Loading…
Loading…
Tender Value
₹86.2 L
EMD Value
₹1.7 L
Closing Date
15 Oct 2026, 2:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
S AND T
14 conditions · 2 needing a document upload
For works amounting Rs.50 lakhs and above: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Panel Interlocking or Route Relay Interlocking or Electronic Interlocking or IBH or Automatic Signalling or LC gate Interlocking or AFTC or SSDAC or MSDAC.
9 conditions · 2 needing a document upload
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII, IX, XI, VIA, VIB, VI and Annexure-V & Annexure-V(A) of GCC-2022 respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are requested to go through the following documents which are available in upload/View Documents in Home page of IREPS portal for works tenders before submitting the e-tender. 1. General Instruction for E-Tenders on works contract--Chapter- I 2. Special Condition-General- Chapter-II
Opening of e-tender : 1. The e-tenders will be opened online using the IREPS portal anytime after tender closing time. No representative is required to be present for opening of e-tender and taking notes of rates quoted and ranking as the complete details of rates etc. of all the bidders shall be available to the bidders through the website after the opening of the tender. 2. The earnest money cost is to be paid through online banking facilities through the online portal and by giving the other details online on website www.ireps.gov.in. Note: For more details refer to Cl: 4 & 12 of General Instruction-Chapter-I for Submission of EMD, Cost of Tender Document and opening of e- tender.
"Asansol Division: S&T work i/c/w Full length arrangement at Jagadishpur."
64-SDSTE-ASN-2026-27~ER
64-SDSTE-ASN-2026-27
Open
Works - General
18 Months
Paschim Bardhaman, West Bengal
₹0
₹1.7 L
23 Sept 2026
23 Sept 2026
1 Oct 2026
214 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 68,06,947.4 | ||
| — | 5.00 | — | — | ||
| Supply of colour light signal post 3.6 mtrs. and ladder 3.5 mtrs. With bases for ladder and post as per RDSO SPEC. NO. IRS-S-6-81 and DRG. NO. SA-23153/ADV/AIT-1. All drawing should be as per latest. Note: - this includes signal post, base, ladder, ladder base, platform, rail guard & blanking off. Inspection: Consignee . | — | — | — | 78,635 | |
| — | 5.00 | — | — | ||
| Casting, concreting & curing of foundation for Main signal including cost of all materials required for casting and concreting. All materials required for execution will be supplied by the contractor including cement, sand & stone chips as per DRG. NO. S&T/C-42(NKG). | — | — | — | 40,325 | |
| — | 3.00 | — | — | ||
| Supply of CLS (colour light signal) unit FRP 2 Aspect complete without lens, lamps and signal transformer as per Drg. No. SA 23003/A/M(ADV.) or latest & RDSO/SPN/194/2006 or latest and as per FRP Spec. no RDSO/SPN/151/1997 or latest .(Signal unit to be compatible to LED lighting unit). Inspection: Consignee. | — | — | — | 79,749 | |
| — | 3.00 | — | — | ||
| Installation, erection and wiring of CLS 2 aspect unit FRP , post, ladder & base complete including paying out of tail cable from location box as per Rly. site engineer. Note:- This includes installation, erection & wiring of signal unit includes fixing, wiring of LED signal lighting unit, current regulator and this also includes protection of unit from rain water. For Installation, erection and wiring all materials including nuts, bolts to be supplied by contractor except Signal post, ladder, base, unit, earth pipe & LED lighting unit. Signal post, ladder, base, unit, LED lighting unit will be supplied by Rly. | — | — | — | 4,974 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Modified_Cable_cut_JPO_NO._94.pdf Annexure I
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
GCC Correction Slip1
ATTACHMENT
GCC Correction Slip 2
ATTACHMENT
mergedGCCCorrectionslip3456.pdf GCC Correction Slip 3456
ATTACHMENT
MergedGCCCorrectionSlip78910.pdf GCC Correction Slip 78910
ATTACHMENT
2018-CE-I-CT-9dtd.pdf
ATTACHMENT
Annexure-C.pdf
ATTACHMENT
Modified_Cable_cut_JPO_NO._94.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14.07.2022.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf
ATTACHMENT
mergedGCCCorrectionslip3456.pdf
ATTACHMENT
MergedGCCCorrectionSlip78910.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
GCCCorrectionslip11..pdf
ATTACHMENT
ALLANNEXURENEW.pdf
ATTACHMENT
JAGADISHPUR_2.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .