| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.0 LAccepted-AOC KOCHGAON CITY TOWN GOLAGHAT P O FURKATING P S GOLAGHAT DISTRICT GOLAGHAT PIN 785610 | GOLAGHAT | ASSAM | 785610 | L1 | Accepted-AOC Accept | |
| 2 | L1₹72.0 LRejected-Finance | L1 | Rejected-Finance Verified | |
| 3 | L1₹72.0 LRejected-Finance | L1 | Rejected-Finance Verified | |
| 4 | L2₹81.4 L+₹9.4 L (13.0%)Rejected-Finance | L2 | Rejected-Finance Verified | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹80.0 L
EMD Value
₹1.6 L
Closing Date
9 Jan 2020, 2:00 pmClosed
Chief Engineer, PWD (Roads), Assam
O/o the Chief Engineer, PWD (Roads), Assam, Chandmari, Guwahati, 781003
MLCSNA/RIDF-XXV/Golaghat/05 Construction of RCC Bridge No. 1/1 over river Merajan on Nabajyoti Ali including approach and protection work under MLCSNA under RIDF-XXV of NABARD
2019_PWD_15423_12
CESTBRNAB/RIDFXXV/17/19-20/Pt6
Open Tender
Civil Works
Item Rate
365 days
Golaghat
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,800
Empowered Officer, ASRB
₹1.6 L
Yes
17 Jun 2020
20 Dec 2019
10 Jan 2020
20 Dec 2019
9 Jan 2020
20 Dec 2019
20 Dec 2019 - 8 Jan 2020
Amount
Bridge Proper : Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works. A) Above 900 mm
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavated earth to the extent required and utilising theremaining earth locally for road work.) A) Ordinary soil a) 'Mechanical Means (Depth upto 3 m))( Without dewatering )
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-750 mm)
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test.
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. A) RCC Grade M20 a) Using Concrete Mixer
Levelling course for Pile cap
Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications A) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork A) RCC Grade M25 a) Height upto 5m i) Using concrete Mixer
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications A) TMT-IS 1786 ( Fe-500 D) Secondary Producer (ISI approved)
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. A) Using Concrete Mixer a) For solid slab super-structure i) Height 5m to 10m
Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications A) TMT-IS 1786 ( Fe-500 D) Secondary Producer (ISI approved)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Burried Joint (Providing and laying a burried expansion joint, expansion gap being 20 mm, covered with 12 mm thick, 200 mm wide galvanised wieldable structural steel plate as per IS: 2062, placed symmetrical to centre line of the joint, resting freely over the top surfaces of the deck concrete, welding of 8mm dia, 100mm long galvanized nails spaced 300mm C/C along the center line of the plate , all as specified in clause 2604.)
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular material / Sandy material
Drainage Spouts complete as per drawing and Technical specification
Carrying out Sub Soil investigation (SSI) for all type of soil (except boring in rock) upto depthof 30 m or refusal (N=100) for each foundation location as per IRC 78-2014 and submission of SSI report to the Engineer in charge for approval . Preparation & submission of Design calculation & Drawings of foundation , sub structure,Super structure as relevant IRC Codes and SSI Report , 2( two) each of Design& Drawing of each bridge to be submitted for approval and 8 ( eight)copies after approval of competent authority. including providing and erecting informatory sign board as per norms of NABARD
Bridge Approach : Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) from private land (b) from Govt land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) (a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) from private land '(b) from Govt land
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( Including cost of testing of materials at site and laboratory as directed by the deptt.) A) for grading- I Material
Mustafa Hussain
SRI PURNAKANTA HAZARIKA
Sagar Gohain
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .