Loading…
Loading…
Tender Value
₹9.0 Cr
EMD Value
₹4.6 L
Closing Date
7 Sept 2026, 3:00 pm
Superintending Engineer, NH,Madurai
O/o Superintending Engineer, National Highways, No.5, Besant Road, ChinnaChokkikulam Madurai 02
Strengthening at km 20/4 - 34/460 of Paramakudi - Keerandai Road (M-652) (Job.No.TN-CRIF-2025-26-MDU-29)
2026_MoRTH_922852_1
TN No 01/2026-27/HDO/NH/Dt.21.08.26
Open Tender
Civil Works - Highways
Percentage
210 days
Paramakudi
As per Tender documents
4 documents required · 4 mandatory
₹17,700
Divisional Engineer NH Madurai
₹4.6 L
O/o Superintending Engineer, NH,Madurai
21 Aug 2026
21 Aug 2026
8 Sept 2026
21 Aug 2026
7 Sept 2026
21 Aug 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Light jungle with uprooting including all other incidental charges etc., as per MORTH standadrd specifications | - | sqm | 6.89 | - |
| 2 | Picking the existing BT Surface upto 50mm thick as directed by the Departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete as per clasue 111, 112,305.4.3 of MoRTH-V Revision etc., complete. | - | sqm | 23.36 | - |
| 3 | Providing and laying Tack Coat over Existing BT surface using 2 kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | - | sqm | 28.81 | - |
| 4 | Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | - | sqm | 22.56 | - |
| 5 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm,0.43cum of 13.20-2.36mm and 0.08 cum of 2.36 mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grade sand cross section sand consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tool sand plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 1 | cum | 9,384.3 | ₹9,374.92 |
| 6 | Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36 mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of with mechanical paver to the specified grade sand cross section sand consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tool sand plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grade-II | 1 | cum | 11,806.63 | ₹11,794.82 |
| 7 | Providing and laying Bituminous Concrete to 50mm thick using 0.22 cum of 26.5 - 13.20mm, 0.24 cum of 13.20 - 2.36 mm and 0.26 cum of 2.36& below IRC HBG metal with 62.40 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical pave to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH. | - | cum | 11,274.36 | - |
| 8 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance | - | cum | 194.84 | - |
| 9 | RECONSTRUCTION OF PIPE CULVERT INTO SINGLE CELL BOX CULVERT (2m x 1.5m)AT KM 27/610
Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. | - | cum | 302.96 | - |
| 10 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. | 1 | cum | 309.63 | ₹309.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_969778.xls
BOQ • 0.33 MB
PQ2.pdf
Tender Documents • 1.20 MB
PQ1.pdf
Tender Documents • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].