| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | ₹15.8 L Quoted ₹14.1 L | L1 | Accepted-AOC Quoted lowest amount |
| 2 | L2₹14.3 L+₹15,723.66 (1.11%)Rejected-AOC | ₹14.3 L+₹15,723.66 (1.11%) | L2 | Rejected-AOC Not quoted lowest amount |
| 3 | L2₹17.4 L+₹3.3 L (23.2%)Rejected-AOC | ₹17.4 L+₹3.3 L (23.2%) | L2 | Rejected-AOC Not quoted lowest amount |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-complying of BQR |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-complying of BQR |
Tender Value
₹37.7 L
EMD Value
₹94,000
Closing Date
13 Feb 2023, 11:00 amClosed
The Superintending Engineer-MP and ORs,
Electricity Department, No.137, Nethaji Subash Chandra Bose Salai, Puducherry - 60 5001
Repairing and Supply of Spares for 19 Nos. of 11/0.433KV sick Distribution Transformers (4 Nos. of 100 KVA, 9 Nos. of 200 KVA and 6 Nos. of 315 KVA) available in SPM section, Electricity Department, Puducherry
2023_EDCC_11941_1
e. No.18/ED/EE-SPM and Bldgs./2022-2023
Open Tender
Electrical Works
Works
20 days
Head office, Electricity Department
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
The Executive Engineer-SPM and Buildings, PED
₹94,000
Yes
18 Apr 2023
6 Feb 2023
13 Feb 2023
6 Feb 2023
13 Feb 2023
6 Feb 2023
6 Feb 2023 - 13 Feb 2023
HV Coil SE Copper / Kg for 100 KVA
H.T. Bushings Insulator (I.S. 3347 ) for 100 KVA
L.T. Bushings Insulator(I.S. 3347) for 100 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 100 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 100 KVA
Breather for 100 KVA
Wheel valve of size 1 ¼”each (superior quality) for 100 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 100 KVA
C.R.G.O Lamination for 100 KVA
Radiator Fins for 100 KVA
Inter coil Insulation per limb for 100 KVA
Re-insulation of L.V. Coils for 100 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 100 KVA
Gray Paint for outer side of Distribution Transformer for 100 KVA
Gasket for tank cover / Transformer for 100 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 100 KVA
Opening, lifting the core and re-Examination: Per Transformer for 100 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 100 KVA
Electrical connections: Star Connection for 100 KVA
Electrical connections : Delta Connection for 100 KVA
Cleaning tank, tubes, conservator tank etc., internal surface of and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 100 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 100 KVA
Charges for hot oil circulation after filling for 100 KVA
Drying out of the repaired core after assembling the coils for 100 KVA
Welding per cm for 100 KVA
Total amount for repairing of 1 No. of 11KV, 100KVA Distribution Transformer
Total amount for repairing of 4 Nos. of 11KV, 100KVA Distribution Transformer (A)
HV Coil SE Copper / Kg for 200 KVA
H.T. Bushings Insulator (I.S. 3347 ) for 200 KVA
L.T. Bushings Insulator(I.S. 3347) for 200 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 200 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 200 KVA
Breather for 200 KVA
Wheel valve of size 1 ¼”each (superior quality) for 200 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 200 KVA
C.R.G.O Lamination for 200 KVA
Radiator Fins for 200 KVA
Inter coil Insulation per limb for 200 KVA
Re-insulation of L.V. Coils for 200 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 200 KVA
Gray Paint for outer side of Distribution Transformer for 200 KVA
Gasket for tank cover / Transformer for 200 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 200 KVA
Opening, lifting the core and re-Examination: Per Transformer for 200 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 200 KVA
Electrical connections: Star Connection for 200 KVA
Electrical connections : Delta Connection for 200 KVA
Cleaning tank, tubes, conservator tank etc., internal surface of and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 200 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 200 KVA
Charges for hot oil circulation after filling for 200 KVA
Drying out of the repaired core after assembling the coils for 200 KVA
Welding per cm for 200 KVA
Total amount for repairing of 1 No. of 11KV, 200KVA Distribution Transformer
Total amount for repairing of 9 Nos. of 11KV, 200KVA Distribution Transformer (B)
HV Coil SE Copper / Kg for 315 KVA
H.T. Bushings Insulator (I.S. 3347 ) for 315 KVA
L.T. Bushings Insulator(I.S. 3347) for 315 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 315 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 315 KVA
Breather for 315 KVA
Wheel valve of size 1 ¼”each (superior quality) for 315 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 315 KVA
C.R.G.O Lamination for 315 KVA
Radiator Fins for 315 KVA
Inter coil Insulation per limb for 315 KVA
Re-insulation of L.V. Coils for 315 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 315 KVA
Gray Paint for outer side of Distribution Transformer for 315 KVA
Gasket for tank cover / Transformer for 315 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 315 KVA
Opening, lifting the core and re-Examination: Per Transformer for 315 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 315 KVA
Electrical connections: Star Connection for 315 KVA
Electrical connections : Delta Connection for 315 KVA
Cleaning tank, tubes, conservator tank etc., internal surface of and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 315 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 315 KVA
Charges for hot oil circulation after filling for 315 KVA
Drying out of the repaired core after assembling the coils for 315 KVA
Welding per cm for 315 KVA
Total amount for repairing of 1 No. of 11KV, 315KVA Distribution Transformer
Total amount for repairing of 6 Nos. of 11KV, 315KVA Distribution Transformer (B)
Unit Rate Total
SAKTHI TRANSFORMERS
AUROTECH TRANSFORMERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .