Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹185.2 CrAccepted-AOC A 760 SUSHANT LOK PHASE 1 GURGAON 122002 HARYANA INDIA | ₹185.2 Cr | L1 | Accepted-AOC agreement Signed |
| 2 | Not L1₹197.8 CrRejected-Finance C 21 SUSHANT LOK III SECTOR 57 GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹197.8 Cr | Not L1 | Rejected-Finance Not L1 |
| 3 | Not L1₹201.7 CrRejected-Finance 592 WELCOME TOWER MODI COLLEGE ROAD DADABARI EXTN KOTA RAJASTHAN | KOTA | RAJASTHAN | 324001 | ₹201.7 Cr | Not L1 | Rejected-Finance Not L1 |
| 4 | Not L1₹205.5 CrRejected-Finance 1 513 VIDHYADHAR NAGAR JAIPUR 302039 RAJASTHAN | JAIPUR | RAJASTHAN | 302039 | ₹205.5 Cr | Not L1 | Rejected-Finance Not L1 |
| 5 | Not L1₹206.1 CrRejected-Finance C 20A METAL COLONY AMBABARI JAIPUR DIST JAIPUR RAJSTHAN PIN 302023 | JAIPUR | RAJASTHAN | 302023 | ₹206.1 Cr | Not L1 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | JAINCO ENTERPRISES PVT LTD L3 | R K JAIN INFRA PROJECTS PVT LTD L2 | VVC REALINFRA PVT LTD L9 | COMT CONSTRUCTIONS PVT LTD L1 | MEHTA CONSTRUCTION CO. L6 | LNA INFRAPROJECTS PVT LTD L4 | PREETI BUILDCON PVT LTD L7 | KCC INFRA PVT LTD L5 | Shivansh Construction L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Upgradation of Package No. 4: Guna - Fatehgarh - Paron Road (SH-54) to two lane with paved shoulder configuration on EPC Mode under proposed NDB Loan. | 1 | Nos | 2,01,70,00,000 ₹201.7 Cr | 1,97,81,00,000 ₹197.8 Cr | 2,27,82,38,383 ₹227.8 Cr | 1,85,21,00,000 ₹185.2 Cr | 2,08,36,87,000 ₹208.4 Cr | 2,05,48,43,000 ₹205.5 Cr | 2,18,81,20,000 ₹218.8 Cr | 2,06,10,59,850 ₹206.1 Cr | 2,26,76,88,000 ₹226.8 Cr |
Tender Value
₹248.7 Cr
EMD Value
₹2.5 Cr
Closing Date
25 Jul 2024, 3:30 pmClosed
Chief ENgineer (Procu)
MPRDC Bhopal
Upgradation of State Highways under Package No. 4 on EPC mode under Proposed NDB Loan
2024_MPRDC_344181_4
644
Open Tender
Civil Works - Highways
730 days
Guna
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹2.5 Cr
MPRDC Bhopal
26 Dec 2025
12 Mar 2024
26 Jul 2024
12 Mar 2024
25 Jul 2024
8 Apr 2024
12 Mar 2024 - 20 Mar 2024
20 Mar 2024
Amount
Upgradation of Package No. 4: Guna - Fatehgarh - Paron Road (SH-54) to two lane with paved shoulder configuration on EPC Mode under proposed NDB Loan.
R K JAIN INFRA PROJECTS PVT LTD (BID ID -1058055)
JAINCO ENTERPRISES PVT LTD (BID ID -1037300)
LNA INFRAPROJECTS PVT LTD (BID ID -1059116)
KCC INFRA PVT LTD (BID ID -1058990)
MEHTA CONSTRUCTION CO. (BID ID -1037183)
PREETI BUILDCON PVT LTD (BID ID -1063593)
Shivansh Construction (BID ID -1043745)
VVC REALINFRA PVT LTD (BID ID -1058627)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid