Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC 3 A E 55 OBRA COLONY OBRA SONBHADRA UTTAR PRADESH 231219 | SONBHADRA | UTTAR PRADESH | 231219 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹7.2 L+₹10,535 (1.48%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹7.4 L+₹27,600 (3.87%)Rejected-Finance | L3 | Rejected-Finance Not L1 |
Tender Value
Refer Docs
EMD Value
₹13,620
Closing Date
29 Aug 2022, 6:00 pmClosed
Superintending Engineer-III 3x200MW, BTP
Office of Superintending Engineer-III 3x200MW, BTPS, OBRA
Work of Overhauling, Calibration, Testing commissioning of Manometry Instruments SIEMENS make PLC control system along with Gate Valves, Electrical Drives all Control and Instrumentation system of ASH HANDLING SYSTEM including Repairing of damag
2022_RVUNL_717985_1
T- 03/SE-III 3X200MW/CIMD-I/BTPS/ O.H. Unit-9/202
Open Tender
Miscellaneous Works
Lump-sum
45 days
Obra thermal plant
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Dy. CAO, CFABO,BTPSObra
₹13,620
Yes
31 Oct 2022
28 Jul 2022
30 Aug 2022
28 Jul 2022
29 Aug 2022
28 Jul 2022
28 Jul 2022 - 29 Aug 2022
Amount
Complete Overhauling, Calibration,testing and Re-commissioning of Pressure/Differential Pressure/Flow/Level Transmitters with termination of cable at both end with proper ferruling and dressing.(i) Boiler side - 96 Nos(ii) Turbine Side - 64 Nos
Complete Overhauling, Calibration, testing and Re-commissioning of Pressure/Differential Pressure/Vaccumm Switches with termination of cable at both end with proper ferruling and dressing(i) Boiler side - 66 Nos(ii) Turbine Side - 39 Nos
Complete Overhauling, Calibration, testing and Re- commissioning of Pressure Gauges. (i) Boiler side - 40 Nos(ii) Turbine Side - 190 Nos
Complete Overhauling, Calibration, testing and Re-commissioning of Level Switches at site with termination of cable at both end with proper ferruling and dressing. (Levcon/ Automat)(i) Boiler side - 11 Nos(ii) Turbine Side - 24 Nos
Overhauling and servicing of B-501/B-601/ SS/ cock valve/Forged body/Union & isolating Valves.(i) Boiler side – 160 Nos(ii) Turbine side – 220 Nos
Complete Overhauling, cleaning & making them perfectly sealed by gasket & gland, Replacement of T.B , ferrule and lugs of Junction Boxes/LIR.(iii) Turbine side – 30 Nos(iv) Boiler side - 20 Nos
Complete overhauling, testing, Calibration and Re-commissioning of digital Indicators (Pyrotech/ Electromode/Othe(vii) Double Channel – 35 Nosrs Make).(vi) Single channel – 80 Nos
Cleaning, Overhauling and Testing of PA flow measurement system, Differential pressure measurement system, Inlet pressure measurement system in all 06 Bowl Mill including work in all Impulse line upto Transmitters, Drain pipes and its purge air system.
Cleaning, Overhauling and Testing of Secondary air Flow Measurement system (Left/Right) and Fabrication of Equalizing points if required.
Cleaning and blowing of tapping points of different pressure/ D.P transmitters/Switches after opening it associated pipe line.
Complete Overhauling of Drum level Hydra step System (Left/Right) in all respect
Replacement of B-501/ Bar stock valve-Needle/3 way KTK/Forged body/Union & isolating Valves as per site requirement.
Complete Installation and commissioning of Displacer type Transmitter at Deaerator both electrically and Mechanically in all respect
Complete Installation and commissioning of Oval wheel Meter (LDO Flow meter) both electrically and mechanically in all respect.
Replacement/rerouting/Restoration of impulse line pertaining to different Transmitter, Pr switches, Pressure Gauges and Valves as per side requirement.
Replacement of instrument fitting, adopter, nut & tails, Elbow connector etc.
Fabrication/ Repairing of Instruments plateform at Boiler 0 to 52 M of size 3.5ft X 4.5 ft /higher size as per site requirement.
Repairing of LIE panel at boiler 0 to 52 M in all respect to make them perfectly sealed and painting with smoke gray paint and Re-writing the Tag name with black paint on yellow base.
Patrolling/ Laying of control cable of size 2C to 20 C X 0.5mm to 1.5 mm as per site requirement.
Complete overhauling, testing and commissioning of oil pressure drop relay (OPDR).
Complete overhauling, testing and commissioning of condenser Vacuum switch.
Overhauling, testing, servicing, commissioning, circuit checking and cleaning of SIEMENS make PLC control system along with Gate Valves, Electrical Drives & all Control and Instrumentation system of ASH HANDLING SYSTEM of Unit no 9, BTPS, Obra.
M/S. INDUSTRIAL ENGINEERING ENTERPRISES
POWER ELECTRONICS CORPORATION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .