| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-Finance | L1 | Accepted-Finance Quoting Lowest Rate | |
| 2 | L2₹19.9 L+₹9,540 (0.48%)Rejected-Finance NARAN PALLY PURBO BARDHAMAN PIN 713 101 | PURBA BARDHAMAN | WEST BENGAL | 713101 | L2 | Rejected-Finance Quoting Higher Rate | |
| 3 | L3₹19.9 L+₹9,660 (0.49%)Rejected-Finance | L3 | Rejected-Finance Quoting Higher Rate | |
| 4 | L4₹19.9 L+₹9,804 (0.50%)Rejected-Finance | L4 | Rejected-Finance Quoting Higher Rate | |
| 5 | Rejected-Technical 121004 | - | Rejected-Technical Not get proper Documents the bidder has been cancelled |
| Sl No | Description | Qty | Unit | SREE GURU ENGINEERING L2 | ANANTA ELECTRICAL ENGG CONSTRUCTION L4 | HALDAR ENTERPRISE L3 | S.S. ELECTRICAL ENTERPRISE L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Charges for E.I. maintenance of the Kalna S.D. Hospital incl. other Buildings within the premises of Hospital in the Dist. of Purba Bardhaman. Round the Clock. including Holidays. (Reliever for each Category of engaged person viz. |Highly Skilled/ Skilled/ Semi-Skilled/ Un-Skilled must be
provided during weekly off days as per Rules! Regulations/ Guidelines of WB Labour Department and rate should be quoted accordingly.)
The agency has to depute :
1) One no(1) Electrician(Skilled Labour) having i(a),i(b),iv& v Electrical workman permit issused from WB Licensing Board and 2 nos Helper (Un-skilled Labour) , in 1st shift on as per instruction of EIC
2) One no(1) Electrician(Skilled Labour) having i(a),i(b),iv& v Electrical workman permit issused from WB Licensing Board and 1 nos Helper (Un-skilled Labour) , in 2nd shift on as per instruction of EIC
3) One no(1) Electrician(Skilled Labour) having i(a),i(b),iv& v Electrical workman permit issused from WB Licensing Board and 1 nos Helper (Un-skilled Labour) , in 3rd shift on as per instruction of EIC | 12 | Months | - | - | 25 ₹300 Lowest | - |
| 1.01 | (i)Skilled Workman: 01 Man for 12 month[During Shift-A-06:00 to 14:00 or as per direction of EIC].(Having atleast I(a),I(b) , II, IV & V DOE WB) Electrical workman's permit from licencing board): | 12 | Months | 26,295 ₹3,15,540 | 26,297 ₹3,15,564 | 26,290 ₹3,15,480 | 26,150 ₹3,13,800 Lowest |
| 1.02 | ii) Helper (Unskilled): 01 Man for 12 month [During Shift-A-06:00 to 14:00 or as per direction of EIC] Electrical workman's permit from licencing board): | 12 | Months | 21,740 ₹2,60,880 | 21,744 ₹2,60,928 | 21,740 ₹2,60,880 | 21,650 ₹2,59,800 Lowest |
| 1.03 | ii) Helper (Unskilled): 01 Man for 12 month [During Shift-A-06:00 to 14:00 or as per direction of EIC] Electrical workman's permit from licencing board): | 12 | Months | 21,740 ₹2,60,880 | 21,744 ₹2,60,928 | 21,740 ₹2,60,880 | 21,650 ₹2,59,800 Lowest |
| 1.04 | (i)Skilled Workman: 01 Man for 12 month[During Shift-B-14:00 to 22.00 or as per Direction of EIC].(Having atleast I(a),I(b) , II, IV & V DOE WB) Electrical workman's permit from licencing board): | 12 | Months | 26,295 ₹3,15,540 | 26,297 ₹3,15,564 | 26,290 ₹3,15,480 | 26,150 ₹3,13,800 Lowest |
| 1.05 | ii) Helper (Unskilled): 01 Man for 12 month [During Shift-B-14:00 to 22.00 or as per Direction of EIC] Electrical workman's permit from licencing board): | 12 | Months | 21,740 ₹2,60,880 | 21,744 ₹2,60,928 | 21,740 ₹2,60,880 | 21,650 ₹2,59,800 Lowest |
| 1.06 | (i)Skilled Workman: 01 Man for 12 month[During Shift-C-22:00 to 06:00 or as per Direction of EIC].(Having atleast I(a),I(b) , II, IV & V DOE WB) Electrical workman's permit from licencing board): | 12 | Months | 26,295 ₹3,15,540 | 26,297 ₹3,15,564 | 26,290 ₹3,15,480 | 26,150 ₹3,13,800 Lowest |
| 1.07 | ii) Helper (Unskilled): 01 Man for 12 month [During Shift-C-22:00 to 06.00 or as per Direction of EIC] Electrical workman's permit from licencing board): | 12 | Months | 21,740 ₹2,60,880 | 21,744 ₹2,60,928 | 21,740 ₹2,60,880 | 21,650 ₹2,59,800 Lowest |
| 2.00Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible. | |||||||
| 2.01A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets | |||||||
Tender Value
Refer Docs
EMD Value
₹39,808
Closing Date
20 Aug 2026, 11:00 amClosed
Sr.Superintending Engineer
Office of the Sr. Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Yearly maintenance of E.I. of Kalna S.D. Hospital under Kalna Electrical Section, PWD in the dist. of Purba Bardhaman Round the clock for the one year
2026_WBPWD_5018470_1
WBPWD/SSEWEC /BED /NIQ-41 /2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Kalna
Please refer Tender documents.
5 documents required · 5 mandatory
₹39,808
Office of the Sr. Superintending Engineer, Western
31 Aug 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
20 Aug 2026
14 Aug 2026
12 Aug 2026 - 14 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Charges for E.I. maintenance of the Kalna S.D. Hospital incl. other Buildings within the premises of Hospital in the Dist. of Purba Bardhaman. Round the Clock. including Holidays. (Reliever for each Category of engaged person viz. |Highly Skilled/ Skilled/ Semi-Skilled/ Un-Skilled must be provided during weekly off days as per Rules! Regulations/ Guidelines of WB Labour Department and rate should be quoted accordingly.) The agency has to depute : 1) One no(1) Electrician(Skilled Labour) having i(a),i(b),iv& v Electrical workman permit issused from WB Licensing Board and 2 nos Helper (Un-skilled Labour) , in 1st shift on as per instruction of EIC 2) One no(1) Electrician(Skilled Labour) having i(a),i(b),iv& v Electrical workman permit issused from WB Licensing Board and 1 nos Helper (Un-skilled Labour) , in 2nd shift on as per instruction of EIC 3) One no(1) Electrician(Skilled Labour) having i(a),i(b),iv& v Electrical workman permit issused from WB Licensing Board and 1 nos Helper (Un-skilled Labour) , in 3rd shift on as per instruction of EIC | |||||
| 1.01 | (i)Skilled Workman: 01 Man for 12 month[During Shift-A-06:00 to 14:00 or as per direction of EIC].(Having atleast I(a),I(b) , II, IV & V DOE WB) Electrical workman's permit from licencing board): | - | Months | - | - |
| 1.02 | ii) Helper (Unskilled): 01 Man for 12 month [During Shift-A-06:00 to 14:00 or as per direction of EIC] Electrical workman's permit from licencing board): | - | Months | - | - |
| 1.03 | ii) Helper (Unskilled): 01 Man for 12 month [During Shift-A-06:00 to 14:00 or as per direction of EIC] Electrical workman's permit from licencing board): | - | Months | - | - |
| 1.04 | (i)Skilled Workman: 01 Man for 12 month[During Shift-B-14:00 to 22.00 or as per Direction of EIC].(Having atleast I(a),I(b) , II, IV & V DOE WB) Electrical workman's permit from licencing board): | - | Months | - | - |
| 1.05 | ii) Helper (Unskilled): 01 Man for 12 month [During Shift-B-14:00 to 22.00 or as per Direction of EIC] Electrical workman's permit from licencing board): | - | Months | - | - |
| 1.06 | (i)Skilled Workman: 01 Man for 12 month[During Shift-C-22:00 to 06:00 or as per Direction of EIC].(Having atleast I(a),I(b) , II, IV & V DOE WB) Electrical workman's permit from licencing board): | - | Months | - | - |
| 1.07 | ii) Helper (Unskilled): 01 Man for 12 month [During Shift-C-22:00 to 06.00 or as per Direction of EIC] Electrical workman's permit from licencing board): | - | Months | - | - |
| 2Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible. | |||||
| 2.01 | A. Scope of Work :
The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.50 MB
BOQ_5089513.xls
BOQ • 0.37 MB
new2911.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .