| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAccepted-Finance | ₹44.1 L | L1 | Accepted-Finance The bidder is L1. |
| 2 | L2₹44.2 L+₹15,757.97 (0.36%)Rejected-Finance | ₹44.2 L+₹15,757.97 (0.36%) | L2 | Rejected-Finance The bidder is L2. |
| 3 | L3₹44.7 L+₹60,780.73 (1.38%)Rejected-Finance R O CHECKPORA CHADOORA BUDGAM | BUDGAM | JAMMU AND KASHMIR | 190007 | ₹44.7 L+₹60,780.73 (1.38%) | L3 | Rejected-Finance The bidder is L3. |
Tender Value
₹53.1 L
EMD Value
₹1.1 L
Closing Date
22 Aug 2026, 4:00 pmClosed
Ex. Engineer PMGSY Div. Bandipora
Office of the Ex. Engineer PMGSY Div. Bandipora
Permanent Restoration of Road from Nowgam (L045) to Gundi Nowgam BWO Pavement Work and Shoulders Package No JK03-190 under SASCI.
2026_KSRRD_149158_1
E-NIT No. 08/EE-PMGSY/Bpr-e-Tendering of 2026-27 Dated. 14-08-2026
Open Tender
Civil Works - Roads
Percentage
30 days
Bandipora District
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
₹1.1 L
2 Sept 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
22 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means). including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 1,875 | Sqm | 4.87 | ₹9,131.25 |
| 2 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as
per specifications and directions of Engineer-in-Charge.
16.63.1 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. 16.63.1A 50 to 100 mm average compacted thickness with bitumen of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.. with all leads, lifts, loading, unloading and octori.(Finished work to be measured, complete.) | 65.63 | Cum | 8,086.62 | ₹5,30,724.87 |
| 3 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. 16.38.2 On bitumen surface @ 0.50 Kg/sqm. with all leads, lifts, loading, unloading and octori.(Finished work to be measured, complete.) | 9,843.8 | Sqm | 48.4 | ₹4,76,439.92 |
| 4 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). 16.41.1 With paving Asphalt grade VG-10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt. including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 9,843.8 | Sqm | 250.47 | ₹24,65,576.59 |
| 5 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 9,843.8 | Sqm | 88.91 | ₹8,75,212.26 |
| 6 | Construction of Shoulder: Supplying and Laying of Granular Material (Khakh Bajri) from approved source to site of work to specified thickness, hand picking, and compacting with Roller 8-10 tonne capacity in stages to proper grade and camber, as per directions of engineer in charge. Including all carriages, Lead/Lift, loading/unloading. Finished work to be measured. | 135 | Cum | 1,075.49 | ₹1,45,191.15 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_234681.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_234681.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .