Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹11.0 L
EMD Value
₹11,028
Closing Date
3 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE RW Electrical Division Sambalpur
RURAL WORKS ELECTRICAL DIVISION, SAMBALPUR
Shifting of 11 KV Line of 1 no C type Qtr building at JMFC Muribahal
2026_CERWI_146755_1
EE/RWELECT/SBP/41/2026-27
Open Tender
Electrical Works
Percentage
90 days
Balangir
Please Refer to Tender documents
2 documents required · 2 mandatory
₹6,000
₹11,028
20 Nov 2026
20 Nov 2026
4 Dec 2026
20 Nov 2026
3 Dec 2026
20 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supports 11 Mtr Long 150x150 RSJ(GI) Pole(11KV Line+S/S+Others) | 6 | No. | 46,875.43 | ₹2,81,252.58 |
| 2 | Supports 13 Mtr Long RSJ(GI) Pole | 4 | No. | 55,398.23 | ₹2,21,592.92 |
| 3 | Cost of 11 KV line with 55sqmm Cover conductor | 1.58 | KM | 1,83,456.4 | ₹2,88,943.83 |
| 4 | Cost of common material for 11KV SP pin point with 13 Mtr long RSJ(GI) Pole(Excluding Pole and civil work cost) | 5 | No. | 4,365.22 | ₹21,826.1 |
| 5 | Cost of common material for 11KV SP cut point with 11Mtr Long RSJ(GI) Pole (Excluding Pole and civil work cost)(55SQMM) | 5 | No. | 36,327.09 | ₹1,81,635.45 |
| 6 | Cost of cradle Guard | 3 | No. | 11,469.9 | ₹34,409.7 |
| 7 | Concreting Ratio 1:1.5:3(M-20 Grade)(500mmx500mmx1800mm) =.45 Cu mtr(Per Pole) | 3.75 | Cubic meter | 6,715.34 | ₹25,182.53 |
| 8 | Couping ratio 1:1.5:3(M-20 Grade )with Dimension (500x500x450)=0.1125 cu mtr | 1.13 | Cubic meter | 6,715.34 | ₹7,554.76 |
| 9 | Stay Concreting Ratio 1:1.5:3(M-20 Grade)(500mmx500mmx800mm)=0.2 Cubic Mtr | 2 | Cubic meter | 6,715.34 | ₹13,430.68 |
| 10 | Dismental Cost of S/S | 0.5 | KM | 53,949.54 | ₹26,974.77 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.96 MB
Tendernotice_2.pdf
PDF • 0.73 MB
BOQ_622233.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .