| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAdmitted-Finance | ₹16.2 L | L1 | Admitted-Finance |
| 2 | L2₹16.6 LAdmitted-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹16.6 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SWAPAN KUMAR AKHULI L2 | JAMAL AND MALEK COMPANY L1 |
|---|---|---|---|---|---|
| 1.00Part A: Installation of 1000mm complete belt conveyor for a length of 90 metre at Panel 7A | |||||
| 1.01 | Transportation of one 6.6KV VCB, DOL HT Starter from surface to 12XR/16L after loading it on MUV then unloading and placing manually on platform | 1 | WORK | 22,627 ₹22,627 | 22,458.93 ₹22,458.93 |
| 1.02 | Transportation of 250 mtr., 6.6 KV grade 120 Sq.mm armoured cable from surface to CM panel with the help of MUV and laying and hanging it at underground | 1 | WORK | 47,454 ₹47,454 | 47,101.11 ₹47,101.11 |
| 1.03 | Transportation and installation of drive head complete with drive drum, driven drum, gear box, motor, couplings, bearing blocks, fencing etc. to CM panel with the help of MUV | 1 | WORK | 1,06,078 ₹1.1 L | 1,05,288.3 ₹1.1 L |
| 1.04 | Transportation and installation of discharge unit complete with cleaner at CM panel with the help of MUV | 1 | WORK | 54,754 ₹54,754 | 54,346.23 ₹54,346.23 |
| 1.05 | Transportation and installation of loop take-up unit complete with fencing at CM panel with the help of MUV | 1 | WORK | 53,635 ₹53,635 | 53,236.47 ₹53,236.47 |
| 1.06 | Transportation and installation of tail-end unit complete at CM panel 7A with the help of MUV | 1 | WORK | 24,612 ₹24,612 | 24,429.81 ₹24,429.81 |
| 1.07 | Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1000 mm structures is 0.085 T/mtr.) | 1 | WORK | 1,49,751 ₹1.5 L | 1,48,636.4 ₹1.5 L |
| 1.08 | Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop) | 1 | WORK | 32,989 ₹32,989 | 32,743.6 ₹32,743.60 |
| 1.09 | Laying of sequence cable (100 mtr.), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull cord switches and communication devices along the belt | 1 | WORK | 10,448 ₹10,448 | 10,370.47 ₹10,370.47 |
Updated dates
Tender Value
₹16.2 L
EMD Value
₹20,300
Closing Date
7 Feb 2026, 11:00 amClosed
Area Engineer EnM
Office of the General Manager, Jhanjra Area, ECL
Transportation, Installation, Commissioning, Necessary Fabrication and Trial run including Civil work of one 1000 mm width 2x150KW, 6.6KV PVC Belt Conveyor for a length of 90 mtr. in Panel 7A along 12XR/15L with heightening and further installation o
2026_ECL_351679_1
ECL/GM/JNR/EnM/A2/25-26/112 dated 16.01.2026
Open Tender
Miscellaneous Works
60 days
Jhanjra UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,300
17 Feb 2026
22 Jan 2026
9 Feb 2026
22 Jan 2026
7 Feb 2026
23 Jan 2026
22 Jan 2026 - 29 Jan 2026
Part A: Installation of 1000mm complete belt conveyor for a length of 90 metre at Panel 7A
Transportation of one 6.6KV VCB, DOL HT Starter from surface to 12XR/16L after loading it on MUV then unloading and placing manually on platform
Transportation of 250 mtr., 6.6 KV grade 120 Sq.mm armoured cable from surface to CM panel with the help of MUV and laying and hanging it at underground
Transportation and installation of drive head complete with drive drum, driven drum, gear box, motor, couplings, bearing blocks, fencing etc. to CM panel with the help of MUV
Transportation and installation of discharge unit complete with cleaner at CM panel with the help of MUV
Transportation and installation of loop take-up unit complete with fencing at CM panel with the help of MUV
Transportation and installation of tail-end unit complete at CM panel 7A with the help of MUV
Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1000 mm structures is 0.085 T/mtr.)
Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop)
Laying of sequence cable (100 mtr.), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull cord switches and communication devices along the belt
Supply of M.S. Nut & Bolt 5/8"
Supply of G.I. wire 8 SWG (for signalling system)
Supply of Bobbin insulator. Considering 2 nos. in 9 mtr
Supply of Oxygen cylinder (7.1 cu.m./cylinder)
Supply of DA cylinder (6.2 cu.m / cylinder)
M.S. Nut & Bolt 3/8" × 3" with washer (for signalling system).
Part B: Installation of one 1000mm wide PVC belt conveyor for a length of 300 mtr. in R-V seam, Panel 7A at MIC, Jhanjra Project Colliery.
Transportation and installation of 300 mtr. of belt structure, after loading it on MUV from surface (weight of 1000 mm structures is 0.085 MT/mtr.)
Transporting, laying, lapping & jointing of 600 mtr. of belting
Shifting and installation of tail end for every shifting (wt = 0.945 × 9 Te = 8.505 Te)
Installation of pull cord, signalling and lock-out devices
Supply of M.S. Nut & Bolt (M16×40)
Supply of G.I. wire 8 SWG
Supply of Bobbin insulator
Supply of M.S. Nut & Bolt (3/8" × 3") with washer
Part C: Heightening of Belt Conveyor(20pairs structure) at Panel 7A in RV seam including necessary fabrication jobs and required alignment at MIC,JPC.
Heightening of Belt Conveyor (20 nos. pair structure) including 12XR in RV seam, including necessary fabrication jobs and required alignment at MIC, JPC
Supply of M.S. full threaded Bolt & Nut full threaded 5/8" × 2"
Supply of Oxygen cylinder (7.1 cu.m / cylinder)
Supply of DA cylinder (6.2 cu.m / cylinder)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_364437.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid