Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 CrAccepted-AOC KUKUHAWA POST GAURABADSHAHPUR JANPAD JAUNPUR | ₹9.6 Cr | L1 | Accepted-AOC Due to L1 Awarded Value Rs. 96217036.00 With Taxs |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹22.4 L
Closing Date
9 Jan 2025, 3:00 pmClosed
S.E IRRIGATION WORK CIRCLE, MIRZAPUR
S.E IRRGATION WORK CIRCLE,IRRIGATION COLONY FATHA MIRZAPUR 231001
Rehabilitation and Improvement of Sirsi Dam in Mirzapur district of Uttar Pradesh under DRIP-II
2024_UPIDC_978853_1
06/SE/2024-25
Open Tender
Civil Works
Item Wise
450 days
SIRSI DAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EXECUTIVE ENGINEER,SIRSI DAM DIVISION, MIRZAPUR
₹22.4 L
Yes
OFFICE OF S.E IRRGATION WORK CIRCLE, MIRZAPUR
13 Jun 2025
2 Dec 2024
9 Jan 2025
2 Dec 2024
9 Jan 2025
2 Dec 2024
19 Dec 2024
Amount
REHABLITATION WORK
Ordinary Jungle Clearence on D/S Slope & U/P Stream Slope of Sirsi Dam Including Cost of all Labour ,T&P etc. and including lift upto 1.5 meter and lead upto 30 meter . Required for Proper Completion Work
E/work in Execavation Including Cost of all Labour, T&P etc. and including lift upto 1.5 meter and lead upto 30 meter. Required for Proper Completion Work.
E/W in Filling for Disturbed Dam Profile on U/S & D/S Slope of Sirsi Dam Including Cost of all Labour ,T&P etc. and including lift upto 1.5 meter and lead upto 2 K.m . Required for Proper Completion Work .
Dismentaling old & Damadge Boulder Pitching on U/S Slope of Sirsi Dam Including Cost of all Labour ,T&P etc. and including lift upto 1.5 meter and lead upto 30 meter . Required for Proper Completion Work .
Providing & Laying P.C.C -(1:3:6) For Rain Chute & Steps on U/S & D/S Slope of Dam including Cost of Material ,Labour ,T&P etc. Required For Proper Completion of Work .
C.R Stone Masonary (1:3) For Sleeper on U/S Slpoe of Dam inclding Cost of Material ,Labour ,T&P etc. Required For Proper Completion of Work .
12 mm Thick Cement Plaster (1.3) on C.R. Stone Masonary For Rain Chutes including Cost of Material ,Labour ,T&P etc. Required For Proper Completion of Work .
Supply & Laying Stone Kattal on U/S Slope of Sirsi Dam as a Filter Material Including Cost of all Labour ,T&P etc. Required for Proper Completion Work
Relaying Stone Kattal on U/S Slope of Sirsi Dam as a Filter Material Including Cost of all Labour ,T&P etc. Required for Proper Completion Work
Relaying Boulder Pitching on U/S Slope of Sirsi Dam Including Cost of all Labour ,T&P etc. Required for Proper Completion Work
Supply & Laying Boulder Pitching up to 20 kg Including Cost of all Labour ,T&P etc. Required for Proper Completion Work
Dismantling stone work in cement mortor including all cost of labour, material and T&P etc with all lead, lifts, stacking and all taxes etc. Required for proper completion of work.
Making daula with proper dressing. on Top of Dam inclding Cost of Labour ,T&P etc. Required For Proper Completion of Work .
Deep struck Cement pointing in 1:2 Cement mortor on stone masonary including all cost of labours materials, and T&P etc . required for proper completion of work.
Turfing with doob grass on D/S Slope of Sirsi Dam including Cast of all Material , Labour ,t&p ,watering etc. Required For Proper Completion of Work
Excavating other rocks/by other than blasting including all cost of labour, materials and T&P etc. with all leads, lifts. required for proper Disposel.
Cutting, Bending, Binding and placing bars including all cost of labour material and T&P etc with all leads, lifts and all taxes etc. required for proper completion of work.
R.C.C. 1:1:2 (M-25) with Cement Coarse sand of FM Not less than 2.00 and crushed hard stone grit For Apron including cost of all material, Labour, T&P etc. required for proper completion of work but excluding cost of reinforcement Centering and shuttering in costrucion of different part of structures.
Supply & Laying Joint Filler Board in Construction Joint including all cost of labour material and T&P etc with all leads, lifts and all taxes etc. required for proper completion of work.
E/W in Cutting of Toe Filter at D/S of Sirsi Dam Including Cost of all Labour ,T&P etc. Required for Proper Completion Work .
Supply & Laying Coarse Sand in Toe Filter of Sirsi Dam inclding Cost of Material ,Labour ,T&P etc. Required For Proper Completion of Work .
Supply & Laying Stone Grit 10mm to 20mm Size in Toe Filter of Sirsi Dam inclding Cost of Material ,Labour ,T&P etc. Required For Proper Completion of Work .
Supply & Laying Stone Ballast 25mm to 50 mm Size in Toe Filter of Sirsi Dam inclding Cost of Material ,Labour ,T&P etc. Required For Proper Completion of Work .
Supply & Laying 300 MM Dia R.C.C. Hume Pipe For Water Drain including all cost of labours materials, and T&P etc . required for proper completion of work.
Centering & Shuttering For c.c/R.c.c Work including Rent Shuttering Material , Labour and T&P required for Proper Complition of Work
RCC work (1:1.5:3) excluding supply of reinforcement and its binding but including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost.
Fabrication of Mild steel/iron work railing, Door frames including cutting, drilling, welding/revetting & hinges, where necessary and fixing in position including cost of all material, labour, T&P etc. required for proper completion of work with one coat of red oxide primer.
Transportation of Drilling equipment from place of location to work site and from work site to place of location including loading, unloading all complete job.
Wet Percussion Drilling up to 75 mm dia holes in open space for Grouting.in rockey surface i/c flusing and routine washing of holes upto 30 minutes.
Special Washing of Holes i/c Cleaning Flushing and all related incidental work etc. complete in all Respect.
Grouting up to 75 mm Dia Holes with Cement Grout mixed at required Pressure , i/c cost of all material, labour , T&P ,Maintenance etc
Conducting Percolation Test in the drill holes at the desired pressure i/c water supply arrangement and necessary accessories etc.
R.R. Stone masonry in 1:3 including all cost of labour, material and T&P etc. with carriage of material all leads, lifts . required for proper completion of work.
Renovation of IH & Colony campus
Providing and Laying RCC-1:1.5:3 With Hard drawn Wire mesh & Water proofing material on top of roof I/C cost of all matenal labour T & P etc required for proper completion of work.
Supply and laying of 80 mm thick I shaped Mechanically compressed inter locking cement concrete pavers block I/C cost of all material labour T & P etc required for proper completion of work.
Providing wood work in frames of doors, windows framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length
Providing and fixing panelled or panelled and glazed shutters for doors,windows and clerestory windows, fixing with butt hinges of required size with necessary screws, as per direction of Engineer-in-charge.
Providing & Fixing vitrifield tile 600 x 600 mm 9 mm thick(Light) Shade somany/kajaria /jonson/orient make , fixed fine sand 1:3 cement:sand i/c cost of material ,labour etc
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work
Distempering two coat of oil bound distemper make of burber , jention , & nicholcsen , shalimar , Asian , Nerolac , over one priming coat including cost of all material ,labour, T&P etc. Required for proper complition of work.
P/F of E Board 6mm thick tiles 600×600 mm false ceiling on frame work I/C cost of all matenal labour T & P etc required for proper completion of work.
Taken Electrification and Plumbering Work
Supply and laying of 16 sq mm 02 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade at a depth of 750 mm beloground levelover a cushionof 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in allrespect. The armouring of the cable shall be properly connected with theearth conductor by clamps etc.
Supply and fixing of factory wired as symetrical beamed integral flood light luminaire swith die cast aluminium housing & Al. reflector having built in control gear unitduly pre wired plate complete with ballast,ignitor,capacitor for 70 watt M.H. withlamp complete in allrespect.
Wring Point for light with 1 sq.mm. FR PVC insulated multistrand single core copper conductor cable in 2mm thick PVC conduit pipe concealed in the wall complete with 1.5 sq.mm. earth wire drawn inside the conduit & piano type switch, ceiling rose on 3mm thick phenolic laminated backlite- sheet etc. complete in all respects.
Wring Point for Fan with 1 sq.mm. FR PVC insulated multistrand single core copper conductor cable in 2mm thick PVC conduit pipe concealed in the wall complete with 1.5 sq.mm. earth wire drawn inside the conduit & piano type switch, ceiling rose on 3mm thick phenolic laminated backlite- sheet etc. complete in all respects.
Wring Point for plug with 1 sq.mm. FR PVC insulated multistrand single core copper conductor cable in 2mm thick PVC conduit pipe concealed in the wall complete with 1.5 sq.mm. earth wire drawn inside the conduit & piano type switch & 5 Pin Socket on 3mm thick phenolic laminated backlite- sheet etc. complete in all respects.
Drilling and boring 160 mm dia by D.T.H. machine for construction of deep bore tube well
Providing and fixing CPVC pipe complete with such as bends, tee, socket cross, clamps, earth work including filling the trenches etc. required for proper completion of the work. The rate also includes concealed PVC. fitting, where required, cutting and making, good the walls etc. and materials, labour, T&P etc. complete. (Internal work) 25MM
Supply and fixing brass bib cock heavy quality 15 mm. dia. (400 gms.) ISI marked including supply of all materials, labour and T&P etc. required for proper completion of work.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .