Loading…
Loading…
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
3 Aug 2026, 5:00 pm
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
C/o boundary wall of Park P-2 in sector 33, YEIDA. WC-H
2026_YEIDA_1168792_28
YEA/GM(PROJECT)/2026/542 DT-10/07/2026
Open Tender
Civil Works
Fixed-rate
180 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,060
₹4.6 L
21 Jul 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavatd soil as directed within a lead of 50 m AR/GNIDA(AOR-Sr. no 6 item code. 2.8.1) | - | cum | 72.8 | - |
| 2 | Providing and laying in position cement concrete with 4cm gauge stone ballast, coarse sand and cement in proportion 8:4:1 , including supply of all materials, labour, Tools & plant extra for proper completion of the work. (SOR item no 281/p-17) | 1 | cum | 5,820 | ₹5,819.42 |
| 3 | M-150 brick work in 1:4 1 cement and 4 coarse sand of 2.20 FM mortar in foundation and plinth including supply of all materials, labour and T&P etc. required proper completion of the work. (SOR item no305a/ p-19) | 1 | cum | 4,950 | ₹4,949.51 |
| 4 | M-150 brick work in 1:4 1 cement and 4 coarse sand of 2.20 FM mortar in superstructure for wall of one brick thick. including supply of all materials, labour and T&P etc. required proper completion of the work. (SOR item no305a/ p-19) | 1 | cum | 5,230 | ₹5,229.48 |
| 5 | Providing and laying in position
specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (AOR sr. no 20/Item code no 5.1.2) | - | cum | 7,743 | - |
| 6 | Providing and laying in position
specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - above plinth level and up to 5th floor level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (AOR sr. no 20/Item code no 5.1.2) | 1 | cum | 8,592.05 | ₹8,591.19 |
| 7 | Steel reinforcement for RCC Work including straightening, cutting, bending,placing in position and binding all complete up to plinth level miled steel and medium tensile steel bars. (AOR-Sr. no 30 item code. 5.22.1) | - | kg | 83.5 | - |
| 8Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 8.01 | Foundations, footings, bases of columns, etc. for mass concrete (AOR Sr. no 135 item code no 5.9.1 | - | sqm | 181.65 | - |
| 8.02 | Columns , Pillars , Piers, Abutments, Posts and Struts. (AOR-Sr. no 26 item code. 5.9.6) | - | sqm | 426.8 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
BOQ_2195151.xls
BOQ • 0.29 MB
28.pdf
Tender Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].