Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
12 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COMMISSIONER
UDHAGAMANDALAM MUNICIPALITY
Construction of Multi purpose building at Charring cross in Udhagamandalam Municipality
2024_MAWS_446334_1
E5/1025/2024 -2
Open Tender
Civil Works
Works
90 days
UDHAGAMANDALAM MUNICIAPLITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Yes
12 Mar 2024
10 Mar 2024
12 Mar 2024
10 Mar 2024
12 Mar 2024
10 Mar 2024
Amount
Construction of Multi purpose building at Charring cross in Udhagamandalam Municipality
Boring, Providing and installing Cast Double under Reamed piles of 300mm diametre and length below pile cap in cement concrete piles with mix M 20 concrete to carry a safe working load not less than than specified, excluding the cost of steel reinforcement but including the Bentonite solution,machinary and labour charges etc., all complete. (Length of pile for payment shall be measured from bottom of pile to the bottom of pile cap).
Earth work Open excavation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary, rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10
Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10
Filling in basement withFilling Sand in layers of not more than 15cm thick, well rammed, watered and consolidated etc., complete complying with standard specification. And as directed by the departmental officers
Plain Cement concrete 1 : 4 : 8 (one cement, four sand and eight aggregates) using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS
Reinforced cement concrete in 1:11/2:3[one cement and one and half sand and four the aggregate ] using 20 mm size IRC grade machine crushed chips and excludingcost of reinforcement and centering works and including the cost of mixing,laying , curing ,and etc.,complete complying with standard specification .
Supplying, fabricating and placing in position of steel reinforcemenrt using mild steel/ribbed tar steel rods for all R.C.C. works asper the design given inclduing cost of all steel & binding wire also in all floors etc., complete complying with standard specifications and as directed by the departmental officers
Supplying and erecting centering for sides and soffits including supports upto 3.29m high for plane surfaces such as RCC Slabs, rectangular beams, lintels, bed blocks, landing beams, canopy etc., with all cross bracings using mild steel sheets of size 90c/c etc., complete complying with standard specifications and as directed by the departmental officers. a) For plinth beam
For column and slab
Manufacturing and supplying and fixing of steel doors with the following specifications. MS angles of size 40x 40x 6mm at 3.5 Kg./m are used for the outer frame and MS angle of size 35x 35x 5mm at 2.6 Kg/m for the shutter frames. Stiffeners with 32x6mm at 1.5 Kg./m MS flat is provided as the lockroll of the door and welded intact of both ends to the shutter frame 18g CR sheets of best quality is laid as panel in the shutter frames 18x5mm at 0.7 Kg./m MS flat is welded over the 32x6mm at 1.50 Kg./m MS flat on the rear side of the door sandwitching the CR sheet for rigidity. Additional stiffeners with 18x5mm at 0.7 Kg./m MB flats are provided diagonally onthe rear side of the shutter 2 Nos. of hinges in case of single leaf and 4 nos. of hinges in case of double leaf shutters is provided. 6 Nos. of hold fasts 120mm length spilced at the ends are wolded to the outer frame of the door. Tower bolt 2 Nos. one at the top and the other at the bottom are provided.
Plastering in cement mortar 1:5 mix 12mm thick using clean screened sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting for plastering for plastering and protecting from other damages till setting of mortar etc.complete complying with standard specification--10m2
Painting New iron works with two coats of Synthetic enamel paint of approved paint of approved qaulity and colour with approved quality in all floors. The rate is inclusive of cost of all materials and brushes and scafolding charges etc., complete complying with standard specifications
Painting With Red Oxide Primer for new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved red oxide paint over Iron Surface in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Fly Ash Brick work in CM 1:5 (one cement & five sand) using II class ground moulded bricks of size 9"X43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT
white washing two coats using best shellime and preparing the surface fit for white washing as confirming to the IS 6278-1971 --100m2
Plain Cement concrete 1 : 2 : 4 (one cement, two sand and four aggregates) using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS
Painting external wall with two coats of best approved quality of Plastice Emultion Paint over a including One Coat of priming of Exterior Emulsion Paint - Water Based Primer (Liquid) primier over cement surface wall as dirceted by the departmental officers including cleaning preparing the surface etc,complete complying with standard specification.The cement paint should be got approved by the departmental officers before use on work
Special Celing Plastering in cement mortar 1:3 mix 10mm thick using clean screened sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting for plastering for plastering and protecting from other damages till setting of mortar etc.complete complying with standard specification--10m2
ravikumar muralikumar
stage.html
html • 0.02 MB
finance_531507.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .