Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.8 LAccepted-Finance | L1 | Accepted-Finance accepted | |
| 2 | L2₹39.5 L+₹1.7 L (4.52%)Accepted-Finance NO 87 NEW BALAJI NAGAR ATTIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | L2 | Accepted-Finance accepted |
| Sl No | Description | Qty | Unit | A.R.C.ENGINEERING L2 | JANANI ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for external weekly cleaning of LT switchgear panels, contactor panels, control push button, switchgear and Power transformer in RWPH, AHP,FOPH and A/C Plant in NCTPS-I (weekly once) | 51 | Opn | 3,426 ₹2,06,176.68 | 3,277 ₹1,97,209.86 Lowest |
| 2.00 | Charges for cleaning the outer surface and maintenance of the 6.6 KV, 265 KW HT Flushing Water Pump Motor- 3 Nos., 6.6 KV, 300 KW Recovery Water Pump Motor – 4 Nos. (weekly Once) | 51 | Opn | 2,931 ₹1,76,387.58 | 2,804 ₹1,68,744.72 Lowest |
| 3.00 | Charges for cleaning the outer surface and maintenance of the 6.6 KV, 230 KW HT Ash Slurry Disposal Pump Motor - 18 Nos. (weekly once) | 51 | Opn | 7,537 ₹4,53,576.66 | 7,209 ₹4,33,837.62 Lowest |
| 4.00 | Charges for cleaning the outer surface of 415V, 155 KW AWP motor - 9 Nos. at AHP, 415V, 110 KW HFO motor - 6 Nos., 9.3 KW LDO motor - 6 Nos., Sump Pump Motor, Drain Pump Motor, Decanting oil unloading Pump motor - 4 Nos., at FOPH (weekly once) | 51 | Opn | 3,768 ₹2,26,758.24 | 3,605 ₹2,16,948.9 Lowest |
| 5.00 | Charges for cleaning the outer surface of 415V, 30 KW SWP motor - 6 Nos., 30 KW SWBP motor - 3 Nos., 11 KW DP motor - 4 Nos., 22 KW Chilled Water Pump Motor - 4 Nos., 18.5 KW Condensate Water Pump Motor - 4 Nos., 5.5 KW Cooling Tower Motor - 4 Nos. at AC Plant (weekly once) | 51 | Opn | 3,768 ₹2,26,758.24 | 3,605 ₹2,16,948.9 Lowest |
| 6.00 | Releasing and cleaning of critical modules, healthiness checking of power Contactor tips and replacing if necessary and terminal tightness of all components and re-fixing the modules in the respective panels. Checking of cable tightness at module end and motor end, replacing of lugs if necessary for 1 module. AHP MODULES – 25 Nos.:
Seal Water Pump - 6 Nos.
Seal Water Booster Pump - 3 Nos.
Clinker Grinder module - 6 Nos.
Scrapper Feeder module - 6 Nos.
Drain Pump module - 4 Nos.
FOPH MODULES – 18 Nos.:
Heavy Furnace Oil Pump - 6 Nos.
Light Diesel Oil Pump module - 4 Nos.
Sump Pump module - 1 No.
Oil Drain Pump - 1 No.
Lorry Loading & Unloading pump (HFO) - 4 Nos.
Lorry Loading & Unloading pump (LDO) - 2 Nos. AC PLANT MODULES – 20 Nos.:
Compressor - 4 Nos.
Condensate Water Pump - 4 Nos.
Chilled Water Pump - 4 Nos.
Cooling Tower - 4 Nos.
AHU Unit 15.5 mtr - 2 Nos.
AHU “O” mtr - 2 Nos.
Total – 63 Nos. in AHP, FOPH, AC Plant
Now additional 27 Nos. for Air Handling Unit (AHU)
Air washer - 6 Nos.
Water Pump – 9 Nos.
Air Blower - 12 Nos.
Total module = 63 + 27 = 90 x 4 Times = 360 Opn | 360 | Opn | 2,472 ₹10,50,105.6 | 2,365 ₹10,04,652 Lowest |
| 7.00 | Releasing, checking and cleaning of finger contacts in breaker with acetone, healthiness of spring charging motors and mechanisms, tightness checking of all components of breakers and lubrication of all moving parts and checking their operations and re fixing the breakers. Opening of breaker panel back doors, checking cable tightness, cleaning and re fixing etc. for 1 No. LT breaker. (Critical breakers in AHP, AC Plant, FOPH, Silo) (AHP – 13 Breakers, FOPH – 3 Breakers, AC Plant – 2 Breakers, Silo - 6 Breakers)(24 Nos. x 4 Times) | 96 | Opn | 2,472 ₹2,80,028.16 | 2,365 ₹2,67,907.2 Lowest |
| 8.00 | Replacement of spring charge motor in 6.6 KV HT breaker AHP (SF6 Breaker - 15, VCB - 12) – 27 Breakers RWPH - 6 Breakers | 2 | Opn | 3,556 ₹8,392.16 | 3,401 ₹8,026.36 Lowest |
| 9.00 | Replacement of mechanism in 6.6 KV ABB make HT breaker AHP (SF6 Breaker - 15, VCB - 12) – 27 Breakers, RWPH – 6 Breakers | 1 | Opn | 17,707 ₹20,894.26 | 16,938 ₹19,986.84 Lowest |
| 10.00 | Disconnection of power cable, De-coupling the motor from pump and checking alignment (if necessary) (HT motor) ( RWPH - 4 Nos. , AHP - 21 Nos.) | 30 | Nos | 5,241 ₹1,85,531.4 | 5,013 ₹1,77,460.2 Lowest |
Tender Value
Refer Docs
EMD Value
₹32,600
Closing Date
15 Sept 2026, 2:00 pmClosed
SE/ES/NCTPS-I
SE/ES/NCTPS-I,Chennai-120
NCTPS I ES Circle EM II Division SD II Carrying out Routine maintenance works of HT LT Switchgear in RWPH 5 MVA Power Transformer 250 KVA Service Transformer VCB Battery set at RWPH and HT LT Switchgear and motors at AHP FOP AC Plant LT Switchgea
2026_EB_699750_1
CE/NCTPS-I/SE/ES/WC-46/2026-27
Open Tender
Power/Energy Projects/Products
Works
360 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹32,600
Yes
28 Sept 2026
31 Aug 2026
16 Sept 2026
31 Aug 2026
15 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for external weekly cleaning of LT switchgear panels, contactor panels, control push button, switchgear and Power transformer in RWPH, AHP,FOPH and A/C Plant in NCTPS-I (weekly once) | 51 | Opn | 2,978.8 | ₹1,51,918.8 |
| 2 | Charges for cleaning the outer surface and maintenance of the 6.6 KV, 265 KW HT Flushing Water Pump Motor- 3 Nos., 6.6 KV, 300 KW Recovery Water Pump Motor – 4 Nos. (weekly Once) | 51 | Opn | 2,548.7 | ₹1,29,983.7 |
| 3 | Charges for cleaning the outer surface and maintenance of the 6.6 KV, 230 KW HT Ash Slurry Disposal Pump Motor - 18 Nos. (weekly once) | 51 | Opn | 6,553.8 | ₹3,34,243.8 |
| 4 | Charges for cleaning the outer surface of 415V, 155 KW AWP motor - 9 Nos. at AHP, 415V, 110 KW HFO motor - 6 Nos., 9.3 KW LDO motor - 6 Nos., Sump Pump Motor, Drain Pump Motor, Decanting oil unloading Pump motor - 4 Nos., at FOPH (weekly once) | 51 | Opn | 3,276.9 | ₹1,67,121.9 |
| 5 | Charges for cleaning the outer surface of 415V, 30 KW SWP motor - 6 Nos., 30 KW SWBP motor - 3 Nos., 11 KW DP motor - 4 Nos., 22 KW Chilled Water Pump Motor - 4 Nos., 18.5 KW Condensate Water Pump Motor - 4 Nos., 5.5 KW Cooling Tower Motor - 4 Nos. at AC Plant (weekly once) | 51 | Opn | 3,276.9 | ₹1,67,121.9 |
| 6 | Releasing and cleaning of critical modules, healthiness checking of power Contactor tips and replacing if necessary and terminal tightness of all components and re-fixing the modules in the respective panels. Checking of cable tightness at module end and motor end, replacing of lugs if necessary for 1 module. AHP MODULES – 25 Nos.:
Seal Water Pump - 6 Nos.
Seal Water Booster Pump - 3 Nos.
Clinker Grinder module - 6 Nos.
Scrapper Feeder module - 6 Nos.
Drain Pump module - 4 Nos.
FOPH MODULES – 18 Nos.:
Heavy Furnace Oil Pump - 6 Nos.
Light Diesel Oil Pump module - 4 Nos.
Sump Pump module - 1 No.
Oil Drain Pump - 1 No.
Lorry Loading & Unloading pump (HFO) - 4 Nos.
Lorry Loading & Unloading pump (LDO) - 2 Nos. AC PLANT MODULES – 20 Nos.:
Compressor - 4 Nos.
Condensate Water Pump - 4 Nos.
Chilled Water Pump - 4 Nos.
Cooling Tower - 4 Nos.
AHU Unit 15.5 mtr - 2 Nos.
AHU “O” mtr - 2 Nos.
Total – 63 Nos. in AHP, FOPH, AC Plant
Now additional 27 Nos. for Air Handling Unit (AHU)
Air washer - 6 Nos.
Water Pump – 9 Nos.
Air Blower - 12 Nos.
Total module = 63 + 27 = 90 x 4 Times = 360 Opn | 360 | Opn | 2,149.95 | ₹7,73,982 |
| 7 | Releasing, checking and cleaning of finger contacts in breaker with acetone, healthiness of spring charging motors and mechanisms, tightness checking of all components of breakers and lubrication of all moving parts and checking their operations and re fixing the breakers. Opening of breaker panel back doors, checking cable tightness, cleaning and re fixing etc. for 1 No. LT breaker. (Critical breakers in AHP, AC Plant, FOPH, Silo) (AHP – 13 Breakers, FOPH – 3 Breakers, AC Plant – 2 Breakers, Silo - 6 Breakers)(24 Nos. x 4 Times) | 96 | Opn | 2,149.95 | ₹2,06,395.2 |
| 8 | Replacement of spring charge motor in 6.6 KV HT breaker AHP (SF6 Breaker - 15, VCB - 12) – 27 Breakers RWPH - 6 Breakers | 2 | Opn | 3,092.1 | ₹6,184.2 |
| 9 | Replacement of mechanism in 6.6 KV ABB make HT breaker AHP (SF6 Breaker - 15, VCB - 12) – 27 Breakers, RWPH – 6 Breakers | 1 | Opn | 15,397.8 | ₹15,397.8 |
| 10 | Disconnection of power cable, De-coupling the motor from pump and checking alignment (if necessary) (HT motor) ( RWPH - 4 Nos. , AHP - 21 Nos.) | 30 | Nos | 4,557.3 | ₹1,36,719 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_841169.xls
BOQ • 0.36 MB
corrigendum.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .