Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
14 Jul 2026, 6:00 pm6d left
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_314753_14
2nd TIME e-NIT No. 19 REW UDHAMPUR of 2026-27 Dated 06-07-2026
Open Tender
Civil Works
90 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,920
7 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of sign board | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 14.53 | cum | 479.3 | ₹6,964.23 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 0.55 | cum | 4,826.5 | ₹2,654.58 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. 80% | 7.55 | cum | 5,733.6 | ₹43,288.68 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. 20 % | 1.76 | cum | 937.9 | ₹1,650.7 |
| 6 | Cetring and shuttering including strutting, propping etc and removal of the formwork. foundation, footing | 28.34 | Sqm | 286.35 | ₹8,115.16 |
| 7 | Cetring and shuttering including strutting, propping etc and removal of the formwork under the slab | 6.57 | Sqm | 718.2 | ₹4,718.57 |
| 8 | Cetring and shuttering including strutting, propping etc and removal of the formwor edges of slab | 18.55 | m | 262.2 | ₹4,863.81 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand : 3 graded stone aggregates 20mm nominal size. main slab | 1.34 | cum | 9,821.85 | ₹13,161.28 |
| 10 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 80.4 | Kg | 123.2 | ₹9,905.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1019419.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid