Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC ok |
| 2 | L2₹2.0 L+₹640 (0.32%)Rejected-AOC VILLAGE LOHANA DIST REWARI 2025R20245 | LOHANA | REWARI | HARYANA | ₹2.0 L+₹640 (0.32%) | L2 | Rejected-AOC ok |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
7 Sept 2026, 5:00 pmClosed
Amit Rathi
DIV Rewari
Annual maintenance estimate of Water supply and Sewerage Scheme in Sector-3, Rewari for the year 2026-27
2026_HBC_544529_1
202697CFE77B E1D1 41C4 AD82 3DE8C943686A258HSV
Open Tender
Civil Works
Works
20 days
Rewari
2 documents required · 2 mandatory
₹295
₹4,000
Yes
15 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [1.PM063] PM063. Running charge of pump (3.5 kilolitre) | 1,385 | Per Kilolitre | 71 | ₹98,335 |
| 2 | [21.96.2]Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-80 grade and PN- 4 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. 2. 225 mm Outside Dia | 42 | Per Metre | 1,896 | ₹79,632 |
| 3 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil | 105.6 | cum | 78 | ₹8,236.8 |
| 4 | [6.1.3]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 3. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) | 4 | cum | 3,426 | ₹13,704 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_624077.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .