete 1:4:8 (one cement, four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Above Sill
Plain Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Provision for GST 18%
M/s PRS Construction (BID ID -1350810)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .