Loading…
Loading…
Updated dates
Tender Value
₹24.0 L
EMD Value
₹48,017
Closing Date
5 Jun 2026, 6:00 pmDue today
DFO Udhampur
DFO Udhampur
Construction/Installation of Boundary Pillars 326 nos. in Gashund, Barar, Gnu Panjtara, Samail, Jakhi Khour Forest Bandhole Block Dudu Forest Range of Udhampur Forest Division under CAPEX FY 2026-27
2026_FD_310343_1
04 NIT of 2026-27
Open Tender
Civil Works
90 days
Bandhole, Dudu
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Udhampur
₹48,017
20 May 2026
20 May 2026
6 Jun 2026
20 May 2026
5 Jun 2026
20 May 2026
20 May 2026 - 25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, Depth/ heightupto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed .All Kind of Soil | 112.52 | Cum | 479.3 | ₹53,931.43 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 20mm nominal size | 8.66 | Cum | 4,826.5 | ₹41,775.67 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size | 90.02 | Cum | 5,733.6 | ₹5,16,121.41 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size | 41.55 | Cum | 9,395.7 | ₹3,90,356.57 |
| 5 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars | 1,893.98 | Kg | 123.2 | ₹2,33,338.4 |
| 6 | Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014( Nerolac) Exterior Emulsion paint is recommended. | 326 | Each | 500 | ₹1,63,000 |
| 7 | Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts | 727.14 | Sqm | 628.95 | ₹4,57,333.16 |
| 8 | Bajri avg. Distance MT 30 km and HL 2.5 km | 126.2 | Cum | 2,861.82 | ₹3,61,152.81 |
| 9 | Sand avg. Distance MT 30 km and HL 2.5 km | 63.1 | Cum | 2,861.82 | ₹1,80,576.41 |
| 10 | Steel avg. Distance MT 30 km and HL 2.5 km | 1.31 | MT | 2,506.91 | ₹3,271.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1004031.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid