| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹55.2 LAccepted-Finance KUTCHERY ROAD ABADGANJ DALTONGANJ PALAMU 822101 | PALAMU | JHARKHAND | 822101 | ₹55.2 L | L-1 | Accepted-Finance 0.53 Percent Below |
| 2 | L-2₹55.4 LAccepted-Finance | ₹55.4 L | L-2 | Accepted-Finance 0.25 Percent Below |
Tender Value
₹55.5 L
EMD Value
₹1.1 L
Closing Date
12 May 2026, 5:00 pmClosed
District Engineer Zila Parishad Palamu
Office Zila Parishad Palamu
Construction of Health Sub Center CHAERAI 2 in Vill CHAERAI 2, GP CHAERAI 2, Block NAUDIHA BAJAAR, District PALAMU under Zila Parishad, Palamu.
2026_ZPPAL_113519_1
NIT-24/2025-26 Gr 10 RT
Open Tender
Civil Works
270 days
PALAMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
26 May 2026
4 May 2026
14 May 2026
4 May 2026
12 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Eartwork in excavation in foundation trenches in hard soil (vide classification of soil item-A) and disposal of excavation earth as obtained to a distace up to 50m including all lifts levlling ramming the foundation trenches removing roots trees surbs all complete as per approved designed Building specification and direction of E/I | - | M3 | 151.82 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/I. | - | M3 | 15.51 | - | BI01010001010000000000000515BI0100001114 |
| 3 | filling in Foundation trenches and plinth in layers not exceeding 150mm thick well watered , rammed , fully fully compacted and fine dressed with earth obtained from excavation of foiundation trenches within a lead of 50M and lifts of 1.5m all complete as per building specification and direction of E/I. | 50.83 | M3 | 55.28 | ₹2,809.88 | BI01010001010000000000000515BI0100001115 |
| 4 | Proving coarse clean sand in fillig in foundation trenches or in plinth includding ramming and watering in layes not exceeding 150mm thickwith all leads and lifts including cost of all materials, labours, royalty and taxes all complete as per approved designed Building specification and direction of E/I ( mode of Measurement of compacted volume). | 12.94 | M3 | 589.51 | ₹7,628.26 | BI01010001010000000000000515BI0100001116 |
| 5 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | - | M2 | 330.34 | - | BI01010001010000000000000515BI0100001117 |
| 6 | 1:4:8 (1 cement :4 Coarse sand ( zone-III ) :8 grade stone aggregate 40mm nominal size ) | 13.49 | M3 | 3,751.64 | ₹50,609.62 | BI01010001010000000000000515BI0100001118 |
| 7 | Providing and laying in position specified grade of reinforcement cement concrete of excluding the cost of centring and shuttering, finishing and reinforcement - all work upto plinth level
1:1.5:3 (1 cement :1.5 Coarse sand ( zone-III ) : 3 grade stone aggregate 20mm nominal size ) | - | M3 | 5,218 | - | BI01010001010000000000000515BI0100001119 |
| 8 | Reinforcement cement concrete work in walls (any thickness), including attached pilasters, buttersses, plinth and string cource, filleets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 Cement : 1.5 Coarce sand (zone-III) : 3 Graded stone aggregate 20 mm nominal size) | - | M3 | 6,082.45 | - | BI01010001010000000000000515BI0100001120 |
| 9 | Reinforcement cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircase and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 Cement : 1.5 Coarce sand (zone-III) : 3 Graded stone aggregate 20 mm nominal size) | - | M3 | 6,308.87 | - | BI01010001010000000000000515BI0100001121 |
| 10 | Providing Tor steel reinforcement as per approved design and drawing including carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position complete as per building specification and direction of E/I.
TMT-500 8mm dia | 1.85 | MT | 83,314.02 | ₹1,54,130.94 | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
SBD2410.pdf
Tender Documents • 1.36 MB
BOQ_153361.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid