Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 CrAccepted-AOC WARD NO 04 NEAR LIC PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 UDYAM MP 13 0003872 | CHHINDWARA | MADHYA PRADESH | 480441 | ₹1.4 Cr Quoted ₹1.2 Cr | L-1 | Accepted-AOC Lowest Rate |
| 2 | L-2₹1.3 CrRejected-Finance | ₹1.3 Cr | L-2 | Rejected-Finance Higher Rate |
| 3 | Rejected-Technical WARD NO 13 BANDHA MOHALLA PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 UDYAM MP 13 0003359 | CHHINDWARA | MADHYA PRADESH | 480441 | - | - | Rejected-Technical Submission not as per NIT |
| Sl No | Description | Qty | Unit | SAI SHREE CONSTRUCTION L1 | EQUIPMENTS MAINTENANCE & CARE L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation work by manual means in foundation or drains including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of same within lead of 50M in ordinary rock. | 117.6 | Cu. Mtr. | 2,439 ₹2.9 L | 2,200 ₹2.6 L |
| 2.00 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8 (1Cement : 4Coarse Sand : 8graded Stone aggregate 40mm nominal size) | 9.8 | Cu. Mtr. | 7,582 ₹74,303.60 | 6,700 ₹65,660 |
| 3.00 | Providing and laying in position specified grade of reinforced Cement Concrete excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level 1:2:4 (1Cement : 2Coarse Sand : 4graded Stone aggregate 20mm nominal size) | 19.6 | Cu. Mtr. | 9,920 ₹1.9 L | 8,800 ₹1.7 L |
| 4.00 | Reinforcement Cement Concrete work in walls (any thickness) including attached pillasters, buttresses, plinth and string courses fillets, columns, pillars, piears, abutments, posts and stuts etc upto floor five level excluding the cost of centering, shuttering, finishing and reinforcement. 1:2:4 (1Cement : 2Coarse Sand : 4graded Stone aggregate 20mm nominal size) | 323.4 | Cu. Mtr. | 12,819 ₹41.5 L | 11,300 ₹36.5 L |
| 5.00 | Centering and shuttering including strutting, propping etc. removal of form for foundations, footing, bases of columns etc. for mass concrete | 784 | Sq. Mtr. | 461 ₹3.6 L | 500 ₹3.9 L |
| 6.00 | Reinforcement for RCC work including straightening cutting, bending placing in position and binding all complete, Cold twisted bars | 17,150 | Kg. | 121 ₹20.8 L | 200 ₹34.3 L |
| 7.00 | 12mm Cement Plaster of mix 1:4 (1Cement:4Fine Sand) | 891.8 | Sq. Mtr. | 460 ₹4.1 L | 500 ₹4.5 L |
| 8.00 | White Washing with Lime to give an even shade : Old work (one or more coats) excluding material | 765.8 | Sq. Mtr. | 32 ₹24,505.60 | 100 ₹76,580 |
| 9.00 | Supply of M - Sand / Crush Sand | 1,800 | Cu.Mtr. | 1,127 ₹20.3 L | 1,000 ₹18 L |
| 10.00Carriage of material by manual labour including unloading and stacking for lead less than 0.50 Km | |||||
Tender Value
₹1.4 Cr
EMD Value
₹1.8 L
Closing Date
20 Dec 2025, 5:00 pmClosed
Staff Officer (Mining), WCL, Pench Area
Office of the Area General Manager Western Coalfields Limited Pench Area Parasia District Chhindwara
Construction of explosion proof Stoppings 50M thick with RCC in depillared Panel SW5B SW6A and SW7A of Seam II at Nehariya Underground Mine of Pench Area
2025_WCL_348678_1
pe3350-min-e0044-2025-26
Open Tender
Civil Works - Others
180 days
Nehariya Underground Mine of Pench Area
Please refer Tender documents.
7 documents required · 7 mandatory
₹1.8 L
10 Feb 2026
3 Dec 2025
22 Dec 2025
4 Dec 2025
20 Dec 2025
4 Dec 2025
4 Dec 2025 - 13 Dec 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Document
2.51 MB
BOQ
BOQ • 0.29 MB
Download all tender documents and submit your bid