Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC 17 BIPIN GANGULY ROAD KOL 30 | L1 | Accepted-AOC Agency Dutta Enterprise Stood L1 in the Tendering Process. | |
| 2 | L2₹24.8 L+₹5,395.17 (0.22%)Rejected-Finance COLLEGE PARA RAIGANJ UTTAR DIANJPUR PIN 733134 | RAIGANJ | UTTAR DINAJPUR | WEST BENGAL | 733134 | L2 | Rejected-Finance Agency Stood L2 | |
| 3 | L3₹24.9 L+₹19,182.90 (0.78%)Rejected-Finance | L3 | Rejected-Finance Agency Stood L2 |
Tender Value
Refer Docs
EMD Value
₹49,531
Closing Date
31 Mar 2021, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGG (P.W.D), D/DINAJPUR ELEC DIVN
OFFICE OF THE EXECUTIVE ENGINEER (P.W.D), DAKSHIN DINAJPUR ELECTRICAL DIVISION, BALURGHAT Dakshin Dinajpur - 733101
Temporary Election Electrical Works for WBLA 2021 for RAIGANJ P.S
2021_WBPWD_330191_1
WBPWD/EE/DDED/e-NIQ-18/2020-21
Open Tender
ELECTRICAL WORKS ORG
Item Rate
7 days
Raiganj
Please refer tender documents
6 documents required · 6 mandatory
₹49,531
7 Apr 2021
18 Mar 2021
2 Apr 2021
18 Mar 2021
31 Mar 2021
25 Mar 2021
120 days
Amount
Supply & installation on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. providing inter conection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approve materials). Incoming: - (a) 415 Volt, 63/100 Amp, TPNIC Main Switch with HRC Fuse - 1 (one) no. (b) 415 Volt, 63/100 Amp, FP Change Over Switch - 1 (one) no. (c) 415 Volt, 100 Amp, capacity Bus Bar chamber with 4 (four) nos. Cu / Al Bar - 1set. Out going: - (a) 415 Volt, 32 Amp. TPNIC Main Switch with HRC Fuse - 5 nos. (b) RYB indicating lamp - 3 nos.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 66 Nos. X 7 Nos. of Days = 462 Item. )
Supply & providing on hire basis 500V, 32A / way, 6 way PDB with isolator on wooden plank board or suitable angle iron frame incl. providing inter coonection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approve materials).
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty =99 Nos. X 7 Nos. of Days = 693 Nos. )
Supply & installation on hire basis Main Switch with 1.1 KV grade PVC / A Al cable of folllowing sizes incl. laying in tranch / wall with shadding arrangement dismantling the same & mending good the damage at the end of the function (With PWD approve materials).
4 core 16 sq. mm. PVC / A cable.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 3795 Mtr. X 7 Nos. of Days = 26565 Mtr. )
2 core 4 to10 sq. mm. PVC / A cable.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 5115 Mtr. X 7 Nos. of Days = 358055 Mts. )
Supply & drawing on hire basis single core 7 / 0.036 PVC Cu wire incl. dismantling the same at the end of function.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 6600 Mtr. X 7 Nos. of Days = 46200 Mts. )
Distribution wiring in 2 x 3 / 0.036 single core PVC Cu. Wire to light / fan points in alkathine pipe on hire basis & dismantling the same (Without individual control switch).
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 4455 Pts. X 7 Nos. of Days = 31185 Pts. )
Supply & providing on hire basis 60-150 watt LED flood light /250 watt Metal Hallide fitings with necessary clamping arrangemnt to be fixed on ST pole / wall.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 264 Nos. X 7 Nos. of Days = 1848 Nos. )
Supply & providing on hire basis 4 ft, 40 watt Single Tube Light (commercial type)/20 watt LED Tube Light fitings with necessary Tube lamp & replacement of fuse lamp.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 1980 Nos. X 7 Nos. of Days = 13860 Nos. )
Supply & providing on hire basis 200 V AC 1400 mm sweep ceiling fan with down rod as reqd. incl. dismantling the same.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 1650 Nos. X 7 Nos. of Days = 11550 Nos. )
Supply & providing 250V, 600mm Sweep Air Circulator fan & dismantling the same.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 330 Nos. X 7 Nos. of Days = 2310 Nos. )
Supply & providing on hire basis 9/10 watt LED Lamp.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 825 Nos. X 7 Nos. of Days = 5775 Nos. )
Supplying & Providing on hire basis (4 nos.) 5 amp plug point on casing board with earthing attachment. (For Mobile Charger and Stand Fan)
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 990 Pcs. X 7 Nos. of Days = 6930 Pcs. )
Earthing the installation with 50 mm. dia G. I. pipe 2.5 Mtr. to 3 Mtr. long & 6 / 8 SWG G. I. wire with bolts, nuts etc.below the GL on hire basis & dismantling the same.
Up to 3 days
Next 7 Days after 3 Days @ 2% of the rate of first 3 days per day (Qty = 330 Nos. X 7 Nos. of Days = 2310 Nos. )
Hiring and Installation Charges of 2 nos.5 KVA, 1-Phase/3-Phase, 230 Volt/415 Volt, 50 Hz DG for 9 School/Institute for 10 days..( Qty= 2 No. of D.G Set X 33 Nos. of School X 10 Nos. of Days = 660 Nos.)
Transportation charges, incl. loading & unloading of DG set & providing operator for smooth running of the same as per direction of EIC.
Charge of Electrical 1 No. Supervisor for each shift per day for 10 days for 9 School/institute.For DG operation and making fuel log Book and maintenance and operation of the E.I System. ( Qty = 3 Nos. of Shift X 10 Nos. of Days X 33 Nos. School = 990 Shift.)
Fuel consumption for DG Set with during consumption
For 5KVA, 1-φ/3-φ, 230V/415V, 50Hz DG Set @ 2 Ltr./DG/Hr. ( Qty = 10 Nos. of Days X 66 Nos. of D.G X 4 Working Hours = 2640 Hrs.)
N.B.: 1) Rate should be inclusive of all taxes, duties & CESS etc including GST which will not be paid extra (on Item No. 01.00 to 17.00). 2) Bidders are requested to quote Rate for the Items Sl. Nos. 01.01, 02.01, 03.02, 3.05, 04.01, 05.01, 06.01, 07.01, 08.01, 09.01, 10.01, 11.01 & 12.01 as spelt out in the BOQ. The rate for the items Sl. Nos. 01.02, 02.02, 03.03, 3.06, 04.02, 05.02, 06.02, 07.02, 08.02, 09.02, 10.02, 11.02 & 12.02 will be calculated automatically. 3)The bidder will have to quote the fuel rate based on the market rate on the date of bidding. 4) The cost of fuel may be charged depending on the actual cost of fuel during the time of execution of work. Log book to be maintained strictly on daily basis.
DULAL DUTTA
Roy Electric
stage.html
html • 0.05 MB
technical_628522.pdf
PDF • 0.11 MB
techsummary_628522.pdf
PDF • 0.12 MB
finance_628522.pdf
PDF • 0.11 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_628522.pdf
PDF • 3.19 MB
Raiganj-final..pdf
PDF • 3.69 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .