Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
20 Feb 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Various Electricity line works in Deposit Scheme under Naveen Zila Vidyut Vikas Nidhi Yojna, in the jurisdiction of EDD-I/II Hapur/Garh, under EDC Hapur
2021_PVVNL_552216_1
34(W)/EDCH/2020-21
Open Tender
Electrical Works
Lump-sum
Hapur
Various Electricity line works in Deposit Scheme under Naveen Zila Vidyut Vikas Nidhi Yojna, in the jurisdiction of EDD-I/II Hapur/Garh, under EDC Hapur
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹5,000
20 Feb 2021
6 Feb 2021
20 Feb 2021
6 Feb 2021
20 Feb 2021
6 Feb 2021
6 Feb 2021 - 20 Feb 2021
180 days
Amount
FOR VARIOUS ELECTRICITY LINE WORKS IN DEPOSIT SCHEME UNDER NAVEEN ZILA VIDYUT VIKAS NIDHI YOJNA, IN THE JURISDICTION OF EDD-I/II, HAPUR/ GARHMUKTESHWER, UNDER EDC., HAPUR (as per list and sanctioned estimate concerned.)
Carriage of line material (Like-Cross Arm, All type Clamps, Nuts & Bolts, ACSR Conductor, Jointing Kit, XLPE Cable etc.), from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of ST Pole 11mtrs long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of PCC Pole 8.5mtrs long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of PCC Pole 9mtrs long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 25KVA T/Fs. from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 63KVA T/Fs. from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Erection & Fixing of ST Pole 11mtr long, in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection & Fixing of ST Pole 11mtr long, in 33 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Fabrication, erection and fixing of double pole on ST Pole 11 mtr. long with fixing of M.S. Top & Dropper Channel, M.S. S/S Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting as per RESPO Drawing/Norms by providing top and dropper clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection & Fixing of PCC Pole 9mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection & Fixing of PCC Pole 8.5 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Fabrication, erection and fixing of double pole on PCC Pole 8.5 mtr. long with fixing of M.S. Top & Dropper Channel, M.S. S/S Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting as per RESPO Drawing/Norms by providing top and dropper clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection & fixing of PCC pole 8.5 mtr. in L.T. Line after digging of suitable pits including fixing of all accessories by providing L.T. Pin Clamp made of M.S. Flat of size 50x6mm & Shackle Insulator of size 90x75 mm & proper size nuts and bolts as per RESPO Drawing/Norms.
Mounting of 25KVA T/F. Placing and connecting from LT/HT side of 11KV, following T/F as per RESPO Norms.
Mounting of 63KVA T/F. Placing and connecting from LT/HT side of 11KV, following T/F as per RESPO Norms.
Mounting of old & used 63KVA T/F. Placing and connecting from LT/HT side of 11KV, following T/F as per RESPO Norms.
Fabrication & Fixing of T-Channel on pole by providing Holding Clamps, F-Clamps & Proper size nuts & bolts, as per RESPO/Norms.
Laying , Stringing and final sagging of ACSR weasel conductor after binding from Insulator as per RESPO/Drawing Norms.
Laying , Stringing and final sagging of ACSR Rabbit conductor after binding from Insulator as per RESPO/Drawing Norms.
Laying , Stringing and final sagging of ACSR Dog conductor after binding from Insulator as per RESPO/Drawing Norms.
Laying of LT ABC Conductor (3x120+1x95+1x16)Sqmm etc., and completion work properly as per RESPO/Norms
Laying of LT PVC Cable and completion work properly as per RESPO/Norms.
Laying of 11KV XLPE ABC Conductor (3x120)Sqmm etc., and completion work properly as per RESPO/Norms
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts.
Grouting of following supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials.
Erection & Fixing of 11KV V-type M.S. X-arm on existing pole including providing holding clamps and Nuts & Bolts as per RESPO/Norms.
Erection & Fixing of Distribution Box on pole by provding 02 Nos. D/B Clamps & proper size nut & bolts.
Providing & Fixing of Danger Board alongwith all required accessories (like suitable clamps, nuts & bolts etc.) as per RESPO/Drawing Norms.
Erection & Fixing of 11KV Disc Insulator with fitting on existing pole including providing Nuts & Bolts as per RESPO/Norms.
Erection & Fixing of 11KV Pin Insulator on existing pole including providing Nuts & Bolts as per RESPO/Norms.
Providing & Fixing of LT Clamps.
Providing & Fixing of Peircing Clamps.
Providing & Fixing of Suspension Clamps.
Providing & Fixing of Eye-Hook.
Providing & Fixing of Dead End Clamps.
Making and filling of 11KV XLPE Cable Jointing Kit Indoor/outdoor type, suitable for 11XLPE Cable as per RESPO Norms.
Removal of old & used 33KV Pin Insulator with Pin nust bolts and opening of all accessories.
Removal of old & used 11KV Disc Insulator with Pin nust bolts and opening of all accessories.
Removal of old & used 33KV MS Channel X-Arm and opening of all accessories.
Safely Dismantling & Removal of 25KVA T/F at old D/P and opening of all accessories.
Safely Dismantling & Removal of 63KVA T/F at old D/P and opening of all accessories.
Removal of Old & used/Scrap Acsr weasel Conductor from insulator and opening of all accessories and bundling the same.
Dismantling of Old & used/Srap ST pole after digging of suitable pits and opening of all accessoris.
Carriage of old & used/scrap ACSR weasel Conductor (860Kg and as per sanctiond estimate), from site of work to Electricity Store Center, Hapur/JE Store with loading and unloading at both ends on Kachha Packka road.
Carriage of old & damaged ST Pole from site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road.
Carriage of old & used 25KVA T/F from site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road.
Jumpering work properly as per RESPO/Norms.
DUSHYANT ENTERPRISES
MOHAN LAL CONSTRUCTION COMPANY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .