Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.2 LAccepted-AOC | ₹50.2 L | L1 | Accepted-AOC Quoted L1 Rate and executed agreement on 12.03.2026 |
| 2 | L2₹51.5 LRejected-AOC MAYILADUTHURAI | ₹51.5 L | L2 | Rejected-AOC L2 hence rejected |
| 3 | L3₹52.0 LRejected-AOC | ₹52.0 L | L3 | Rejected-AOC L3 hence rejected |
| Sl No | Description | Qty | Unit | N.ELANGOVAN L3 | M/s. BSR Engineering L1 | GSPandiyan L2 |
|---|---|---|---|---|---|---|
| 1.00Strengthening of Visalur to Eduthukatti Road in visalur Panchayat at Sembanarkoil Block. Km 0/0 - 1/210 - (R-828) At Mayiladuthuai district under NABARD – 2026-27 Package No: 05 | ||||||
| 2.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | ||||||
| 3.00 | Km 0/0 - 1/210 | 726 | M2 | 8 ₹5,808 | 5.82 ₹4,225.32 | 6 ₹4,356 |
| 4.00Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification. | ||||||
| 5.00 | Km 0/0 - 1/210 | 1,210 | M2 | 24 ₹29,040 | 21.34 ₹25,821.4 | 21 ₹25,410 |
| 6.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | ||||||
| 7.00 | Km 0/0 - 1/210 | 363 | M3 | 150 ₹54,450 | 134.83 ₹48,943.29 | 139 ₹50,457 |
| 8.00Providing US Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc | ||||||
| 9.00Side Berms | ||||||
| 10.00 | KM 0/0 - 1/000 | 118.36 | M3 | 1,280 ₹1,51,500.8 | 1,231.9 ₹1,45,807.68 | 1,270 ₹1,50,317.2 |
Tender Value
₹56.4 L
EMD Value
₹57,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Additional Collector (dev.), Mayiladuthurai
District Collector office, Mayiladuthurai
Package No.05 Strengthening Of Road From Visalur to Eduthukatti Road (R-828) Visalur Panchayat in Sembanarkoil Block Km 0/0 - 1/210 At Mayiladuthurai district under NABARD 2026-27
2026_RDTN_657054_5
A2/320/2026 dt.12.02.2026
Open Tender
Civil Works - Roads
180 days
Mayiladuthurai District
Please refer Tender Documents
4 documents required · 4 mandatory
₹0
₹57,000
District Collector office, Mayiladuthurai
11 May 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
14 Feb 2026
18 Feb 2026
Strengthening of Visalur to Eduthukatti Road in visalur Panchayat at Sembanarkoil Block. Km 0/0 - 1/210 - (R-828) At Mayiladuthuai district under NABARD – 2026-27 Package No: 05
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing US Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc
Side Berms
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20% & 2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) Grade III
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion SS I at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for ,Hm stone,
Provision for ,Km stone,
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonalgrowth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.09 MB
05Visalur.pdf
Tender Documents • 1.28 MB
BOQ_788239.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid