Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC D 118 1 RAMGARH KOLKATA | KOLKATA | WEST BENGAL | ₹2.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 LRejected-AOC | ₹2.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹2.2 LRejected-AOC DASPARA MONIRAMPUR BARRACKPORE KOLKATA PIN 700120 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | ₹2.2 L | L3 | Rejected-AOC L3 |
Tender Value
₹2.1 L
EMD Value
₹4,277
Closing Date
24 Jan 2026, 9:00 amClosed
PRADHAN
OFFICE OF THE PRADHAN PANDU GRAM PANCHAYAT SIRISAY AMBOOTIA
Construction of covered drain 5 no Chowthara above Binay Rai house towards Lov Kumar house Pandu GP Under 15th Fc for the year 2025-26 Activity code-111248490
2025_GTA_980771_3
04/NIT/15THFC/PGP/2025-26 DT 29/12/2025
Open Tender
CIVIL WORKS
30 days
sansadII
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,277
27 Feb 2026
29 Dec 2025
31 Jan 2026
29 Dec 2025
24 Jan 2026
29 Dec 2025
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm.
Labour for laying 150mm to 200mm boulder soling including rough dressing hand packing and ramming down small pieces intheinterstics including rolling and preparing the bed to proper level without rolling but including ramming.
Cost of Stone Boulders 150mm size deliversd and stacked at site.
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
cement concrete (mix 1:3:6) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. (ii) River bazree.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
Supply and installation of Display Board
Add 18% GST
Add 1% Labour Cess
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_2391540.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid