| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-Finance | L1 | Accepted-Finance Verified and found okay | |
| 2 | L2₹27.2 L+₹4.5 L (19.9%)Accepted-Finance | L2 | Accepted-Finance Verified and found okay | |
| 3 | L3₹28.1 L+₹5.4 L (23.6%)Accepted-Finance | L3 | Accepted-Finance Verified and found okay | |
| 4 | L4₹31.9 L+₹9.2 L (40.5%)Accepted-Finance 4 C 13 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 SALEM DT | SALEM | TAMIL NADU | 636402 | L4 | Accepted-Finance Verified and found okay |
Tender Value
Refer Docs
EMD Value
₹34,000
Closing Date
30 Sept 2020, 2:00 pmClosed
SE/Operation/Salem
230KV SS, Nethimedu, Salem-2
AMC for EHT Lines of Gobi Operation Division
2020_EB_179471_1
ET10/20-21
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Gobi
Please refer Tender document
3 documents required · 3 mandatory
₹0
₹34,000
Yes
28 Oct 2020
15 Sept 2020
1 Oct 2020
15 Sept 2020
30 Sept 2020
25 Sept 2020
16 Sept 2020 - 25 Sept 2020
Amount
Conducting periodical line patrol & checking tower members insulators jumpers hardware fittings & all other accessires identifying the weak spots to carry out the rectification works periodically when the line is in energised condition including all labour lead, lift, transport etc., complete.(Plain Area)
Conducting periodical line patrol & checking tower members insulators jumpers hardware fittings & all other accessires identifying the weak spots to carry out the rectification works periodically when the line is in energised condition including all labour lead, lift, transport etc., complete.(Forest Area)
Conducting special line patrol for tripping & checking tower members, insulators jumpers hardware fittings & all other accessires by climbing the towers & identifying the weak spots to carry out the rectification works periodically when the line is in energised condition including all labour lead, lift, transport etc., complete.(Plain Area)
Conducting special line patrol for tripping & checking tower members, insulators jumpers hardware fittings & all other accessires by climbing the towers & identifying the weak spots to carry out the rectification works periodically when the line is in energised condition including all labour lead, lift, transport etc., complete.(Forest Area)
Conducting special line patrol for breakdown & checking tower members insulators jumpers hardware fittings & all other accessires by climbing the towers & identifying the weak spots to carry out the rectification works periodically when the line is in energised condition including all labour lead, lift, transport etc., complete.(Plain Area)
Conducting special line patrol for breakdown & checking tower members insulators jumpers hardware fittings & all other accessires by climbing the towers & identifying the weak spots to carry out the rectification works periodically when the line is in energised condition including all labour lead, lift, transport etc., complete.(Forest Area)
Conducting pre masoon for checking tower members insulators jumpers hardware fittings & all other accessires by climbing the towers & identifying the weak spots to carry out the rectification works periodically under line clear condition including all labour lead, lift, transport etc., complete.(Plain Area)
Conducting pre masoon for checking tower members insulators jumpers hardware fittings & all other accessires by climbing the towers & identifying the weak spots to carry out the rectification works periodically under line clear condition including all labour lead, lift, transport etc., complete.(Forest Area)
Tree cutting with cost of all labour,lead,lift for all kind of trees etc.,complete.(Plain Area)
Clearing light jungle without uprooting including labour, lead, lift, etc, complete (Plain Area)
P.C.C. 1:2:4, using 40 mm HBG stone for muffing & coping with form work including cost of all materials curing lead, lift, etc, complete (Plain Area)
P.C.C. 1:2:4, using 40 mm HBG stone for muffing & coping with form work including cost of all materials curing lead, lift, etc, complete(Forest Area)
Plastering with CM 1:3, 12mm thick for coping including cost of all materials curing lead, lift, etc, complete(Plain Area)
Plastering with CM 1:3, 12mm thick for coping including cost of all materials curing lead, lift, etc, complete(Forest Area)
Replacment of 24 units of tension insulators with fittings including cost of all materials curing lead, lift, etc, complete as per standard specification (Plain Area)
Replacment of 23 units of tension insulators with fittings including cost of all materials curing lead, lift, etc, complete as per standard specification (Plain Area)
Replacment of 14 units of tension insulators with fittings including cost of all materials curing lead, lift, etc, completeas per standard specification (Plain Area)
Replacment of 13 units of tension insulators with fittings including cost of all materials curing lead, lift, etc, complete as per standard specification (Plain Area)
Replacment of 8 units of tension insulators with fittings including cost of all materials curing lead, lift, etc, complete as per standard specification (Plain Area)
Replacment of 8 units of tension insulators with fittings including cost of all materials curing lead, lift, etc, complete as per standard specification (Forest Area)
Replacment of 7 units of tension insulators with fittings including cost of all materials curing lead, lift, etc, complete as per standard specification (Plain Area)
Replacment of 7 units of tension insulators with fittings including cost of all materials curing lead, lift, etc, complete as per standard specification (Forest Area)
Providing mid span joints for twin moose conductor by availing LC including charges for lowering the conductor providing jointing and re-stringing with all labour, lead, lift etc., complete as directed by the engineer at site (Plain Area)
Providing mid span joints for Zebra conductor by availing LC including charges for lowering the conductor providing jointing and re-stringing with all labour, lead, lift etc., complete as directed by the engineer at site (Plain Area)
Providing mid span joints for Panther conductor by availing LC including charges for lowering the conductor providing jointing and re-stringing with all labour, lead, lift etc., complete as directed by the engineer at site (Plain Area)
Providing mid span joints for Panther conductor by availing LC including charges for lowering the conductor providing jointing and re-stringing with all labour, lead, lift etc., complete as directed by the engineer at site (Forest Area)
Rectifying/Replacing defective jumpers which have been identified by patrolling gang & providing new jumpers including charges for providing temporary earthing at works spot making arragements at towers for rectification/replacement of defective jumpers with new jumbers removing temporary earthing from works spot after completion of works all labour, lead. lift,etc., complete. 400 KV Jumper
Rectifying/Replacing defective jumpers which have been identified by patrolling gang & providing new jumpers including charges for providing temporary earthing at works spot making arragements at towers for rectification/replacement of defective jumpers with new jumbers removing temporary earthing from works spot after completion of works all labour, lead. lift,etc., complete. 230 KV Jumper
Rectifying/Replacing defective jumpers which have been identified by patrolling gang & providing new jumpers including charges for providing temporary earthing at works spot making arragements at towers for rectification/replacement of defective jumpers with new jumbers removing temporary earthing from works spot after completion of works all labour, lead. lift,etc., complete. 110 KV Jumper
Rectifying/Replacing defective jumpers which have been identified by patrolling gang & providing new jumpers including charges for providing temporary earthing at works spot making arragements at towers for rectification/replacement of defective jumpers with new jumbers removing temporary earthing from works spot after completion of works all labour, lead. lift,etc., complete. 110 KV Jumper (Forest Area)
Providing Repair sleeve for conductor by availing LC including charges for lowering the conductor providing jointing & re-stringing complete 400 KV Repair sleeve
Providing Repair sleeve for conductor by availing LC including charges for lowering the conductor providing jointing re-stringing complete 230 KV Repair sleeve
Providing Repair sleeve for conductor by availing LC including charges for lowering the conductor providing jointing re-stringing complete 110 KV Repair sleeve
Providing Repair sleeve for conductor by availing LC including charges for lowering the conductor providing jointing re-stringing complete 110 KV Repair sleeve (Forest Area)
EPF @13 % should be entered by the bidder
E.S.I. @3.25 % should be entered by the bidder
GST @18 % should be entered by the bidder
R K and Co
K. Vaithilingam
metturassociates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .