Loading…
Loading…
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
9 Jul 2026, 3:00 pm
Asansol Division - Replacement of rusty cantilever assembly
TRD-WC-T-2026-27-12
TRD-WC-T-2026-27-12
Open
12 Months
Paschim Bardhaman, West Bengal
₹0
₹4.4 L
3 Jun 2026
3 Jun 2026
25 Jun 2026
A-Asansol Division-Replacement of rusty cantilever assembly
Item Breakup - A-Asansol Division-Replacement of rusty cantilever assembly
Supply of Small parts steel other than mast MT including Drop arm, Dwarf mast, gantry mast, Super mast etc
Supply of Cantilever assembly without insulator Numbers 738.00 Total 11030388.51 Item- 2 Insulator: S No. Item Description of Item Unit Qty Rate Amount No
Supply of Porcelain Stay arm insulator (1050mm Numbers 738.00 CD).
Supply of Porcelain bracket insulator (1050mm Numbers 738.00 CD) ASANSOL DIVISION-ELECTRICAL/EASTERN RLY
Supply of Porcelain 9 Tone insulator (1050mm Numbers 30.00 CD) Total 8994330.24 Item- 3 Labour: S No. Item Description of Item Unit Qty Rate Amount No
Erection under Power Block of Small parts steel MT other than mast including Drop arm, Dwarf mast, gantry mast, super mast etc.
Erection of Cantilever assembly with insulator Numbers 738.00 under Power Block
Dismantling of old Cantilever assembly & load Numbers 738.00 shifting at new Cantilever assly. under Power Block including transportation to store Total 1830531.33
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CheckList.pdf
ATTACHMENT
Commercial-Compliance-IV-V-VI-VII-VIII.pdf
ATTACHMENT
Technical-Compliance-I-II-III.pdf
ATTACHMENT
GCC-April2022.pdf
ATTACHMENT
GCC Advanced Correction Slip No 1
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.2.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.3.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.4.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.5.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.6.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.7.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.8.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.1_compressed.pdf
ATTACHMENT
AdvancedcorrectionslipsNo.9.pdf
ATTACHMENT
AdvancedcorrectionslipsNo-10.pdf
ATTACHMENT
AdvancedCorrectionSlip-11_compressed.pdf
ATTACHMENT
AnnexureVV-Alatest.pdf
ATTACHMENT
Newsimilarnatureofworks.pdf
ATTACHMENT
Specification.pdf
ATTACHMENT
TenderBooklet.pdf
ATTACHMENT
Download all tender documents and submit your bid